ML051950475

From kanterella
Jump to navigation Jump to search
NRC Final Exam Results Ltr. W/O Encl. Dtd 6/14/05 (Folder 1)
ML051950475
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/14/2005
From: Conte R
Operations Branch I
To: Berry P
Entergy Nuclear Northeast
Conte R
References
Download: ML051950475 (3)


Text

June 14, 2005 Mr. Patrick Berry Manager, Training and Development Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant 268 Lake Road Lycoming, NY 13093

Dear Mr. Berry:

The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on May 20, 2005, and the walk-through (overall) and/or simulator operating tests administered May 16-19, 2005 at your facility. This meets the intent of section E.1 of the Examiner Standards (ES 501) in NUREG 1021. Five individuals were administered the examination and three passed. This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the licenses.

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5183.

Sincerely,

/RA/

Richard J. Conte, Chief Operations Branch Division of Reactor Safety Docket No. 55-333 License No. DPR-59

Mr. Patrick Berry

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/licenses:

T. A. Sullivan, Site Vice President

Mr. Patrick Berry Distribution: w/o enclosures:

Master Exam File DOCUMENT NAME: E:\Filenet\ML051950475.wpd ADAMS PACKAGE: ML042440205 SISP Review Complete: RJC (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler /RA/ SDennis /RA THFish RA by RJConte /RA/

by RJC RJC Acting Acting for/ for/

DATE 06/11/05 06/14/05 06/14/05 06/14/05 OFFICIAL RECORD COPY

Mr. Patrick Berry