ML061380092
| ML061380092 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 05/18/2006 |
| From: | Olshan L Plant Licensing Branch III-2 |
| To: | Brandi Hamilton Duke Power Co |
| Olshan L N, NRR/DORL, 415-1419 | |
| References | |
| TAC MB8086, TAC MB8087, TAC MB8088 | |
| Download: ML061380092 (3) | |
Text
May 18, 2006 Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672
SUBJECT:
OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 - SAFETY EVALUATION OF DEFENSE-IN-DEPTH AND DIVERSITY (D3) ANALYSIS (TAC NOS.
MB8086, MB8087, AND MB8088)
Dear Mr. Hamilton:
By letter dated March 20, 2003, you provided a D3 analysis for a proposed digital upgrade of the Reactor Protective System and Engineered Safeguards Protective System (RPS/ESPS).
By letter dated May 12, 2006, we sent you our safety evaluation (SE) of your D3 analysis. We have decided to withdraw this SE, and, instead, address this matter in connection with our future SE on the license amendment request for the digital upgrade of the RPS/ESPS.
If you have any questions on this matter, please contact me at 301 415-1419.
Sincerely,
/RA/
Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: See next page
Mr. Bruce H. Hamilton May 18, 2006 Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672
SUBJECT:
OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 - SAFETY EVALUATION OF DEFENSE-IN-DEPTH AND DIVERSITY (D3) ANALYSIS (TAC NOS.
MB8086, MB8087, AND MB8088)
Dear Mr. Hamilton:
By letter dated March 20, 2003, you provided a D3 analysis for a proposed digital upgrade of the Reactor Protective System and Engineered Safeguards Protective System (RPS/ESPS).
By letter dated May 12, 2006, we sent you our safety evaluation (SE) of your D3 analysis. We have decided to withdraw this SE, and, instead, address this matter in connection with our future SE on the license amendment request for the digital upgrade of the RPS/ESPS.
If you have any questions on this matter, please contact me at 301 415-1419.
Sincerely,
/RA/
Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: See next page DISTRIBUTION:
Public RidsRgn2MailCenter RidsNrrDorlDpr LPL2-1 r/f RidsAcrsAcnwMailCenter RidsOgcMailCenter RidsNrrDorlLplc(EMarinos)
RidsNrrPMLOlshan SLee, EDO Region II RidsNrrMOBrien RidsNrrOgcRp ADAMS Accession No. ML061380092 NRC-106 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC OGC NRR/DORL/D NAME LOlshan:sxd6 MOBrien EMarinos JMoore CHaney DATE 5/18/06 5/18/06 5/18/06 5/18/06 5/18/06 OFFICIAL RECORD
Oconee Nuclear Station, Units 1, 2, and 3 cc:
Ms. Lisa F. Vaughn Duke Power Company LLC 526 South Church Street P. O. Box 1006 Mail Code EC07H Charlotte, North Carolina 28201-1006 Manager, LIS NUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035 Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.
Columbia, SC 29201-1708 Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Dr.
Suite 705 Rosslyn, VA 22209 Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Power Company LLC ON03RC 7800 Rochester Highway Seneca, SC 29672 Ms. Karen E. Long Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602 Mr. R. L. Gill, Jr.
Manager - Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC 526 S. Church St.
Mail Stop EC05P Charlotte, NC 28202 Division of Radiation Protection NC Dept of Environment, Health, & Natural Resources 3825 Barrett Dr.
Raleigh, NC 27609-7721 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210 Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006 Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672