Assessment Follow-up - Turkey Point Nuclear Plant, Unit 3 & Unit 4
ML060440035
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/10/2006
From: Casto C
Division Reactor Projects II
To: Stall J
Florida Power & Light Co
References
Download: ML060440035 (4)


Text

February 10, 2006 Florida Power and Light Company ATTN: Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

ASSESSMENT FOLLOW-UP - TURKEY POINT NUCLEAR PLANT, UNIT 3 AND UNIT 4

Dear Mr. Stall:

On December 31, 2005, the NRC completed a quarterly review of the Turkey Point Nuclear Plant. The assessment evaluated the performance indicators (PIs) and inspection results. The purpose of this letter is to inform you of your safety performance and our plans for a future inspection at your facility. This letter supplements, but does not supercede, our mid cycle performance review letter issued on August 30, 2005.

Our review of Turkey Point identified that you have crossed the threshold from Green to White for the Heat Removal System (AFW) Unavailability PI for Units 3 and 4 for the fourth quarter of calendar year (CY) 2005. In a subsequent conversation Mr. Joel Munday of my staff had with Mr. Walter J. Parker of your staff on February 8, 2006, the crossing of the Green threshold was confirmed. As a result, we have assessed Turkey Point Units 3 and 4 performance to be in the Regulatory Response column of the NRCs Action Matrix. Therefore, we plan to conduct Supplemental Inspection Procedure 95001. This inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence.

We recognize that your root cause analysis has not been finalized and other planned activities are already scheduled to preclude conducting an additional inspection at this time. Therefore, we will contact you at a later date to schedule the supplemental inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

FPL 2

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Joel Munday at (404) 562-4560 with any questions you may have regarding this letter.

Sincerely,

/RA/

Charles A. Casto, Director Division of Reactor Projects Docket Nos. 50-250, 50-251 License Nos. DPR-31, DPR-41

FPL 3

cc w/encl:

T. O. Jones Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Walter Parker Licensing Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Michael O. Pearce Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Mark Warner, Vice President Nuclear Operations Support Florida Power & Light Company Electronic Mail Distribution Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company Electronic Mail Distribution M. S. Ross, Managing Attorney Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi, Senior Attorney Florida Power & Light Company Electronic Mail Distribution Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution County Manager Metropolitan Dade County Electronic Mail Distribution Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Curtis Ivy City Manager of Homestead Electronic Mail Distribution Distribution w/encl: (See page 4)

OFFICE RII:DRP RII:DRP SIGNATURE JTM MXM3 NAME JMunday MMaymi DATE 02/09/06 02/09/06 2/ /2006 2/ /2006 2/ /2006 2/ /2006 2/ /2006 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO