GO2-05-142, Response to Inspection Report 05000397-05-007

From kanterella
(Redirected from ML052350457)
Jump to navigation Jump to search
Response to Inspection Report 05000397-05-007
ML052350457
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/15/2005
From: Oxenford W
Energy Northwest
To:
Document Control Desk, NRC Region 4
References
GO2-05-142, IR-05-007
Download: ML052350457 (1)


Text

A

,ENERGY NORTHWEST People -Vision -Solutions P.O. Box 968

  • Richland, WA
  • 99352-0968 August 15, 2005 G02-05-142 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 RESPONSE TO INSPECTION REPORT 05000397/2005007

Reference:

Letter dated July 14, 2005, MP Shannon (NRC) to JV Parrish (Energy Northwest), "NRC Physical Security Limited Baseline Inspection Report 05000397/2005007"

Dear Sir or Madam:

The purpose of this letter is to provide Energy Northwest's response to the Non-Cited Violation of 10 CFR 73.55(c)(4) documented in the referenced inspection report.

Energy Northwest denies non-cited violation NCV 05000397/2005007-01. Attachment 1 to this letter contains a restatement of the NCV and provides Energy Northwest's response to the NCV.

Should you have any questions or desire additional information regarding this letter, please call GV Cullen at (509) 377-6105.

Respectfully, Vice Pr ident, Technical Services Mail Drop PE04

Attachment:

cc: BS Mallett - NRC RIV Director, Office of Enforcement - NRC BJ Benney - NRC NRR NRC Senior Resident Inspector/988C RN Sherman - BPA1 399 WA Horin -Winston & Strawn