FENOC zt Z V-,s 1-
-1V"70I y Perry Nuclear Power Plant 10 Center Road Perry, Ohio 44081 Lew Myers VP, Nuclear and Chief Operating Officer, FENOC 440-280-5646 Fax: 440-280-5681 September 10, 2004 PY-CEI/OEPA-0423L Ohio Environmental Protection Agency Division of Water Pollution Control Enforcement Section, ES/MOR P.O. Box 1049 Colhiibifs,;OhioA43216-1049 Ladies and Gentlemen:
Enclosed are the NPDES monthly report forms for the month of August 2004. No violations occurred during this period.
If you have questions or require additional information, please contact Mr. Phil Lashley at (440) 280-5145.
Sincerely, Enclosures cc: NRC Region III NRC Resident Inspector NRC Project Manager V'NRC Document Control Desk (Docket No. 50-440)
I 5
L Ri MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Station Code:
Reported Date (Month Year):
Application:
91412004 PerryNuclearPowerPlant 004 August 2004 3IB00016*GD Perry Nuclear Power Plant 10 Center Rd.
Samping station Descrption PerryOH44081 Point Representative of Discharge in(1) - Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab:
Analyst:
in(2) - Enter frequency of sampling CCB125 Phil Lashley (1
3 3
333______
1 (2) 1 1
1 99911 1
999 l
(50060)
(00400)
(01119)
(00011)
(34044)
(50050)
(78739)
Chlorine, Total pH Copper, Total Water Temperature Oxidants, Total Flow Rate orination/Brominat Residual S.U.
Recoverable F
Residual MGD Duration Day mg/l ug/l mg/l Minutes 01 AA 79 118.7 90 02 AA 11.8 81 106.6 90 03 AA 8.51 79 95.8 106 04 AA 81 116 90 05 0.04 79 106.8 95 06 0.05 8.01 78
-11 6.1-D 07 0.04 X T
_X 78 115.5 90 08 AA_77 114.9 90 09 0.14 78 115.6 51 10 AA 8.56 79 82.5 0
11 AA 76 82.7 0
12 AA 75 83.4 45 13 AA 8.47 75 87.4 120 14 AA 75 87.1 75 15 AA 75 87.4 60 16 AA 75 97 80 17 AA 8.38 77 119.5 85 18 0.04 77 117.5 90 19 0.08 77 118.6 50 20 AA 8.46 78 119.2 90 21 0.08 77 120.3 45 22 0.04 77 119.7 45 23 AA 78 117.5 90 24 AA 8.68 78 117.9 92 25 AA 79 118.9 90 26 0.04 80 118.6 90 27 AA 8.73 79 114.7 45 28 AA-l-I 79 -
- -116.8
-. 45 --
29 0.04 79 118.2 90 30 0.04 9_
_ 7 119.6 90 31 AA 8.67 j
78 116.1 90 TOTAL 0.63 76.47 11.8 2412 3386.6 2299 AVG 0.0203 N/A 11.8 77.8065 109.2452 74.1613 MAX 0.14 8.73 11.8 e7.80 120.3 120 MIN 0
8.01 11.8 75 0
82.5 0
I certify under the penalty of law that I have personally examined and am famliar with the Information submitted and based on my Inquiry of those Individuals Immediately responsible for obtaining the Information. I believe the submitted Information Is true, accurate and complete. l am aware that there are significant penalties for submitting false Information, Including the possibilty of fine and ImprisonmenL Date Report Completed:
Signature of Reporter:
Title of Reporter:
09/03/2004 A
VP, Nuclear & COO, FENOC Form No EPA 4500 (8-91)
(Generated by SWIMS)
Formerly EPA SURI Page 1 of I
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Station Code:
Reported Date (Month Year):
Application 91412004 PerryNudearPowerPlant 004 August 2004 3IB00016*GD Perry Nuclear Power Plant 10 Center Rd.
Sampling Station
Description:
Perry OH 44081 Point Representative of Discharge Reporting Code Result Date Additional Remarks Mdl 50060 08/01/2004 1Less than MDL.
.04 50060 08/02/2004 tLess than MDL.
.04 50060 08/03/2004 Less than MDL.
.04 50060 08/04/2004 Less than MDL.
.04 50060 08/05/2004
.04 50060 08/06/2004
.04 50060 08/07/2004
.04 50060 08/08/2004 Less than MDL.
.04 50060 08/09/2004
.04 50060 08/10/2004 Less than MDL.
.04 50060 08/11/2004 Less than MDL.
.04 50060 08/12/2004 Less than MDL.
.04 50060 08/13/2004 Less than MDL.
.04 50060 08/14/2004 Less than MDL.
.04 50060 08/15/2004 ess than MDL.
.04 50060 08/16/2004 Less than MDL.
.04 50060 08/17/2004 Less than MDL.
.04 50060 08/18/2004
.04 50060 08/19/2004
.04 50060 08/20/2004 Less than MDL.
.04 50060 08/21/2004
.04 50060 08/22/2004
.04 50060 08/23/2004 Less than MDL.
.04 50060 08/24/2004 Less than MDL.
.04 50060 08/25/2004 Less than MDL.
.04 50060 08/26/2004
.04-50060 08/27/2004 Less than MDL.
.04 50060 08/28/2004 Less than MDL.
.04 50060 08/29/2004
.04 50060 08/30/2004
.04 50060 08/31/2004 Less than MDL.
.04
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Station Code:
Reported Date (Month Year):
Application:
9/4/2004 PerryNuclearPowerPlant 601 August 2004 3IB00016*GD Perry Nuclear Power Plant Sampling Station
Description:
10 Center Rd.
Smln tto ecito PerryOH44081 Discharge from Regenerate Neutralization Pits in(1) - Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab:
Analyst:
in(2) -Enter frequency of sampling CCB125 P. Lashley (2) 1 3
999 (00400)
(00530)
(00550)
(50050) I pH Total Suspended Oil and Grease, Flow Rate S.U.
Solids Total MGD Day Mg/l Mg/l 01 AH 02 AH l
03 AH 04 AH 05 6.68 AA AA 0.019 06 AH 07 AMH_
08 AHl 09 8.11 9
AA 0.019 10 AH 11 iAH 12 AH 13 7.58 0.019 l
14 AH 15 AH 16 AH 17 AH 18 8.43 8
AA 0
19 AH 20 AH 21 AHM 22 7.9 0.016 23 AH 24 AH 25 AH 26 AH 27 l
l AH ll 7.76
- -AA--
-AA 0.017_
29 AH 30 j
AH l
l 31 8.32 8
AA r
0.019 TOTAL 54.78 25 0
f 0.109 0
0 0
l AVG N/A 5
0 0.0156 l _
MAX 8.43 9
0 0.019
____EI MIN 6.68 0
0 0
0 0
0 I certify under the penalty of law that I have personally examined and am familiar with the Information submitted and based on my kiquiry of those Individuals Immediately responsible for obtaining the Information, I believe the submitted Information Is true, accurate and complete. I am aware that there are significant penalties for submitting false Information, Including the possibility of fine and Imprisonment Date Report Completed:
Signature of Reporter:
Title of Reporter:
09/04/2004 G
VP, Nuclear & COO, FENOC Form No EPA 4500 (8-91)
(Generated by SWIMS)
Formerly EPA SURI Page 1 of I
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Station Code:
Reported Date (Month Year):
Application:
9/4/2004 Perry Nuclear Power Plant 601 August 2004 31B00016*GD Perry Nuclear Power Plant 10 Center Rd.
Sampling Station
Description:
Perry OH44081 Discharge from Regenerate Neutralization Pits jReporting Code Result Date Additional Remarks Mdl 00530 08/05/2004 jLess than MDL.
4.
00530 08/28/2004 ess than MDL.
4.
00550 08/05/2004 Less than MDL.
5.
00550 08/09/2004 Less than MDL.
S.
00550 08/18/2004 Less than MDL.
5.
00550 08/28/2004 Less than MDL.
5.
00550 08/31/2004 Less than MDL.
5.
50050 08/01/2004 o discharge performed this date.
50050 08/02/2004 o discharge performed this date.
50050 08/03/2004 lo discharge performed this date.
50050 08/04/2004 lo discharge performed this date.
50050 08/06/2004 lo discharge performed this date.
50050 08/07/2004 No discharge performed this date.
50050 08/06/2004 No discharge performed this date.
50050 08/10/2004 No discharge performed this date.
50050 08/11/2004 No discharge performed this date.
50050 08/12/2004 No discharge performed this date.
50050 08/14/2004 j1o discharge performed this date.
50050 08/15/2004 Po discharge performed this date.
50050 08/16/2004 No discharge performed this date.
50050 08/17/2004 No discharge performed this date.
50050 08/18/2004 50050 08/19/2004 No discharge performed this date.
50050 08/20/2004 No discharge performed this date.
50050 08/21/2004 No discharge performed this date.
-50050 08/23/2004-,}o-discharge-performed this date.-
50050 08/24/2004 So discharge performed this date.
50050 08/25/2004 o discharge performed this date.
50050 08/26/2004 o discharge performed this date.
50050 08/27/2004 No discharge performed this date.
50050 08/29/2004 lo discharge performed this date.
50050 08/30/2004 No discharge performed this date.
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Station Code:
Reported Date (Month Year):
Application:
914/2004 Perry Nuclear Power Plant 602 August 2004 3IB00016*GD Perry Nudear Power Plant Sampling Station
Description:
PerryOH44081 Discharge from Chemical Cleaning Lagoon in(1) - Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab:
Analyst:
in(2) - Enter frequency of sampling CCB125 P. Lashley (1
2 2
3 2
3 1
(2) 998 998 1
998 1
999 (00980)
(01119) 1 00400)
(00530)
(00550)
(50050)
Iron, Total Copper, Total pH Total Suspended Oil and Grease, Flow Rate Recoverable Recoverable S.U.
Solids Total MGD Day ug/l ug/l mg/i mg/i 01 AL 02
[
13 04
- i.
06-
,X X.X 15
___1 E
t E
__I 1
1 17 22 24 26 29-l l
TOTAL 0
i IAVG 0
o N/A I_ MA 0~
_I I certify under the penalty of law thatlI have personally examined and am familiar with the Information submitted and based on my Inquiry of those individuals Imnmediately responsible for obtaining the Informaiaon, I believe the submitted Information Is true, accurate and complete. l am aware that there are significant penali~es for submitting false Informaiaon, including the possibility of fine and Imprisonment Date Report Completed:
Signature of Reporter:
Title of Reporter:
09/04/2004 o
>/VP, Nuclear & COO, FENOC 17V Form No EPA 4500 (8-91)
(Generated by SWIMS)
Formerly EPA SURI Page 1 of I
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Station Code:
Reported Date (Month Year):
Application:
9/412004 PerryNuclearPowerPlant 602 August 2004 3IB00016*GD Perry Nuclear Power Plant 10 Center Rd.
Sampling Station
Description:
Perry OH 44081 Discharge from Chemical Cleaning Lagoon Ieporting Code Result Date Additional Remarks IMdI l
00980 08/01/2004 ro discharge performed this month.
I-
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Station Code:
Reported Date (Month Year):
Application:
9/412004 Perry NuclearPower Plant 800 August 2004 3IB00016*GD Perry Nuclear Power Plant 10 Center Rd.
Samping Station Descrpton:
PerryOH44081 Intake Water from Lake Erie lin(1) - Enter I for Continuous, 2 for Composite. 3 for Grab Sample ReportingLab:
Analyst:
lin(2) - Enter frequency of sampling CCB125 P. Lashley (2,
1 999 (01119)
(00011)
Copper, Total Water Temperature Recoverable IF Day ug/1
___71 02 4.1 7T 03_
_72 04
_74
=_
- 1D
__==__
05 72 06 70 07 70 09 70_
10 71 11 71 12 71
+/-
13 71 14 71 15 71 16 71 17 70 18 70 19 70 20 70 21 70 22 70 23 70 24 70 25 71 26
_ J 71_
27 71 28 72 29 7
30 7
31 7
ITOTALI 4.1 2200 0
0 0
0 IAVG 4.1 70.9677 M IN I 4 170 0
0 I certify under the penalty of law that I have personally examined and am familiar with the Information submitted and based on my Inquiry of those Individuals Immediately responsible for obtaining the Information. I beteve the submitted Information Is true, accurate and complete. l am aware that there are significant penalties for submitting false Information. Including the possibility of fine and Imprisonment Date Report Completed:
S'gna ure of Reporter:
Title of Reporter:
09/04/2004
-j)
()
V1.,
VP, Nuclear & COO, FENOC Form No EPA 4500 (8-91)
(Generated by SWIMS)
Formerly EPA SURI Page 1 of I
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Perry Nuclear Power Plant Perry Nuclear Power Plant 10 Center Rd.
Perry OH 44081 Station Code:
800 Reported Date (Month Year):
August 2004 Application:
3IB00016*GD 91412004 Sampling Station
Description:
Intake Water from Lake Erie