W3F1-2003-0051, June 2003 Monthly Operating Report for Waterford 3 Ses

From kanterella
(Redirected from ML032040073)
Jump to navigation Jump to search
June 2003 Monthly Operating Report for Waterford 3 Ses
ML032040073
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/09/2003
From: Sen G
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
A4.05, W3F1-2003-0051
Download: ML032040073 (6)


Text

Entergy Operations, Inc.

17265 River Road at{swe rgy Killona, LA 70066

'~~~~~~~~~~~~~ ~~~~~~Tel 504 739 6650 W3FI-2003-0051 A4.05 PR July 9, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington; D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject report which covers the operating statistics for the month of June, 2003. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

There are no commitments associated with this submittal. Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.

Very truly yours, G. Sen Licensing Manager GS/rMM/cbh Attachment cc: T. P. Gwynn (NRC Region IV), N. Kalyanam (NRC-NRR),

J. Smith, N.S. Reynolds, B. Lewis (Platts Energy),

lerevents@inpo.org - INPO Records Center, NRC Resident Inspectors Office

NRC MONTHLY OPERATING REPORT WATERFORD ?

for June, 2003

SUMMARY

OF OPERATIONS The unit operated at an average reactor power level of 99.7% during the period.

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES There were no pressurizer safety valve failures or challenges experienced during the month.

MMoo Page: I of S

OPERATING DATA REPORT DOCKET NUMBER: 50-382

-, UNIT NAME: WATERFORD 3 DATE OF REPORT: July 3, 2003 COMPLETED BY: Jim Pollock TELEPHONE: (504) 739-6561 OPERATING STATUS

1. Reporting Period June, 2003 Gross Hours in Reporting Period  : 720
2. Currently Authorized Power Level (MWI) 3,441 Maximum Dependable Capacity (Net MWe) : 1,075 Design Electrical Rating (Net MWe)  : 1,104
3. Power Level to which Restricted (if any) (Net MWe) NIA
4. Reason for Restriction (if any)  : MNIA THIS YEAR TO MONTH DATE CUMULATIVE
5. Number of Hours Reactor was Critical 720.0 4,298.1 134,547.3
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator was On-line 720.0 4,245.3 133,207.8
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 2,470,519 14,586,662 444,320,613
10. Gross Electrical Energy Generated (MWH) 825,758 4,872,040 148,902,151
11. Net Electrical Energy Generated (MWH) 789,996 4,673,321 142,253,555
12. Reactor Service Factor 100.0 99.0 86.4
13. Reactor Availability Factor 100.0 99.0 86.4
14. Unit Service Factor 100.0 97.8 85.5
15. Unit Availability Factor 100.0 97.8 85.5
16. Unit Capacity Factor (using MDC) 102.1 100.1 85.0
17. Unit Capacity Factor (using DER) 99.4 97.5 82.7
18. Unit Forced Outage Rate 0.0 2.2 3.6 Wl"M Page: 2 of 5

OPERATING DATA REPORT DOCKET NUMBER: 50-382

  • UNIT NAME: WATERFORD 3 DATE OF REPORT: July 3, 2003 COMPLETED BY: Jim Pollock TELEPHONE: (504) 739-6561 OPERATING STATUS (Cont.)
19. Shutdowns Scheduled over next 6 months (type, date and duration of each):

REFUEL OUTAGE #12 - commencing on October 19, 2003 - 25 day outage

20. If Shutdown at end of report period, estimated date of startup: NIA
21. Unit is in Commercial ODeration.

THIS YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period 720 4,343 155,736
23. Unit Forced Outage Hours 0.0 97.7 4,995.6
24. Nameplate Rating (Gross MWe)  : 1,200 Max. Dependable Capacity (Gross MWe)  : 1,120
25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons:

NIA MMroo Page: 3 of 5

AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: July 3, 2003 COMPLETED BY: Jim Pollock TELEPHONE: (504) 739-6561 Reporting Period: June, 2003 (NET MWe)

DAY Avg. Power Level DAY Avg. Power Level 1 _1,104 16 1,101 2 1,102 17 1,101 3 1,101 18 1,102 4 1,101 19 1,101 5 1,101 20 1,102 6 1,098 21 1,102 7 1,002 22 1,103 8 1,090 23 1,103 9 1,100 24 1,102 10 1,100 25 1,100 11 1,1 26 1,101 12 1,100 27 1,100 13 1,100 28 1,100 14 1,101 29 1,099 15 1,100 30 1,100 INSTRUCTIONS:

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Reflects On-Line Net Generation.

7n/2003 Page: 4 of S

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: July 3, 2003 COMPLETED BY: Jim Pollock TELEPHONE: (504) 739-6561 REPORTING PERIOD: June, 2003 Outage Date

  • Duration ** Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NA TYPE REASON F - Forced AA - Equipment Failure (explain)

S - Scheduled IB - Maintenance or Test I - Refueling I) - Regulatory Restriction IE - Operator Training and METHOD License Examination 1 - Manual IF - Administrative 2 - Manual Scram (3 - Operational Error (explain) 3 - Automatic Scram 1- - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)

'7/7/003 Page: 5 of 5