FENOC Perry Nuclear Power Plant FENOC10 Center Road PO. Box 97 FirstEnergy Nuclear Operating Company Perry, Ohio 44081 July 9, 2004 PY-CEI/NRR-2816L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the June 2004 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
OPERATING DATA REPORT UNIT:
Perry DATE:
7/7/04
- 1.
Docket:
50-440
- 2.
Unit Name:
Perry Nuclear Power Piant
- 3.
Reporting Period June 2004
- 4.
Utility
Contact:
T.
Phelos
- 5.
Telephone:
440-280-7660
- 6.
Design Electrical Rating (Net MWe):
- 7.
Maximum Dependable Capacity (Net MWe):
1260 1235
-This Month Yr-to-Date
- 8.
Hours Reactor was Critical 638.0 4,064.7
- 9.
Hours Generator On-Line 618.7 4,034.4
- 10.
Unit Reserve Shutdown Hours 0.0 0.0
- 11.
Net Electrical Energy (MWeH) 694.868. 0 4.916.613.0 mulative -
__-C 116,309.4 0.0
.045.025.0 Page 1
-I IIUNIT SHUTDOWNS t
REPORT MONTH - JUNE 2004 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 717104 CONTACT: T. PhelDs TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1
Hours j2 3
04-01 5/22/04 F
332.65 IA 4
On 5121/04, One of the Emergency Service Water Pumps failed. The plant commenced reactor shutdown at 16:00 on 5/21/04. The unit was taken off line at 08:42 on 5/22/04. The plant remained off line until 6/5/04 at 05:21 when the generator was synchronized to the grid.
SUMMARY
- The Peny Nuclear Power synchronized to the grid at 0521 on 6/5/04. 100% power was achieved on 6/12/04 at 1847. The unit remained on line through month's end.
- 1. TYPE:
F: Forced S: Scheduled
- 2. REASON:
A - Equipment Failure (explain)
B - Maintenance or Tbst C - Refueling D - Regulatory E - Operating Training &
License Examination F - Administrative I
G - Operational Error (explain)
H - Other (explain) !
- 3. METHOD:
1-Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2 1