ML041110923
| ML041110923 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 04/13/2004 |
| From: | Jefferson W Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, L-2004-087 | |
| Download: ML041110923 (3) | |
Text
0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 April 13, 2004 L-2004-087 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the March 2004 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns for St. Lucie Units 1 and 2.
Please contact us should there be any questions regarding this information.
Vice Pke6dent St. Lucie Plant WJ!KWF Attachment
- ~92A an FPL Group company
L-2004-087 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-335 St. Lucie 1 April 07, 2004 K. R. Boller (772) 467-7465 REPORTING PERIOD:
March 2004
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 830.00 839.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month 497.05 497.05 0.00 413,013.00 Yr-to-Date 1,937.05 1,937.05 0.00 1,648,262.00 Cumulative 195,481.05 193,647.35 0.00 158,749,209.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments 1
03/21/2004 S
246.95 C
1 Start of the SL1-19 refueling outage
SUMMARY
- St. Lucie Unit 1 began the reporting period in operation and remained so until March 21, 2004, when the unit was removed from service to begin a scheduled refueling outage. In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the Power Operated Relief Valves (PORV) or the safety valves during the report period.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
L-2004-087 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO.
50 UNIT NAME St DATE Ap COMPLETED BY K.
TELEPHONE (77 REPORTING PERIOD:
-389
- t. Lucie 2 1ril 07, 2004 R. Boller
- 72) 467-7465 March 2004
- 1. Design Electrical Rating
- 2. Maximum Dependable Capacity (MWe-Net) 830.00 839.00
- 3. Number of Hours the Reactor was Critical
- 4. Number of Hours Generator On-line
- 5. Reserve Shutdown Hours
- 6. Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00 0.00 634,565.00 Yr-to-Date 2,184.00 2,184.00 0.00 1,850,3511.00 Cumulative 158,220.57 156,306.47 0.00 128,897,327.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- St. Lucie Unit 2 operated at essentially full power for the entire month. In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the Power Operated Relief Valves (PORV) or the safety valves during the report period.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)