4 11%I s m
I pp% a 11'.. TM Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone@pplweb.com November 12, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005835 The October 2004 Monthly Operating Reports for Susquehanna SES Units I and 2 are attached.
Very truly yours, Robert A accone JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. A. Blamey NRC Project Manager, Mr. R V. Guzman
/g) q
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 11/1212004 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susnuehanna Steam Electric Station (Ul)
- 2.
Reporting Period:
October 2004
- 3.
Design Electrical Rating (Net MWe):
1177*
- 4.
Maximum Dependable Capacity (Net MWe):
1135*
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
This Month 745 745 745 0
862,554 Yr.-to-Date 7320.0 6039.2 5989.4 0
6,542,794 Cumulative 187,609 156,524.0 154,229.0 0
159,156,232 NOTES:
- Design Electrical Rating (DER) and Maximum Dependable Capacity (MDC) has been changed starting with the May reporting period due to turbine modifications that were completed in April.
Page 1 of I
I UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 11/12/2004 J. J. Hennings (570) 542-3747 REPORT MONTH October 2004 No.
Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No shutdowns this month Summary: There were no power changes greater than 20% this month.
1.
F. Forced S. Scheduled 2.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction 3.
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Page 1 of 1
SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Completed by:
J. J. Hennings Challenges to Main Steam Safety Relief Valves None.
Date:
11/12/04 Telephone:
(570) 542-3747
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 11/12/04 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 5.
Unit Name:
Susouehanna Steam Electric Station (U2)
- 6. Reporting Period:
October 2004
- 7.
Design Electrical Rating (Net MWe):
1182
- 8.
Maximum Dependable Capacity (Net MWe):
1140
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
NOTES:
This Month 745 745 745 0
836,786 Yr.-to-Date 7,320 7,320 7,320 0
8,362,523 Cumulative 172,849 151,215.8 149,228.6 0
157,120,534 Page 1 of 1
UNIT SHUTDOWNS
.NN 4
IilC 5iP
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 11/12104 J. J. Hennings (570) 542-3747 REPORT MONTH October 2004 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting to Prevent Recurrence Down Reactor I
s 3
No shutdowns this month.
Summary: Power reductions greater than 20% this month. 1) A Control Rod Sequence Exchange was performed at 65% power on 10/22/04. 100% power was achieved on 10125/04. 2) A reduction to 67% power was performed to repair feedwater heater condensate piping supports (identified one-week earlier). 100% power was achieved on 10/31/04.
1.
2.
3.
F. Forced S. Scheduled Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Page I of 1
SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Date:
11/12/2004 Completed by: J. J. Hennings Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.