Text
Sep. 08, 2008 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2008-44430 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSE M 09/08/2008 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS
- FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 07/30/2008 ADD MANUAL TABLE OF CONTENTS DATE: 09/05/2008 CATEGORY: DOCUMENTS TYPE: TRM2
/,00(
Sep. 08, 2008 Page 2 of 2 ID: TEXT 3.7.7 ADD: REV: 2 REMOVE: REV:l CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT LOES ADD: REV: 47 REMOVE: REV:46 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 09/05/2008 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 47 09/05/2008
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 13 01/31/2008
Title:
TABLE OF CONTENTS TEXT 1.1 0 11/19/2002
Title:
USE AND APPLICATION DEFINITIONS/
TEXT 2.1 1 02/04/2005<; '/
Title:
PLANT PROGRAMS AND SETPOINTS PLANT -PROGRAMIS/
TEXT 2.2 7 0523/200
Title:
PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 4 \05/23/2008
Title:
APPLICABILITY TECHNICA REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 i 11/09/2007 -
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD-INJECTI'ONJ('ATWS-ARIT) INSTRUMENTATION TEXT 3.1.2 \ 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 3 04/09/2007
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 7 04/19/2007
Title:
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
- age-_ .of - - -.- Report- Date: 09/05/08
SsE)ý -;ý.,NUTAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL-UNIT 2 0 TEXT 3.3.1 0 11/19/2002'
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 2 11/09/2007
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 1i1/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION..
TEXT 3.3.4 5 05/23/2008
Title:
INSTRUMENTATION TRM POST-ACCIDENT.,MONITORING INSTRUMENTATION TEXT 3.3.5 0 1-1/1.k9,/20o02
Title:
INSTRUMENTATION-THIS PAGE INTENTIONALLY LEFT/BLANK.
TEXT 3.3.6 2 10/19/2005
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION: INSTRUMENTATION TEXT 3.3.7 1 11/q9/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEMý TEXT 3.3.8 1 10/2ý2/2003,
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION -
TEXT 3.3.9 2 04/09/2007
ýTitle:. INSTRUMENTATION LPRIM UPSCALE.ALARM INSTRUMENTATION TEXT 3.3.10 1 12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATIONIPUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003,
Title:
INSTRUMENTATION MVP ISOLATION, INSTRUMENTATION TEXT 3.4.1 1 04/26/2006
Title:
REACTOR COOLANT' SYSTEM REACTORCOOLANT SYSTEM CHEMISTRY Report.Date: 09/05/08 Page2' Page 2 , of of 15 15 Report Date: 09/05/08
S S-I W4A"NUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2" TEXT 3.4.2 0 11/19/2002
Title:
REACTOR COOLANT*SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)-
TEXT 3.4.4 1 12/14/2,004
Title:
REACTOR COOLANT SYSTEM-REACTOR:RECIRCULATION FLOW AND ROD LINE LIMIT ...
TEXT 3.4.5 1 0'4k26/-2b06
Title:
REACTOR COOLANT SYSTEM REACTOR'VESSEL MATERIALS TEXT 3.5.1 1 02'/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/04/2007
Title:
ECCS ANDRCIC ECCS AND'`RCIC SYSTEMMONITORING INSTRUMENTATION, TEXT 3.5.3 0 11/19/2002*
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY tTO ADS TEXT 3.6.1 0 1i/19/-2002-
Title:
CONTAINMENT VENTING OR PURGING .:.-'...
TEXT 3.6.2 0 11/19/2002
Title:
CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL- VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/19/2002;
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION ý -
TEXT 3.6.4 0 11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT- CLOSED' SYSTEMBOUNDARIES '.
TEXT 3.7.1 0 /19202
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER 'SYSTEM (ESW) SHUTDOWN
... . . . ,of" .Repor- iDate: 09/05/08..
Page 3 of 15 Report Date: 09/05/08
,'SSRS *WUMAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL' UNIT. 2 TEXT 3.7.2 0- , 1 /,19/2002,
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 1 04/26/2006
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM -'
TEXT 3.7.3.2 2 04/26/2006
Title:
PLANT- SYSTEMSý SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 2 08/:18/200:5
Title:
PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 1 04/2'6,/2i006.
Title:
PLANT SYSTEMS HALON SYSTEMS -
TEXT 3.7.3.5 1 04726/62006*
Title:
PLANT SYSTEMS FIRE HOSE STATIONS". - ý : 1 7 TEXT 3.7.3.6 1 04/,26/2006:-
Title:
PLANT SYSTEMS YARD FIRE,,HYDRANTS'AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006'
Title:
PLANT SYSTEMS FIRE; RATED ASSEMBLIES' TEXT 3.7.3.8 7 11/09/2007
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04:/,26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE, SYSTEM' TEXT 3.7.5.1 0 11/19,/2002
Title:
PLANT SYSTEMS MAIN CONDENSER1 OFFGAS HYDROGEN MONITOR-TEXT 3.7.5.2 0A 11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE Report Date: 09/05/Q8 Page4 Paýfe 4 ' of Of 15 15 Report Date: 09/05/08
S~S2:11 14A\MAIL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT,..2 TEXT 3.7.5.3 1 04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUPTANKS TEXT 3.7.6 2 06/27/2008
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION, ..
TEXT 3.7.7 2 09/D5/2008..
Title:
PLANT SYSTEMS MAIN CONDENSER:OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 6 0,6/21/2007
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/-2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14`200.4
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS "(SFSPS)
TEXT 3.8.1 2 02/04/,2-005
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT.
PROTECTIVE DEVICES TEXT 3.8.2.1 2 1:1/09/2,007.,
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES,, (MOV), THERMAL OVERLOAD PROTECTION CONTINUOUS TEXT 3.8.2.2 2 12/,4/2904
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES. (MOV) THERMAL OVERLOAD PROTECTION,-
AUTOMATIC TEXT 3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER DIESEL GENERATOR.(<DO) -MAINTENANCE ACTIVITIES, TEXT 3.8.4 1 002/04/2005
Title:
ELECTRICAL POWER 24 VDC ELECTRICALi-SýBSYSTEM TEXT 3.8.5 '- ..
_0<< 11/19/2002
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION.
Report Date~ 09/05/08 Page .5.
Page 5 of of 15 15 Report Date: 09/05/08
SSE'S IMMUAfLT Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.6 0 11/19/2002
Title:
ELECTRICAL POWER,'EMERGENCY SWITCHGEARI ROOM COOLING TEXT 3.8.7 0 12/14/20016
'Title: BATTERY MAINTENANCE AND :MONITORING PROGRAM, TEXT 3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 1I1/19/-2002.
Title:
REFUELING OPERATIONS COMMUNICATIONS, TEXT 3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM" TEXT 3.10.1 1 04/26-/2006'
Title:
MISCELLANEOUS-'SEALED:SOURCE CONTAMINATION .
TEXT 3.10.2 1 04/-0-9/2'007
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS "IINSTRUMENTATION TEXT 3.10.3 1 04/26/200 6 Title ::MISdELLANEOUS, INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 1 08/28/2006
Title:
MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)'
TEXT 3.11.1.1 1 04/A26;/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1 041'26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLU:ENTS DOSE TEXT 3.11.1.3- 1 .. 04/26/2006
Title:
--RADIOACTIVE EFFLUENTS' LIQUID WASTE TREATMENT.SYSTEM Page* 6 of 15 Report Date: 09/05/08
-0 Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.4 1 12/14/2004"
.Title: RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 2 05/02/2007
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/20061
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006 ,
Title:
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26A2006
Title:
RADIOACTIVE EFFLUENTS DOSE -. IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/19./:2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS ,RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 3 11/14,/20Q6,
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST,ý TREATMENT- SYSTEM TEXT 3.11.2.6 3 05/.02/A2,007
Title:
RADIOACTIVE' EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/20,06
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 3 04/26/2006
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM -
TEXT 3.11.4.2 2 04/26/200.6
Title:
RADIOACTIVE EFFLUENTS LAND ,.USE .CENSUS, TEXT 3.11.4.31 . .. 04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM Report Date: 09/05/08 Page 7 Page 7 of 15 of '15 Report Date: 09/05/08
S SES - fflk'AL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.12.1 0 11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4 04/17/20068
Title:
LOADS CONTROL PROGRAM HEAVY LOADSREQUIREMENTS TEXT 3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS'REQUIREMENTS-: .
TEXT B3.0 4 05/23/2'008
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION'(TRO)Y APPLICABILITY TEXT B3.1.1 1 11/09/2007
Title:
REACTIVITY CONTROL SYSTEM'BASES ANTICIPATED TRANSIENT' WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL, SYSTEM'BASES 'CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 ii/19/2002
Title:
REACTIVITY CONTROL SYSTfM 'BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 i1/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR).
TEXT B3.3.1 0 11/i9/2002
Title:
INSTRUMENTATION BASES RADIATION :M0ONITORING INSTRUMENTATION TEXT B3.3.2 1 11/09'/2007
Title:
,'INSTRUMENTATION 'BASES SEISMIC MONIt'ORING* 'INSTRUMENTATION TEXT B3.3.3 2 11/09/2007 Title.; :INSTRUMENTATION"BASES<-METEOROLOGICAL-MONITORING INSTRUMENTATION Page 8 of 15 Report Date: 09/05/ 08
SES 2NANAI Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.4' 3 11/09/2007
Title:
INSTRUMENTATION BASES TRMPOST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007:
Title:
INSTRUMENTATION BASESTHIS. PAGE :INTENTIONALLY LEFT BLANK1, TEXT B3.3.6 3 10/119/2005
Title:
INSTRUMENTATION BASES.TRM ISOLATIONACTUATION INSTRUMENTATION TEXT B3.3.7 1 -1/09/2007.
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTIONSYSTEM TEXT B3.3.8 1 10/22/2003
Title:
INSTRUMENTATION.BASES TRM.RPS INSTRUMENTATION TEXT B3.3.9 2 04/10/2007
Title:
- INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 0 11/,19/2002
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1 10/22/?2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION, TEXT B3.4.1 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES.STRUCTURALr-TNTEGRITY TEXT B3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES.,HIGH/'LOW PRESSURE INTERFACELEAKAGEMONITOR
-:& 'TEXT B3.4.4 -. . 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES-REACTOR RECIRCULATION FLOWAND ROD LINE LIMIT Report Date: 09/05/08 Page 99 of of 15 15 Report Date: 09/05/08
s §,E S, IANJA-L Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.4.5 0 11/1'9/2002.
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.5.1 0 .1'/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING -INSTRUMENTATION TEXT B3.5.3 1 i1/09j/2007
Title:
ECCS AND RCIC BASES LONG'TERM NITROGEN SUPPLY TO'ADS-TEXT B3.6.1 0 1i/194/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRY'ELL VACUUM BREAKER-POSITION INDICATION TEXT B3.6.3 1 04/19/2007 -
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 -f2/14,/2000
Title:
CONTAINMENT BASES-PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERV-ICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11'/19/.2002
Title:
PLANT SYSTEMS BASES ULTIMATE 'HEAT SINK'!(UHS) GROUND WATER LEVEL TEXT B3.7.3.1 2 01/07-/2008
Title:
PLANT SYSTEMS BASES FIRE *SuPPESSION wATER SUPPLY SYSTEM ,
TEXT B3.7.3.2 2 04/26/2006
-, * °:-T*itr
-. PLANT'-SYSTEMS BASES SPRAY-AND SPR-INKLER 'SYSTEMS Page 10 of 15 Report Date: 09/05/08
SSES" MA.NTAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 1 04/26,/2006
Title:
PLANT SYSTEMS BASES HALON SYSTEMS, TEXT B3.7.3.5 1 04-/26/2006
Title:
PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 1/!19/2002
Title:
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 1 01/12/2004
Title:
PLANT SYSTEMS-BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002
Title:
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002
Title:
PLANT ,SYSTEMS BASES MAIN-CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2.002
Title:
PLANT SYSTEMS BASES MAIN .CONDENSER .OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2,002
Title:
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS-,.
TEXT B3.7.6 2 06/27d2008
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSEVENTILATION TEXT B3.7.7 i2 01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION
_j Page 11 of 15 R D9 ReportDate:' 09/05/08
7' S~PSES I TJAL Manual Naine: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 ,.
TEXT B3.7.8 3 06/21/2007
Title:
PLANT SYSTEMS BASES SNUBBERS J:
TEXT B3.7.9 1 12/14/2004
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004
Title:
-PLANT SYSTEMS BASES SPENT-FUEL STORAGE POOLS, TEXT B3.8.1 1 02/0'4/2005
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT .PENETRATION-CONDUCTOR*OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11,/f9/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV).THERMAL OVERLOAD PROTECTION CONTINUOUS TEXT B3.8.2.2 1 09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0 i1/19/2002
Title:
ELECTRICAL POWER BASES DIESEL-GENERATOR (DG)F'MAINTENANCE ACTIVITIES TEXT B3.8.4 0 I11.9/2002
Title:
ELECTRICAL POWER BASESý 24CVDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 0 114,19/2002
Title:
ELECTRICAL POWER BASES DEGRADED, VOLTAGE PROTECTION TEXT B3.8.6 1 02/04/2005
Title:
ELECTRICAL POWERA'BASESEMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 0 12/1f4/2006
Title:
BATTERY MAINTENANCE`AND MONITORING" PROGRAM
- *TEXT B3.9.1 0 11/19/2002
-,Title:-REFUELING OPERATIONS BASES-DECAY-TIME" Page 12 of 15 Report Date: 09/05/08
S E S :MANUAL~
Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCECONTAMINATION TEXT B3.10.2 1 04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TESTRPS INSTRUMENTATION TEXT B3.10.3 0 11/19/,2002
Title:
MISCELLANEOUS BASES INDEPENDENT ,SPENT FUEL STORAGE INSTALLATION (ISFSI),
TEXT B3.10.4 0 11/19-/2002
Title:
MISCELLANEOUS BASES LEADING EDGE FLOW METER,(LEFM)
TEXT B3.11.1.1 0 11/19/.2002
.Title: RADIOACTIVE EFFLUENTS BASES LIQUID,,EFFLUENTS CONCENTRATION, 0 i1/1.9/0021 TEXT B3.11'.1.2
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE , -
TEXT B3.11.1.3 0 11/19/20Q2
Title:
RADIOACTIVE EFFLUENTS BASES LIQUIDWASTE TREATMENT SYSTEM -
TEXT B3.11.1.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES, LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES*RADIOACTIVE-LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3-.11.2.1 -- 1i 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE-Report' Date: 09/05/08 Page 13 of of 15.
15 Report Date:' 09/05/08
SSESM1AMTAL Manual Name: TRM2 1. 1,
ý- *: ý.
0 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL iUNITT2 ý11 . fT ",
TEXT B3.11.2.2 0 11/1972002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE-- NOBLE GASES TEXT B3.11.2.3 0 11./19/2002
Title:
RADIOACTIVE EFFLUENTS BASES,,DOSE {-.'IODINE, :TRITIUM, AND. RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19'/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS!RADWASTE-TREATMENT SYSTEM' TEXT B3.11.2.5 4 11/14/200,6
Title:
RADIOACTIVE EFFLUENTS BASES VENTIL-ATION ,EXHAUST':TREATMENT 'SYSTEM<
TEXT B3.11.2.6 1 01.727/2004
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS'EFFLUENT'.MONITORING INSTRUMENTATION TEXT B3.11.3 0 1;171972002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE, TEXT B3.11.4.1 2 01/06/2006
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING.PROGRAM.
TEXT B3.11.4.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 . 0 11/19/2002
Title:
-LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS" Report Date: 09/05/08
.Page 14 Page 14 of of 2~
15 Report Date: 09/05/08
Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 4.1 ,09/27/2003
Title:
ADMINISTRATIVE CONTROLS. ORGANIZATION-TEXT 4.2 0 09/27t/2003
Title:
ADMINISTRATIVE CONTROLS. REPORTABLE EVENT ACTION TEXT 4.3 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS SAFETY-.LIMIT VIOLATION TEXT 4.4 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS PROCEDURES &i.PROGRAMS TEXT 4.5 0 09/27/200,3
Title:
ADMINISTRATIVE CONTROLS.- REPORTING-.REQUIREMENTS TEXT 4.6 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS. TRAININGs' .:. -
Report Date: 09/05/08 Page i~
Page 15 of of 1~5.
15 Report Date: 09/05/08
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 47 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 01/30/2008 1.0 USE AND APPLICATION Page TRM / 1.0-1, 08/31/1,998 Page TRM / 1.0-2 10/04/2002 Page.TRM / 1.0-3 08/31/1998 2.0 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM / 2.0-2 and TRM 2.0-3 01/28/2005 Page TRM / 2.0-4 -\06/25/2002 Page TRM / 2.0-5 6/4/12/1999 Page TRM / 2.0-6 "/03/27/2007 Page TRM / 2.0-7 \ /05/15/2008 Page TRM / 2.0-8 12/03/2004 Pages TRM / 2.0-9 through TRM / 2.0-11 11/15/2004
-V Page TRM / 2.0-12 03/27/2007 Pages TRM / 2.0-13 and TRM 2.0-14 11/15/2004 7'
Page TRM / 2.0-15 / 11/15/2005 3.0 APPLICABILITY Pages TRM / 3.0-1 and TRM /3.0-2\ , 04/14/2008 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 11/30/2005 3.1 REACTIVITY CONTROLC/SYSTEMS>
Page TRM / 3.1-1 \ " 10131/2007 Pages TRM / 3.1"-2 through/TRM / 3.1-5 08/31/1998 Pages TRM /o3/16 thrdugh TRM / 3.1-8 03/27/2007 Pages TRM/ 3.19-and TRM / 3.1-9a 02/1-8/1999 Page TRM-/ 3.171i0> 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page'TRM-/3.2-1 08/31/1998
ýPages<)T*RM / 3.2-2 through TRM / 3.2-48 03/30/2007 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1999 Pages TRM / 3.3-4 and TRM / 3.3-5 10/31/2007 Page 3.3-6 08/31/1998 Page TRM 3.3-7 10/31/2007 Page 3.3-8 08/31/1998 Page TRM / 3.3-9 04/12/2007 Page TRM / 3.3-9a 12/17/1998 Page TRM / 3.3-10 10/31/2007 Page TRM / 3.3-11 06/02/2005 Page TRM / 3.3-11 a 04/14/2008
--SUSQUEHANNA- UNIT 2 TRM'/ LOES-T U U AUTTIM /LEFEECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 47 LISTOFEFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / 3.3-12 03/30/20)01 Page TRM / 3.3-13 09/13/2005 Page TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 ,10/22/2003 Page TRM / 3.3-16 06/27/2001 Page TRM / 3.3-17 06/14/2002 Page TRM / 3.3-18 10/31/2007 Pages TRM / 3.3-19 and TRM / 3.3-20 10/22/20)03 Page TRM / 3.3-21 03/27/20)07 Page TRM / 3.3-21a 11/15/2004 Pages TRM /3.3-21b through TRM / 3.3-21d 03/27/2007 Page TRM / 3.3-22 12/03/2004 Pages TRM / 3.3-23 and TRM / 3.3-24 05/16/2003 Page TRM / 3.3-25 10/22/2003 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1998 Pages 3.4-6 through 3.4-9 08/31/1998 Page 3.4-10 10/31/2007 Page 3.4-11 08/31/1998 Page TRM / 3.4-12 12/03/2004 Page TRM / 3.4-13 03/31/2006 3.5 EMERGENCY CORE COOLING AND-RCIC Page TRM / 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM / 3.5-4 10/31/2007 Pages 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-4 08/31/1998 -
Page TRM / 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 Pages TRM / 3.6-7 through TRM I 3.6-9 12/31/2002 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 07/29/1999 Page 3.7-3 08/31/1998 Pages TRM / 3.7-4 and TRM / 3.7-5 03/31/2006 Pages TRM / 3.7-6 through TRM / 3.7-8 08/02/1999 Page TRM / 3.7-9 03/31/2006 Page TRM / 3.7-10 08/16/2005 Page TRM / 3.7-11 01/21/2000 Pages TRM / 3.7-12 and TRM / 3.7-13 08/02/1999 Page TRM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 03/31/2006 TRM / LOES-2 EFFECTIVE DATE 09/04/2008 SUSQUEHANNA UNIT 2 SUSQUEHANNX-'UNIT 2 TRM / LOES-2 EFFECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev, 47 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) -
Section Title Effective Date Page TRM/ 3.7-18 08/02/1999 Page TRM / 3.7-19 03/31/2006 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Pages TRM / 3.7-23 and TRM / 3.7-24 03/31/2006 Pages TRM / 3.7-25 and TRM / 3.7-26 08/02/1999 Page TRM / 3.7-27 10/31/2007 Page TRM / 3.7-28 11/29/2006 PageTRM / 3.7-29 11/16/2001 Page TRM / 3.7-30 11/30/2005 Page TRM / 3.7-31 11/16/2001 Page TRM /3.7-32 01/09/2004 Page TRM / 3.7-33 10/05/2002 Page TRM / 3.7-34 03/31/2006 Pages TRM / 3.7-35 and TRM / 3.7-36 02/01/1999 Pages 3.7-37 through 3.7-38 08/31/1998 Page TRM / 3.7-39 03/31/2006 Page TRM / 3.7-40 02/14/2005 Page TRM I 3.7-40a 06/20/2008 Page TRM / 3.7-41 09/04/2008 Page TRM / 3.7-42 08/31/1998 Pages TRM / 3.7-43 through TRM / 3.7-45 10/05/2006 Page TRM /3.7-46 06/07/2007 Page TRM / 3.7-47 10/05/2006 Page TRM / 3.7-48 06/07/2007 Page TRM / 3.7-49 03/09/2001 Page TRM / 3.7-50 08/16/2006 Page TRM / 3.7-51 12/03/2004 Page TRM / 3.7-52 04/15/2003 Page TRM / 3.7-53 07/29/1999 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Pages TRM / 3.8-2 and TRM / 3.8-3 01/28/2005 Page TRM / 3.8-4 01/31/2005 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Pages TRM / 3.8-7 through TRM / 3.8-10 10/31/2007 Page TRM / 3.8-11 08/10/2004 Page TRM / 3.8-12 12/03/2004 Pages 3.8-13 and 3.8-14 08/31/1998 Page TRM / 3.8-15 01/28/2005 Pages TRM / 3.8-16 and TRM / 3.8-17 04/02/2002 Page 3.8-18 02/01/1999 Page TRM / 3.8-19 04/02/2002 Page TRM / 3.8-20 02/01/1999 Pages TRM / 3.8-21 through TRM / 3.8-23 06/06/1999 Pages 3.8-24 and 3.8-25 08/31/1998 Pages TRM / 3.8-26 through TRM / 3.8-29 11/29/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-3 MEFFECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 47 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 through 3.10-4 08/30/1998 Pages TRM / 3.10-5 and TRM / 3.10-6 03/27/2007 Page TRM / 3.10-7 03/31/2006 Page TRM / 3.10-8 08/16/2006 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages 3.11-2 through 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages 3.11-7 through 3.11-9 08/31/1998 Page TRM / 3.11-10 12/03/2004 Pages 3.11-11 and 3.11-12 08/31/1998 Page TRM / 3.11-13 04/12/2007 Page TRM / 3.11-14 12/03/1004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03/31/2006 Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04102/2002 Page TRM / 3.11-23 11/14/2006 Page TRM / 3.11-24 -05/13/2005 Page TRM / 3.11-25 04/12/2007 Pages TRM / 3.11-26 through TRM / 3.11-28 01/21/2004 Page TRM / 3.11-29 12/03/2004 Pages TRM 3.11-30 through TRM / 3.11-32 01/21/2004 Page TRM / 3.11-33 03/31/2006 Page 3.11-34 08/31/1998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Pages 3.11-40 through 3.11-44 08/31/1998 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47 03/31/2006 SUSQUEHANNA - UNIT 2- TRM / LOES-4 EFFECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 47 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective [)ate 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM / 3.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/1998 TRM/L0ES5 - EFFECTIVE DATE 09/04/2008
- SUSQUEHANNA-UNIT2' SUSQUEHANNA - UNIT'2 - TRM / LOES-5-- -- .EFFECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 47 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM,/ B 3.0-3 08/31/1998 Page TRM / B 3.0-4 01/10/2007 Page TRM / B 3.0-5 04/14/2008 Page TRM / B 3.0-6 08/31/1998-Page TRM / B 3.0-7 04/12/2007 Pages TRM /B 3.0-8 through TRM / B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/15/2002 Pages TRM / B 3.0-13 and TRM / B 3.0-14 11/30/2005 Page TRM / B 3.0-15 03/15/2002 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 07/13/1999 Pages TRM / B 3.1-2 and TRM / B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1998 Pages TRM / B 3.1-5 through TRM / B 3.1-7 03/27/2007 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 04/07/2000 Pages TRM / B 3.3-2 and TRM / B-3.3-2a 10/31/2007 Pages TRM / B 3.3-3 and TRM / B 3.3-3a 10/31/2007 Pages TRM / B 3.3-4 and TRM / B 3.3-5 05/30/2006 Pages TRM / B 3.3-6 through TRM / B 3.3-9 10/31/2007 Page B 3.3-10 08/31/1998 Pages TRM / B 3.3-11 and TRM / B 3.3-12 09/13/2005 Page TRM / B 3.3-13 12/03/2004.
Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 10/31/2007 Page TRM / B 3.3-14b 06/14/2002 Pages TRM / B 3.3-15 through TRM / B 3.3-17 10/22/2003 Pages TRM / B 3.3-18 and TRM / B 3.3-19 03/27/2007 Pages TRM / B 3.3-19a through TRM / B 3.3-19e 03/27/2007 Pages TRM / B 3.3-20 and TRM / B 3.3-21 05/16/2003 Page TRM / B 3.3-22 10/22/2003 Page TRM / B 3.3-23 05/16/2003 B 3.4 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-3 08/31/1998 Pages TRM / B 3.4-4 and TRM / B 3.4-4a 10/31/2007 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 SUSQUEHANNA -UNIT,2.,.- E:A:TRM-tlOES-6 .......
EFFECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 47 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM / B 3.5-3 and TRM / B 3.5-3a 10/31/2007 Page B 3.5-4 08/31/1998 Page TRM / B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 03/29/2007 Page TRM / B 3.6-5 04/04/2007 Page TRM / B 3.6-6 12/03/2004 Pages TRM / B 3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Pages TRM / B 3.7-3 and TRM / B 3.7-3a 12/27/2007 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/19'99 Pages TRM I B 3.7-6 and TRM / B 3.7-6a 03/31/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/19,99 Page TRM / B 3.7-8 08/02/19'99 Page TRM / B 3.7-9 03/31/2006 Page TRM / B 3.7-10 08/02/19,99 Pages TRM / B 3.7-10a through TRM / B 3.7-1 la 03/31/2006 Pages TRM / B 3.7-12 through TRM /B 3.7-14 08/02/1999 Pages TRM / B 3.7-14a and TRM / B 3.7-14b -.01/09/2004 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Page TRM / B 3.7-21 02/14/2005 Page TRM / B 3.7-21a 06/20/2008 Pages TRM / B 3.7-22 and TRM / B 3.7-23 01/30/2008 Pages TRM / B 3.7-24 through TRM / B 3.7-29 10/05/2006 Page TRM / B 3.7-30 06/07/2007 Pages TRM / B 3.7-30a and TRM / B 3.7-30b 10/05/20,06 Page TRM / B 3.7-31 12/03/20,04 Page TRM / B 3.7-32 03/09/20,01 Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000
". -SUSQUEHANNA - UNIT-2 TRM / LOES-7 EFFECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 47 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.8 ELECTRICAL POWER BASES Page TRM /B 3.8-1 04/02/2002 Pages TRM / B 3.8-2 and TRM / B 3.8-2a 01/28/2005 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 04/0212002 Page TRM / B 3.8-4a 08/10/2004 Page TRM / B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM I B 3.8-16 0410212002 Page TRM / B 3.8-17 01/28/2005 Pages TRM / B 3.8-18 through TRM / B 3.8-24 11/29/2006 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 08/31/1998 Pages B 3.9-3 through B 3.9-7 10/23/1998 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3 03/27/2007 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 Pages TRM I B 3.10-6 and TRM / 3.10-7 04/17/2002 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/31/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B-3.1 1-11 a 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 311-14 12/03/2004 Page TRM / B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/31/1998 Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.11-20a 04/02/2002 Page TRM / B 3.11-21 05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11-23 11/14/2006 Page TRM / B 3.11-23a 05/13/2005 Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 through B 3.11-27 08/31/1998 Pages TRM / B 3.11-28 and TRM / B 3.11-29 11/30/2005 Page TRM / B 3.11-30 12/03/2004 Pages B 3.11-31 through B 3.11-35 08/31/1998 Page TRM / B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 09/19/2007 Pages TRM / B 3.12-2 and TRM / B 3.12-3 02/05/1999 TRM2 text LOES.doc 8/28/08 SUSQUEHANNA - UNIT-2 ...... :.- .TRM1LES-8 - -7 EFFECTIVE DATE 09/04/2008
Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation PPL Rev. 2 3.7.7 3.7 Plant Systems 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation TRO 3.7.7 One channel of Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation shall be OPERABLE.
APPLICABILITY: During operation of the Main Condenser Air Ejector and Offgas Treatment System.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A Main Condenser Offgas A.1 Verify that the Offgas System Immediately Pretreatment Logarithmic is not bypassed Radioactivity Monitor inoperable.
AND A.2. Perform TS SR 3.7.5.1 Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND A.3 Restore Main Condenser 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Offgas Pretreatment Radioactivity Monitor to OPERABLE status B. Main Condenser Offgas B.1 Verify that the Offgas'System Immediately Pretreatment Logarithmic is not bypassed Radioactivity Monitor and AND Turbine Building Vent Monitor Low Range Noble B.2 Perform TS SR 3.7.5.1 Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Gas Channel inoperable AND B.3 Restore Main Condenser Offgas Pretreatment 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Radioactivity Monitor OR Turbine Building Vent Monitor Low Range Noble Gas Channel to OPERABLE status SUSQUEHANNA .-.UNIT2 .TM 34F TRM./ 3.7-41 I EFFECTIVE D DATE /2 E 09/04/2008
Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation PPL Rev. 2 3.7.7 TECHNICAL REQUIREMENT SURVEILLANCE....
SURVEILLANCE FREQUENCY TRS 3.7.7.1 Perform CHANNEL CHECK 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TRS 3.7.7.2 Perform SOURCE CHECK 31 days TRS 3.7.7.3 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.7.7.4 Perform CHANNEL CALIBRATION 24 Months
..suSQUEHANNA-7 UNIT 2 TFW TM 372EF IVD EFFECTIVE DATEE819 08/31/1998