August 2003 Monthly Operating Report for Calvert Cliffs Units 1 and 2
ML032671034
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/15/2003
From: Nietmann K
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML032671034 (8)


Text

Kevin J. Nietmann Plant General Manager Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 410 495-4787 Fax Constellation I_

Energy Group September 15, 2003 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

SUBJECT:

Document Control Desk Calvert Cliffs Nuclear Power Plant UnitNos. 1 & 2; DocketNos. 50-317 & 50-318 August 2003 Operating Data Reports The subject reports are being sent to you as required by Technical Specification 5.6.4.

Should you have questions, please contact Mr. Thomas S. O'Meara at (410) 495-6940.

Very truly yours, KJN/CAN/bjd Attachments cc:

J. Petro, Esquire J. E. Silberg, Esquire Director, Project Directorate I-1, NRC G. S. Vissing, NRC H. J. Miller, NRC Resident Inspector, NRC R. I. McLean, DNR J. Wright, INPO K. N. Larson, ANI

, 6 

I

Document Control Desk September 15, 2003 Page 2 bce:

C. H. Cruse J. B. Hosmer P. S. Furio D. L. McCready (AIT No. CT199900018, Milestone 33)

B. S. Montgomery R. B. Sydnor G. S. Pavis G. Vanderheyden K. J. Nietmann D. R. Bauder M. A. Geckle D. A. Holm J. A. Sickle OSSRC Secretary B. Booth E. P. Gwiazdowski A. M. Walters C. A. Neyman H. 0. Olsen File 02.05.04 Electronic Docket File NRC 03-092 COMMITMENTS IDENTIFIED IN THIS CORRESPONDENCE:

Submit monthly operating report to the NRC; create a new milestone for the next month.

Responsible Person/Organization:

Neyman, CA / CCRM Due Date:

10/15/03 CT No.:

CT199900018, Milestone 34 Posting Requirements for Responses - NOV/Order No

OPERATING DATA REPORT Docket No. 50-317 Calvert Cliffs Unit 1 September 5, 2003 Prepared by Herman 0. Olsen Telephone:(410)495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)

MAXIMUM DEPENDABLE CAP'Y (NET MWe)

AUGUST 2003 845 825 Year-to-Date Cumulative to Date This month 1.

2.

3.

4.

NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED(MWH) 744.0 744.0 0.0 624,440 5,831.0 5,831.0 0.0 5,021,770 189,120.4 185,956.7 0.0 152,189,033

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-3 17 Calvert Cliffs - Ul September 4, 2003 Herman 0. Olsen (410) 495-6734 REPORTING MONTH August 2003 NO.

DATE TYPE DURATION REASON' METHOD OF CAUSE/CORRECTIVE ACTIONS F:

FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN 2 COMMENTS There were no shutdowns this month.

Reason:

A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2 Method:

1 - Manual 2 - Manual Scram.

3 - Automatic Scram.

4 - Continued 5 - Other

DOCKET NO. 50-317 CALVERT CLIFFS - UNIT 1 September 4, 2003

SUMMARY

OF OPERATING EXPERIENCE August 2003 The unit began the month at 100% power.

Power was reduced to approximately 87% on 08/01/2003 at 2202 for Main Turbine Valve Testing.

Testing was completed and the unit returned to 100% power on 08/02/2003 at 0230.

The unit operated at 100% power for the remainder of the month.

OPERATING DATA REPORT Docket No. 50-318 Calvert Cliffs Unit 2 September 5, 2003 Prepared by Herman 0. Olsen Telephone:(410)495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)

MAXIMUM DEPENDABLE CAP'Y (NET MWe)

AUGUST 2003 845 835 Year-Cumulative to-Date to Date This month

1. NUMBER OF HOURS REACTOR WAS CRITICAL
2. HOURS GENERATOR ON LINE
3. UNIT RESERVE SHUTDOWN HOURS
4. NET ELECTRICAL ENERGY GENERATED(MWH) 744.0 744.0 0.0 633,814 4,238.0 4,204.5 0.0 3,601,686 181, 797.8 179, 909.2 0.0 148,188,116

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-318 Calvert Cliffs-U2 I

September 4, 2003 Herman 0. Olsen (410) 495-6734 REPORT MONTH August 2003 NO.

DATE TYPE DURATION REASON' METHOD OF CAUSE/CORRECTIVE ACTIONS F:

FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN 2 COMMENTS There were no shutdowns this month.

I _____________

I I

Reason:

A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Other

d V *

  • DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 September 4, 2003

SUMMARY

OF OPERATING EXPERIENCE August 2003 The unit operated at 100% reactor power for the entire month.