R. E. Ginna - Demand for Information: Extension Request
ML053480046
Person / Time
Site: Calvert Cliffs, Nine Mile Point, Ginna  Constellation icon.png
Issue date: 12/12/2005
From: Heffley J
Constellation Energy Group, Constellation Generation Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML053480046 (2)


Text

J. M. Heffley Chief Nuclear Officer Constellation Generation Group 1997 Annapolis Exchange Parkway Suite 310 Annapolis, MD 21401 410-897-5020 Constellation Energya Generation Group December 12, 2005 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:

SUBJECT:

Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Nine Mile Point Nuclear Station Unit Nos. 1 & 2; Docket Nos. 50-220 & 50-4 10 R.E. Ginna Nuclear Power Plant Docket No. 50-244 Demand for Information: Extension Request Under cover of letters from you dated December 2, 2005, we received a "Demand for Information" pertaining to Calvert Cliffs Nuclear Power Plant, Nine Mile Point Nuclear Station, Unit 1, Nine Mile Point Nuclear Station, Unit 2 and R. E. Ginna Nuclear Power Plant. Pursuant to your letter, we are required to file an answer, under oath or affirmation, within thirty-five days; i.e., on or before January 6, 2006.

Developing responses to the Demand for Information will require the collection of information from, and verification by, numerous sources, as well as analyses. This, coupled with the intervening holidays, will make compliance with the schedule extremely difficult. Accordingly, we request an additional two weeks within which to respond; i.e., to January 20, 2006. Grant of the extension of time will not delay the substantive adoption of strategies and, therefore, have no adverse impact on safety. In addition, efforts directed at identifying additional strategies under ongoing Phase 3 activities will not be affected.

I declare under penalty of perjury under the laws of the United States of America that I am authorized by Constellation Generation Group to submit this documentation and that the foregoing is true and correct.

If you have questions regarding this submittal, please contact Mr. Mark Flaherty at (410) 897-5087.

Executed on December 12, 2005 i

I

/.

i i

I Sincerely,

,/Jolsn M. HeffleyIV X

(_ Aief Nuclear Offic& _J soc) '

cc:

P. D. Milano, NRC S. J. Collins, NRC T. G. Colburn, NRC Resident Inspector, NRC (Calvert Cliffs)

Resident Inspector, NRC (Ginna)

Resident Inspector, NRC (Nine Mile Point)

R. I. McLean, Maryland DNR J. P. Spath, NYSERDA