Ad Nuclear Operating Company
£v1h kuAzn aQrjeaOtbJ Qmyer Fl2 &2J9 Hot~ 7Z85 X/3 August 12,2004 NOC-AE-04001772 File No.: G02 10CFR50.71 STI: 31776278 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for July 2004 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for July 2004.
If you should have any questions on this matter, please contact R.L. Hill at (361) 972-7667.
FH. Mallen General Manager, Financial Support Attachments: 1)
STPEGS Unit 1 Monthly Operating Report - July 2004
- 2)
STPEGS Unit 2 Monthly Operating Report - July 2004
\\/I n
cc:
(paper copy)
(electronic copy)
Bruce S. Mallett Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Jeffrey Cruz U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MNI16 Wadsworth, TX 77483 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP L. D. Blaylock City Public Service Michael K. Webb U. S. Nuclear Regulatory Commission R. L. Balcom Texas Genco, LP A. Ramirez City of Austin C. A. Johnson AEP Texas Central Company Jon C. Wood Matthews & Branscomb C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT I MONTHLY OPERATING REPORT JULY 2004 ST? NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50498 LICENSE NO. NPF-76 Approved By:
/
jE a/&(
Gf.f.ARKEY Datt
MONTHLY
SUMMARY
South Texas Project Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.
OPERATING DATA REPORT DOCKET NO.
50-498 UNIT I
DATE Auz. 3. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 OPERATING STATUS
- 1.
REPORTING PERIOD: 7/1/04 - 7/31/04 GROSS HOURS IN REPORTING PERIOD:
744
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6
- 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
- 4.
REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
- 5.
NUMBER OF HOURS REACTOR CRITICAL
- 6.
REACTOR RESERVE SHUTDOWN HOURS
- 7.
HOURS GENERATOR ON LINE
- 8.
UNIT RESERVE SHUTDOWN HOURS
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)
- 10.
NET ELECTRICAL ENERGY GENERATED (MWH)
- 11.
REACTOR SERVICE FACTOR (%/)
- 12.
REACTOR AVAILABILITY FACTOR (%)
- 13.
UNIT SERVICE FACTOR (%)
- 14.
UNIT AVAILABILITY FACTOR (%)
- 15.
UNIT CAPACITY FACTOR - Using MDC (%)
- 16.
UNIT CAPACITY FACTOR - Using DER (%s)
- 17.
UNIT FORCED OUTAGE RATE (%)
744.0 0
744.0 0
2.879.456 945.803 100.0 100.0 100.0 100.0 101.7 101.7 0.0 5.055.9 0
5,03908 19.463,221 6.440.103 98.9 98.9 98.6 98.6 100.8 100.8 1.4 109.071.4 0
107.367.3 0
402.430.678 131.514.940 78.1 78.1 76.9 76.9 75.3 75.3 14.2 18.
19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
AVERAGE DAILY UNIT POWVER LEVEL DOCKET NO.
50-498 UNIT I
DATE Aug. 3. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 MONTH JULY DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY 1
2 3
4 5
6 7
8 9
10 1277 1276 1275 1274 1274 1273 1273 1272 1273 1274 1274 1273 1271 1270 1269 1268 17 18 19 20 21 22 23 24 25 26 AVERAGE DAILY POWER LEVEL (MWe-Net) 1268 1270 1271 1270 1270 1270 1270 1270 1268 1268 1270 1269 1270 1270 1269 11 12 13 14 15 16 27 28 29 30 31
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-498 UNIT I
DATE Aug. 3. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 REPORT MONTH JULY 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)
Shutting Event Code Code Down Report #
Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD l
l l
l lI I
F: Forced S: Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4
PORVS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves challenged during the reporting period.
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT JULY 2004 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Approved By:
AK!' /
1 C
G.L. PARKEY Da
MONTHLY
SUMMARY
South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.
OPERATING DATA REPORT DOCKETNO.
50-499 UNIT 2
DATE Aug. 3. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 OPERATING STATUS
- 1.
REPORTING PERIOD: 7/1/04 - 7/31104 GROSS HOURS IN REPORTING PERIOD:
744
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1,250.6
- 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
- 4.
REASONS FOR RESTRICTION (IF ANY): N/A 5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
NUMBER OF HOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)
NET ELECTRICAL ENERGY GENERATED (MWH)
REACTOR SERVICE FACTOR (%)
REACTOR AVAILABILITY FACTOR (%)
UNIT SERVICE FACTOR (%)
UNIT AVAILABILITY FACTOR (%)
UNIT CAPACITY FACTOR - Using MDC (%)
UNIT CAPACITY FACTOR - Using DER (%)
UNIT FORCED OUTAGE RATE (%)
THIS MONTH 744.0 0
744.0 0
2,879.456 942.232 100.0 100.0 100.0 100.0 101.3 101.3 0.0 YR TO DATE 4.465.9 0
4.448.5 0
17.095,240 5.619.580 87.4 87.4 87.0 87.0 87.9 87.9 0.9 CUMULATIVE 1061.70.4 0
103.854.0 388.783.345 126.717.757 80.1 80.1 78.4 78.4 76.5 76.5 13.4 18.
19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
AVERAGE DAILY UNIT POWER LEVEL DOCKETNO.
50-499 UNIT 2
DATE Aum. 3. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 MONTH JULY DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 1272 2
1272 3
1270 4
1270 5
1269 6
1269 7
1268 8
1267 9
1269 10 1270 11 1270 12 1269 13 1265 14 1263 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 1264 18 1266 19 1266 20 1266 21 1267 22 1266 23 1265 24 1264 25 1263 26 1263 27 1265 28 1265 29 1265 30 1265 15 16 1263 1263 31 1263
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50499 UNIT 2
DATE Aug. 3. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 REPORT MONTH JULY 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)
Shutting Event Code Code Down Report #
Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD l
l l
lI 1
F: Forced S: Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4
PORVS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves challenged during the reporting period.