MONTHYEARL-24-226, License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 12024-10-31031 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 1 IR 05000440/20240032024-10-30030 October 2024 Integrated Inspection Report 05000440/2024003 and 07200069/2024001 ML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection L-24-179, License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 52024-10-21021 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 5 ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components L-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 ML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24256A0872024-09-11011 September 2024 Fws to NRC, Concurrence with Endangered Species Act Nlaa Determinations for Perry License Renewal ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration ML24250A0412024-09-0606 September 2024 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected ML24166A0172024-09-0606 September 2024 Ltr. to Glenna Wallace, Chief, Eastern Shawnee Tribe of Oklahoma; Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0882024-09-0606 September 2024 Letter to Rickey Armstrong, President_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) ML24249A0762024-09-0606 September 2024 Letter to Douglas Lankford, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0752024-09-0606 September 2024 Letter to Charles Diebold, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0782024-09-0606 September 2024 Ltr. to Kenneth Meshigaud, Chairperson, _ Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0862024-09-0606 September 2024 Letter to Regina Gasco-Bentley, Chairperson_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections ML24228A1712024-09-0303 September 2024 Ltr to Brian Dickens, EPA-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24228A1702024-09-0303 September 2024 Ltr to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24240A1482024-08-27027 August 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A7782024-08-26026 August 2024 Aging Management Audit - Perry Unit 1 - License Renewal Application August 26 2024 L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-178, License Renewal Application Revision O - Supplement 42024-08-0808 August 2024 License Renewal Application Revision O - Supplement 4 IR 05000440/20240022024-08-0808 August 2024 Integrated Inspection Report 05000440/2024002 L-24-189, License Renewal Application for Revision O - Supplement 12024-08-0707 August 2024 License Renewal Application for Revision O - Supplement 1 IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 L-24-171, Spent Fuel Storage Cask Registration2024-07-30030 July 2024 Spent Fuel Storage Cask Registration ML24150A2022024-07-25025 July 2024 Letter to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-License Renewal Scoping Summary Rpt ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-108, License Renewal Application, Revision 0 - Supplement 32024-07-24024 July 2024 License Renewal Application, Revision 0 - Supplement 3 05000440/LER-2024-003, Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage2024-07-15015 July 2024 Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report IR 05000440/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000440/2024401 2024-09-09
[Table view] |
Text
April 21, 2005 EA-01-082 EA-04-172 Mr. Dan Daniels, President Williams Power Corporation Williams Speciality Services 2076 West Park Place Stone Mountain, Georgia 30087
SUBJECT:
POST INVESTIGATION ALTERNATIVE DISPUTE RESOLUTION
Dear Mr. Daniels:
This refers to the investigation conducted by the U.S. Nuclear Regulatory Commission (NRC)
Office of Investigations (OI) into alleged employment discrimination, during March 2000, by the Williams Power Corporation (Williams Power) at FirstEnergy Nuclear Operating Companys (FENOC) Perry and Davis-Besse Nuclear Power Plants. A predecisional enforcement conference (PEC) was held with FENOC and Williams Power at the NRC Region III office on September 26, 2001. Subsequent to the PEC, a supplemental investigation was conducted by OI (Report No. 3-2000-025S) and an apparent violation concerning the completeness and accuracy of information was identified during that investigation.
On February 24, 2005, the NRC staff issued a Notice of Violation (Notice) to FENOC and Williams Power. In our letter and Notice to you, we described violations of 10 CFR 50.7, Employee protection, and 10 CFR 50.5(a)(2), Deliberate misconduct. In the letter, the NRC informed you that we offered FENOC an opportunity to pursue resolution of the 10 CFR 50.7 violation with alternative dispute resolution (ADR). If FENOC had elected to do so, the NRC would have offered Williams Power an opportunity to participate. FENOC did not elect to enter into ADR, and on March 28, 2005, FENOC admitted to the 10 CFR 50.7 violation and agreed to the imposition of the civil penalty.
In a letter dated March 25, 2005, Williams Power disputed the violations cited against the company. On April 15, 2005, Mr. Charles Whitney, counsel on behalf of Williams Power, requested that Williams Power be given an opportunity to enter into ADR with the NRC in an effort to resolve these concerns. The NRC accepted Williams Power request to enter into ADR in an attempt to resolve the apparent violations cited against them.
Alternative dispute resolution is a general term encompassing various techniques for resolving conflict outside of court using a neutral third party. The technique that the NRC has decided to employ during a pilot program which is now in effect is mediation. Additional information concerning the NRC's pilot program is described in the enclosed brochure (NUREG/BR-0317) and can be obtained at http://www.nrc.gov/what-we-do/regulatory/enforcement/adr.html. The
D. Daniels Institute on Conflict Resolution (ICR) at Cornell University has agreed to facilitate the NRCs program as an intake neutral. Please contact the ICR at (607) 255-1124 within 10 days of the date of this letter if you are interested in pursing resolution of this issue through ADR.
Questions concerning this letter should be addressed to Mr. Russell Arrighi, Senior Enforcement Specialist, Office of Enforcement, at 301-415-3936 or via e-mail at rja1@nrc.gov.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosures, and your response (if you choose to provide one) will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction. The NRC also includes significant enforcement actions on its Web site at www.nrc.gov; select What We Do, Enforcement, then Significant Enforcement Actions.
Sincerely,
/RA/
Frank J. Congel, Director Office of Enforcement Dockets No.: 50-346; 50-440 Licenses No.: NPF-3; NPF-58 cc:
L. Myers, Chief Nuclear Operating Officer - FENOC R. Anderson, Vice President - Nuclear, Perry M. Bezilla, Vice President-Nuclear, Davis-Besse M. OReilly, Attorney, First Energy
D. Daniels Institute on Conflict Resolution (ICR) at Cornell University has agreed to facilitate the NRCs program as an intake neutral. Please contact the ICR at (607) 255-1124 within 10 days of the date of this letter if you are interested in pursing resolution of this issue through ADR.
Questions concerning this letter should be addressed to Mr. Russell Arrighi, Senior Enforcement Specialist, Office of Enforcement, at 301-415-3936 or via e-mail at rja1@nrc.gov.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosures, and your response (if you choose to provide one) will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction. The NRC also includes significant enforcement actions on its Web site at www.nrc.gov; select What We Do, Enforcement, then Significant Enforcement Actions.
Sincerely,
/RA/
Frank J. Congel, Director Office of Enforcement Dockets No.: 50-346; 50-440 Licenses No.: NPF-3; NPF-58 cc:
L. Myers, Chief Nuclear Operating Officer - FENOC R. Anderson, Vice President - Nuclear, Perry M. Bezilla, Vice President-Nuclear, Davis-Besse M. OReilly, Attorney, First Energy DISTRIBUTION:
ADAMS (PARS)
E. Merschoff, DEDR F. Congel, OE J. Caldwell, RIII J. Moore, OGC G. Longo, OGC R. Arrighi, OE N. Hilton, OE S. Gagner, OPA J. Strasma, RIII:PA K. OBrien, RIII C. Weil, RIII OEMAIL OE r/f DOCUMENT NAME: E:\Filenet\ML051120231.wpd ML051120231 G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive OFFICE ES:OE D:OE NAME RArrighi FCongel DATE 04/21/05 04/21/05 OFFICIAL RECORD COPY