October 2004 Monthly Operating Reports for Susquehanna Ses Units 1 and 2
ML043310001
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/12/2004
From: Saccone R
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-005835
Download: ML043310001 (7)


Text

%'

4 11%I s m

I pp% a 11'.. TM Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone@pplweb.com November 12, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005835 The October 2004 Monthly Operating Reports for Susquehanna SES Units I and 2 are attached.

Very truly yours, Robert A accone JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. A. Blamey NRC Project Manager, Mr. R V. Guzman

/g) q

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 11/1212004 J. J. Hennings (570) 542-3747 OPERATING STATUS

1. Unit Name:

Susnuehanna Steam Electric Station (Ul)

2.

Reporting Period:

October 2004

3.

Design Electrical Rating (Net MWe):

1177*

4.

Maximum Dependable Capacity (Net MWe):

1135*

5.

Hours in Reporting Period

6.

Number of Hours Reactor Was Critical

7.

Hours Generator On-Line

8.

Unit Reserve Shutdown Hours

9.

Net Electrical Energy Generated (MWH)

This Month 745 745 745 0

862,554 Yr.-to-Date 7320.0 6039.2 5989.4 0

6,542,794 Cumulative 187,609 156,524.0 154,229.0 0

159,156,232 NOTES:

  • Design Electrical Rating (DER) and Maximum Dependable Capacity (MDC) has been changed starting with the May reporting period due to turbine modifications that were completed in April.

Page 1 of I

I UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 11/12/2004 J. J. Hennings (570) 542-3747 REPORT MONTH October 2004 No.

Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No shutdowns this month Summary: There were no power changes greater than 20% this month.

1.

F. Forced S. Scheduled 2.

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction 3.

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page 1 of 1

SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:

50-387 Completed by:

J. J. Hennings Challenges to Main Steam Safety Relief Valves None.

Date:

11/12/04 Telephone:

(570) 542-3747

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 11/12/04 J. J. Hennings (570) 542-3747 OPERATING STATUS

5.

Unit Name:

Susouehanna Steam Electric Station (U2)

6. Reporting Period:

October 2004

7.

Design Electrical Rating (Net MWe):

1182

8.

Maximum Dependable Capacity (Net MWe):

1140

5.

Hours in Reporting Period

6.

Number of Hours Reactor Was Critical

7.

Hours Generator On-Line

8.

Unit Reserve Shutdown Hours

9.

Net Electrical Energy Generated (MWH)

NOTES:

This Month 745 745 745 0

836,786 Yr.-to-Date 7,320 7,320 7,320 0

8,362,523 Cumulative 172,849 151,215.8 149,228.6 0

157,120,534 Page 1 of 1

UNIT SHUTDOWNS

.NN 4

IilC 5iP

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 11/12104 J. J. Hennings (570) 542-3747 REPORT MONTH October 2004 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting to Prevent Recurrence Down Reactor I

s 3

No shutdowns this month.

Summary: Power reductions greater than 20% this month. 1) A Control Rod Sequence Exchange was performed at 65% power on 10/22/04. 100% power was achieved on 10125/04. 2) A reduction to 67% power was performed to repair feedwater heater condensate piping supports (identified one-week earlier). 100% power was achieved on 10/31/04.

1.

2.

3.

F. Forced S. Scheduled Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:

I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page I of 1

SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:

50-388 Date:

11/12/2004 Completed by: J. J. Hennings Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.