Letter Sequence RAI |
---|
TAC:ME0100, Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec (Open) |
|
MONTHYEARML0831201222008-11-0606 November 2008 License Amendment Request No. 326 to Adopt TSTF-490-A, Revision 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification Using the Consolidated Line Item Improvement.. Project stage: Request ML0833903042008-12-0505 December 2008 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-490-A, Revision 0, Deletion of E Bar Definition & Revision to Reactor Coolant System Specific Activity TS Project stage: Acceptance Review ML0834702492008-12-11011 December 2008 Response to Request for Supplemental Information on License Amendment Request No. 326 to Adopt TSTF-490-A, Revision 0, Deletion of E Bar Definition & Revision to Reactor Coolant System Specific Activity Ts... Project stage: Supplement ML0900701522009-01-21021 January 2009 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-490-A, Revision 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical. Project stage: Acceptance Review ML0909907262009-06-24024 June 2009 Request for Additional Information Regarding License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-490-A Project stage: RAI TMI-09-082, Response to Request for Additional Information Related to License Amendment Request No. 326 to Adopt TSTF-490-A, Revision 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical....2009-07-0202 July 2009 Response to Request for Additional Information Related to License Amendment Request No. 326 to Adopt TSTF-490-A, Revision 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical.... Project stage: Response to RAI TMI-09-134, Request for Extension of the Implementation Period for License Amendment Request No. 326 to Adopt TSTF-490-A, Rev. 0, Deletion of E Bar Definition & Revision to Reactor Coolant System Specific Activity....2009-10-0202 October 2009 Request for Extension of the Implementation Period for License Amendment Request No. 326 to Adopt TSTF-490-A, Rev. 0, Deletion of E Bar Definition & Revision to Reactor Coolant System Specific Activity.... Project stage: Request ML0929906502009-11-0505 November 2009 Request for Additional Information Regarding License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-490-A Project stage: RAI TMI-09-148, Response to Request for Additional Information Re License Amendment Request No. 326 to Adopt TSTF-490-A, Rev. 02009-11-24024 November 2009 Response to Request for Additional Information Re License Amendment Request No. 326 to Adopt TSTF-490-A, Rev. 0 Project stage: Response to RAI ML1003204932010-03-11011 March 2010 License Amendment Technical Specification Changes Adopting TSTF-490-A, Revision 0, Deletion of E-Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification Project stage: Acceptance Review 2009-10-02
[Table View] |
|
---|
Category:Letter
MONTHYEARRS-24-097, Notice of Intent to Pursue Subsequent License Renewal for Three Mile Island Nuclear Station, Unit 12024-10-23023 October 2024 Notice of Intent to Pursue Subsequent License Renewal for Three Mile Island Nuclear Station, Unit 1 ML24256A0422024-10-0404 October 2024 Updated Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24242A3032024-09-0909 September 2024 Letter - Three Mile Island Station, Unit 2, Issuance of Amendment No. 68, Historic and Cultural Resources IR 05000320/20240012024-08-28028 August 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report Nos. 05000320/2024001 and 05000320/2024002 ML24240A2222024-08-27027 August 2024 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24220A2742024-08-15015 August 2024 Request for Additional Information Clarification Call Regarding Three Mile Island Station, Unit 2, Amended Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24135A3292024-08-0909 August 2024 Amendment No 68, Historic and Cultural Resources Cover Letter IR 07200077/20240012024-06-18018 June 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 07200077/2024001 ML24157A3672024-06-13013 June 2024 Updated Post-Shutdown Decommissioning Activities Report Request for Additional Information Transmittal Letter ML24135A1972024-06-13013 June 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0091 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24120A3242024-05-24024 May 2024 TMI-2 Email to Fws RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24121A2472024-04-29029 April 2024 And Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report ML24120A2552024-04-29029 April 2024 Annual Radiological Environmental Operating Report ML24113A0212024-04-18018 April 2024 (TMI-2), Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24092A0012024-03-28028 March 2024 (TMI-2), Decommissioning Trust Fund Annual Report ML24088A0122024-03-28028 March 2024 Notification of Amended Post-Shutdown Decommissioning Activities Report (PSDAR) in Accordance with 10 CFR 50.82(a)(7), Revision 6 ML24065A0042024-03-28028 March 2024 Submittal of 2023 Aircraft Movement Data Annual Report ML24085A2152024-03-25025 March 2024 (TMI-2) - Annual Notification of Property Insurance Coverage RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. ML24052A0602024-03-20020 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0061 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24075A0062024-03-14014 March 2024 List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24074A3922024-03-14014 March 2024 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML24073A2312024-03-13013 March 2024 And Three Mile Island Nuclear Station, Unit 2 - Management Change ML24044A0092024-02-12012 February 2024 License Amendment Request – Three Mile Island, Unit 2, Historic and Cultural Resources Review, Response to Request for Additional Information IR 05000320/20230042024-02-0707 February 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023004 ML24038A0222024-02-0505 February 2024 Achp Letter on Section 106 Programmatic Agreement Participation IR 05000289/20230062024-01-29029 January 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 05000289/2023006 ML23342A1242024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23325A1092024-01-0505 January 2024 Review of the Management Plan for Three Mile Island Station, Unit No. 2, Debris Material ML23354A2062023-12-20020 December 2023 (TMI-2), Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23354A2112023-12-20020 December 2023 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 IR 05000320/20230032023-11-28028 November 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report No. 05000320/2023003 ML23243A9082023-08-29029 August 2023 Shpo Letter to TMI-2 Regarding Section 106 Activities IR 05000320/20230022023-08-17017 August 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023002 ML23216A1732023-08-14014 August 2023 Consultation Letter to Christine Turner for TMI-2 ML23216A1782023-08-14014 August 2023 Consultation Letter to Steve Letavic for TMI-2 IR 05000289/20230052023-08-14014 August 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report 05000289/2023005 ML23216A1752023-08-14014 August 2023 Consultation Letter to Joanna Cain for TMI-2 ML23216A1742023-08-14014 August 2023 Consultation Letter to David Morrison for TMI-2 ML23216A1772023-08-14014 August 2023 Consultation Letter to Rebecca Countess for TMI-2 ML23221A1402023-08-0808 August 2023 (TMI-2), Response to Requests for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML23200A1882023-07-31031 July 2023 TMI-2 Correction Letter Amendment 67 ML23209A7632023-07-28028 July 2023 Letter from PA Shpo to TMI-2 Solutions on Cultural and Historic Impacts of Decommissioning ML23192A8272023-07-10010 July 2023 TMI-2 Solutions, LLC - Response to Shpo Request for Additional Information for Er Project 2021PR03278.006, TMI-2 Decommissioning Project ML23167A4642023-07-0505 July 2023 Letter - TMI-2- Exemption 10 CFR Part 20 Append G Issuance ML23167A0312023-06-28028 June 2023 Acceptance Review and Schedule for the Request for Exemption from a Requirement from 10 CFR 20, Appendix G, Section Iii.E, EPID L-2023-LLE-0016 2024-09-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24220A2742024-08-15015 August 2024 Request for Additional Information Clarification Call Regarding Three Mile Island Station, Unit 2, Amended Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24157A3672024-06-13013 June 2024 Updated Post-Shutdown Decommissioning Activities Report Request for Additional Information Transmittal Letter ML24011A2352024-01-11011 January 2024 Eco Request for Additional Information for 2023 License Amendment Request 1-11-24 ML23187A0202023-06-29029 June 2023 TMI Unit 2 RAI Related to the Amended Post-Shutdown Decommissioning Activities Report ML23187A0332023-06-29029 June 2023 TMI Unit 2, PSDAR Rev. 5 RAIs ML23082A3432023-03-31031 March 2023 Enclosure - RAI - Three Mile Island, Unit 2 - Acceptance Review and Request for Additional Information for the Historic and Cultural Resources License Amendment Request - EPID: 2023-LLA-0026 ML22357A0142022-12-22022 December 2022 NRC Request for Additional Information Related to the TMI-2 Pdms Transition License Amendment Request ML22210A0882022-07-29029 July 2022 Enclosure - Three Mile Island, Unit No. 2 - Request for Additional Information for Requested Licensing Action Regarding Decommissioning Technical Specifications ML22143A8902022-05-23023 May 2022 Request for Additional information- TMI-1 ISFSI Only Physical Security License Amendment Request ML22125A0122022-04-28028 April 2022 Clarification RAI Partial Response Email from C Smith to a Snyder ML22110A0202022-04-19019 April 2022 Unit 1 Request for Additional Information ML22038A9362022-02-0707 February 2022 TMI2 Accident Analyses Questions ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML20164A0902020-06-10010 June 2020 Request for Additional Information Related to TMI-1 License Amendment Request to Delete Permanently Defueled Technical Specification 3/4.1.4 (L-2019-LLA-0250) ML19319B2082019-11-15015 November 2019 NRR E-mail Capture - Request for Additional Information Related to TMI-1 Request for Exemption from Portions of 10 CFR 50.47 and Part 50 Appendix E (L-2019-LLA-0216) ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML18220A7832018-08-0707 August 2018 NRR E-mail Capture - Request for Additional Information Related to TMI Fall 2017 Steam Generator Tube Inspection Report ML18212A2712018-07-31031 July 2018 NRR E-mail Capture - Request for Additional Information Related to Amendment Regarding Decommissioning ERO Staffing Changes ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17062A4912017-03-0303 March 2017 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) ML16356A4802016-12-21021 December 2016 NRR E-mail Capture - RAIs on TMI License Amendment Request for Approval of Changes to the Three Mile Island Nuclear Station Emergency Plan Related to Staffing ML16337A0072016-12-0101 December 2016 NRR E-mail Capture - Draft RAIs Three Mile Island Nuclear Station, Units 1 and 2, License Amendment Request for Approval of Changes to the Three Mile Island Nuclear Station Emergency Plan Related to Staffing ML16287A4042016-10-11011 October 2016 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML15230A5332015-08-18018 August 2015 Draft Request for Additional Information ML15020A7372015-03-0808 March 2015 Request for Additional Information Regarding Related to December 22, 2014, Report Submitted Pursuant to 10 CFR 50.46 ML14307A1172014-11-14014 November 2014 Request for Additional Information Regarding Relief Request RR-14-01 Concerning Alternative Root Mean Square Depth Sizing Requirements ML14240A4122014-09-0404 September 2014 Request for Additional Information Regarding License Amendment Request to Eliminate Certain Technical Specification Reporting Requirements (Tac MF0628) ML14134A3222014-05-22022 May 2014 Request for Additional Information Regarding Review of Three Mile Island Nuclear Station Unit 1 Cycle 20 Core Operating Limits Report ML14134A1722014-05-14014 May 2014 Draft RAIs in Support of NRC Staff Review of TMI Cycle 20 COLR ML14052A2592014-02-27027 February 2014 Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specification Reporting Requirements ML14030A5832014-01-29029 January 2014 Draft Request for Additional Information Proposed Revision to Technical Specifications Reporting Requirements Exelon Generation Company, LLC Three Mile Island Nuclear Station, Unit 1 ML13266A2852013-10-21021 October 2013 Request for Additional Information on Three Mile Island Nuclear Station Unit 2 - post-shutdown Decommissioning Activities Report ML13276A6492013-10-0303 October 2013 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML13269A1792013-09-25025 September 2013 Draft Request for Additional Information ML13253A2252013-09-10010 September 2013 Draft Request for Additional Information ML13249A2072013-09-0505 September 2013 Draft Request for Additional Information ML13193A1752013-07-22022 July 2013 Request for Additional Information Regarding Revision to Pressure and Temperature Limit Curves and Exemption Request for Initial Reference Temperature Values ML13196A3382013-07-15015 July 2013 2013 Decommissioning Fund Report RAI ML13193A1452013-07-12012 July 2013 Electronic Transmission, Draft Request for Additional Information Regarding Proposed Revision to Pressure and Temperature Limit Curves and Exemption Request for Initial Reference Temperature Values (TAC Nos. MF0425 & MF0426) ML13176A4702013-06-26026 June 2013 Request for Additional Information Regarding Overall Integrated Plan in Response to Order Number EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13177A3902013-06-26026 June 2013 Electronic Transmission, Draft Request for Additional Information Regarding Overall Integrated Plan in Response to Order Number EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13066A2442013-03-19019 March 2013 Request for Additional Information Regarding Fifth Inservice Test Interval Relief Request PR-01 Nuclear Services Closed Cooling Water Flow Measurement ML13066A1262013-03-0707 March 2013 Electronic Transmission, Draft Request for Additional Information Regarding Fifth Inservice Test Interval Relief Request PR-01 Nuclear Services Closed Cooling Water Flow Measurement ML13044A3212013-03-0505 March 2013 Request for Additional Information Regarding 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML13045A6432013-02-25025 February 2013 Request for Additional Information Regarding Relief Request VR-01, Associated with the Fifth Inservice Testing Interval ML13051A3852013-02-25025 February 2013 Request for Additional Information Regarding End-of-Interval Relief Request RR-12-01, Pressure Nozzle-to-Head Weld Exams ML13050A6362013-02-20020 February 2013 Draft RAI Memo ML13044A3122013-02-13013 February 2013 Electronic Transmission, Draft Request for Additional Information Regarding 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML13044A6652013-02-13013 February 2013 Electronic Transmission, Draft Request for Additional Information Regarding Relief Request VR-01, Associated with the Fifth Inservice Testing Interval 2024-08-15
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 24, 2009 Mr. Charles Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville,IL 60555 SUB~IECT: THREE MILE ISLAND NUCLEAR STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST TO ADOPT TECHNICAL SPECIFICATION TASK FORCE TRAVELER TSTF-490-A (TAC NO. ME0100)
Dear Mr. Pardee:
By letter dated November 6, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML083120122), supplemented by letter dated December 11, 2008, (ADAMS Accession No. ML083470249), AmerGen Energy Company, LLC (the licensee, now Exelon Generation Company, LLC) submitted a license amendment request regarding proposed changes to the technical specifications (TSs) for Three Mile Island Nuclear Station, Unit 1 (TMI-1). The proposed amendment would replace the current TMI-1 TS limit on Reactor Coolant System (RCS) gross specific activity with a new limit on RCS noble gas specific activity. The noble gas specific activity limit would be based on a new dose equivalent Xenon-133 definition that would replace the current E Bar average disintegration energy definition. In addition, the current dose equivalent lodine-131 definition would be revised.
The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information. The questions were sent via electronic transmission on May 1, 2009, to Ms. Wendi Croft of your staff. The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. The questions were discussed in a teleconference with your staff on June 4,2009. It was agreed that a response would be submitted by July 10, 2009. If a response is not received by that date, the license amendment request will be subject to denial, pursuant to Title 10 of the Code of Federal Regulations, Section 2.108, "Denial of application for failure to supply information."
-2 Please contact me at 301-415-2833, if you have any questions.
Sincerely, rJd~~f~1.fT""'I7 Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289
Enclosure:
As stated cc: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 REQUEST FOR ADDITIONAL INFORMATION THREE MILE ISLAND, UNIT 1 LICENSE AMENDMENT REQUEST TO ADOPT TSTF-490-A, DELETION OF E BAR DEFINITION AND REVISION TO REACTOR COOLANT SYSTEM SPECIFIC ACTIVITY TECHNICAL SPECIFICATON DOCKET 1\10. 50-289 By letter dated November 6,2008, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML083120122), supplemented by letter dated December 11,2008, (ADAMS Accession No. ML083470249), AmerGen Energy Company, LLC (the licensee, now Exelon Generation Company, LLC) submitted a license amendment request regarding proposed changes to the technical specifications (TSs) for Three Mile Island, Unit 1 (TMI-1). The proposed amendment would replace the current TIVII-1 TS limit on Reactor Coolant System (RCS) gross specific activity with a new limit on RCS noble gas specific activity. The noble gas specific activity limit would be based on a new dose equivalent Xenon-133 (DEX) definition that would replace the current E Bar average disintegration energy definition. In addition, the current dose equivalent lodine-131 (DEI) definition would be revised. The Nuclear Regulatory Commission (NRC) staff has been reviewing the submittal and has determined that additional information is needed to complete its review.
1.) The proposed Inserts 1 and 2 contained in the letter dated November 6, 2008, provide definitions for DEI and DEX, respectively. These definitions indicate that DEI and DEX may be determined using several references for dose conversion factors (DCFs). However, the purpose of the limiting condition for operation (LCO) for DEI and DEX is to satisfy Title 10 of the Code of Federal Regulations (10 CFR), Section 50.36, criterion 2, which establishes an operating restriction that is an initial condition of a design-basis accident (DBA). When surveillance of the RCS radionuclides is performed, each acceptable set of DCFs will yield a different DEI and DEX. As approved by the NRC staff, the intent of Technical Specification Task Force Traveler (TSTF)-490 was to allow the licensee to select, from the acceptable list, one DCF reference for the calculation of DEI, and one DCF reference for the calculation of DEX. Therefore, consistent with 10 CFR 50.36 and TSTF-490, the licensee should specify one DCF reference for each definition, which will be consistent with the specified LCO and DBA analysis, or justify why a list of several DCFs is consistent with the specified LCO and DBA analysis. Therefore, please justify how the use of multiple DCFs maintains consistency with the specified LCO values and DBA analyses or provide revised definitions for DEI and DEX that specify one DCF reference for each definition.
Enclosure
-2 2.) Consistent with the safety evaluation for TSTF-490, please confirm that the site specific limits for both DEI and DEX, and the DCFs used for the determination of DEI and DEX surveillances, are consistent with the current design bases radiological dose consequence analyses (for example, steam generator tube rupture and main steam line break). For DEX, please provide the information necessary (dose conversion factors and RCS radioisotopic concentrations) for the NRC staff to verify the proposed value in the LCO.
3.) The proposed TS Table 4.1-3, item 1(a) requires a verification that DEX is less than or equal to 797 microcuries/gram. The TS bases submitted with the application letter dated November 6, 2008 (Insert 6), state that "Due to the inherent difficulty in detecting [Krypton] Kr-85 in a reactor coolant sample due to masking from radioisotopes with similar decay energies, such as [Fluorine] F-18 and 1-134, that it is acceptable to include the minimum detectable activity of Kr-85 in the [surveillance requirement] SR Table 4.1-3 calculation."
If no or little "masking" occurs, the use of the minimum detectible activity of Kr-85 would underestimate the amount of Kr-85 present in the reactor coolant sample.
Therefore, please justify why use of the minimum detectable Kr-85 is an acceptable and conservative approach for performing this surveillance.
4.) Inserts 4 and 5, contained in the letter dated November 6, 2008, refer to REFUELING as a mode in capital letters, indicating that REFUELING is defined in the TS Definition section. However, the current TMI-1 TS Definition section contains references to REFUELING SHUTDOWN, REFUELING OPERATION, and REFUELING INTERVAL, but not REFUELING. Please clarify the intended mode of applicability relating to inserts 4 and 5.
-2 Please contact me at 301-415-2833, if you have any questions.
Sincerely,
/raJ Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289
Enclosure:
As stated cc: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsOgcRp Resource LPLI-2 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrPMPBamford Resource RidsNrrDraAadb Resource RidsRgn1MailCenter Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl1-2 Resouce JWiliiams, NRR RGrover, NRR RidsNrrLAABaxter Resource MBlumberg, NRR ADAMS Accession Number" ML090990726 OFFICE LPL1-2/PM LPL1-2/LA MDB/BC LPLI-2/BC NAME PBamford ABaxter RTaylor HChernoff DATE 6/4/09 6/10/09 6/16/09 6/24/09 OFFICIAL RECORD COPY