|
---|
Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARML19004A3022018-12-19019 December 2018 Emergency Plan Changes Revision 61 to Revision 62 ML17006A3862017-01-0505 January 2017 FEMA - Submittal of After Action Report/Improvement Plan for Susquehanna Steam Electric Station 2016 Plume Exercise Evaluated on October 18, 2016 ML15264A6932015-09-21021 September 2015 SSES EAL Scheme Bases Document Redline Strike-out in Support of 9/23 Public Meeting PLA-7285, Revision (X) to EP-RM-004, EAL Classification Bases2015-03-19019 March 2015 Revision (X) to EP-RM-004, EAL Classification Bases PLA-7279, Submittal of Revision 56 to Emergency Plan2015-01-19019 January 2015 Submittal of Revision 56 to Emergency Plan ML0627801812006-09-22022 September 2006 Rev. 4 to TSB2, Technical Specifications Bases Unit 2 Manual and Rev. 75 to Manual Table of Contents ML0519904452005-07-0707 July 2005 Technical Specification Bases Unit 1 Manual, Revision 1 ML0410505062004-04-0707 April 2004 EP-PS-137, Rev 0, TSC NRC Communicator. ML0410504572004-04-0707 April 2004 Transmittal of Emergency Plan Implementing Procedure, EP-PS-126, Control Room (CR) Communicator. ML0410503912004-04-0707 April 2004 Transmittal of EP-PS-135, NRC Communicator: Emergency Plan Position Specific Procedure ML0410504682004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure EP-PS-243, Rev 5, Radiological Liaison. ML0410504632004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure EP-PS-221-1, Nearsite Emergency Monitoring Team: Emergency Plan-Position Specific Procedure. ML0410504602004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure, EP-PS-248, Environmental Sample Director. ML0409904242004-04-0101 April 2004 to EP-PS-248, Environmental Sample Director. ML0409004192004-03-23023 March 2004 EP-PS-113, Security Coordinator: Emergency Plan-Position Specific Procedure. ML0408406142004-03-10010 March 2004 EP-PS-101, Emergency Director (Ed). ML0408406122004-03-0808 March 2004 EP-PS-307, Engineering Support Manager. ML0408406062004-03-0808 March 2004 EP-PS-102, Technical Support Coordinator. ML0405503942004-02-16016 February 2004 Revision 10 to EP-PS-351, News Manager. ML0405503912004-02-16016 February 2004 EP-PS-367, General Office Operations Manager. ML0403502512004-01-28028 January 2004 EP-PS-245, Dose Assessment Supervisor. ML0403502642004-01-27027 January 2004 EP-PS-130, Rev 17, HP II Dose Calculator. ML0403502692004-01-27027 January 2004 EP-PS-244, Rev 7, Dose Assessment Staffer. ML0403502602004-01-27027 January 2004 EP-PS-104, Rev 17, Radiation Protection Coordinator (Rpc). ML0403502562004-01-27027 January 2004 EP-PS-105, TSC Dose Calculator. ML0402906032004-01-19019 January 2004 EP-PS-104, Rev. 17, Radiation Protection Coordinator (Rpc). ML0402905562004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-207, Rev. 11, EOF Support Supervisor: Emergency Plan Position Specific Procedure. ML0402905652004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-200, Rev. 16, Recovery Manager: Emergency Plan Position Specific Instruction. ML0402905412004-01-19019 January 2004 Revision 19 to EP-PS-100, Emergency Director/Control Room. ML0402905752004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-127, Rev. 16, TSC Emergency Plan Communicator: Emergency Plan Position Specific Procedure. ML0402905822004-01-19019 January 2004 EP-PS-114, Chemistry Coordinator. ML0402905942004-01-19019 January 2004 EP-PS-248, Environmental Sample Director. ML0402905982004-01-19019 January 2004 EP-PS-243, Radiological Liaison. ML0402906052004-01-19019 January 2004 Revision 19 to EP-PS-101, TSC Emergency Director. ML0402906082004-01-19019 January 2004 Revision 18 to EP-PS-212, EOF Communicator. ML0402905872004-01-19019 January 2004 EP-PS-247, Rev. 2, Field Team Director. PLA-5644, Proposed Emergency Plan Revision Requiring NRC Approval2004-01-16016 January 2004 Proposed Emergency Plan Revision Requiring NRC Approval ML0336405902003-12-19019 December 2003 Transmittal of EP-PS-100, Rev. 19 Emergency Director/Control Room: Emergency Plan-Position Specific Procedure. ML0335703252003-12-12012 December 2003 EP-PS-126, Revision 19, Control Room Communicator ML0335702972003-12-12012 December 2003 EP-PS-100, Emergency Director/Control Room. ML0335702992003-12-12012 December 2003 EP-PS-354, Media Operations Center (MOC) Communicator. ML0335703002003-12-12012 December 2003 EP-PS-212, Rev 18, EOF Communicator. ML0335703012003-12-12012 December 2003 EP-PS-207, Rev 11, Site Support Manager. ML0335703212003-12-12012 December 2003 EP-PS-137, Rev 0, TSC NRC Communicator. ML0335703232003-12-12012 December 2003 EP-PS-135, Rev 0, NRC Communicator. ML0335703242003-12-12012 December 2003 EP-PS-127, Rev 16, Technical Support Center (TSC) Communicator. ML0335703292003-12-12012 December 2003 EP-PS-114, Rev 10, Chemistry Coordinator: Emergency Plan-Position Specific Procedure. ML0335703302003-12-12012 December 2003 EP-PS-111, Rev 4, TSC Lead Engineer. ML0335703322003-12-12012 December 2003 EP-PS-103, Rev 6, Operations (OPS) Coordinator. ML0335703342003-12-12012 December 2003 EP-PS-102, Rev 23, Technical Support Coordinator. 2018-12-19
[Table view] Category:Manual
MONTHYEARML24194A0522024-06-28028 June 2024 Technical Requirements Manual ML24194A0782024-06-28028 June 2024 Technical Requirements Manual ML24183A2622024-06-19019 June 2024 Unit, Technical Specification Bases, Manual ML24183A2682024-06-19019 June 2024 Technical Specifications Bases, Manual PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 ML24115A0632024-04-17017 April 2024 Technical Requirements Manual ML24115A0602024-04-17017 April 2024 Technical Requirements Manual, Rev. 6 ML24103A2162024-04-0505 April 2024 Revision to Technical Requirements Manual ML24103A2142024-04-0505 April 2024 Technical Specifications Bases, Manual ML23345A0672023-11-28028 November 2023 Technical Specifications Bases Manual ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual ML23345A0842023-11-28028 November 2023 Technical Requirements Manual ML23345A0882023-11-28028 November 2023 Technical Requirements Manual ML23195A0342023-07-0606 July 2023 Technical Requirements Manual, Revision 21 ML23195A0352023-06-30030 June 2023 Revisions to Technical Requirements Manual ML23195A0332023-06-29029 June 2023 Technical Requirements Manual ML23107A1292023-03-31031 March 2023 Technical Specifications Bases, Unit 2 ML23107A1322023-03-31031 March 2023 Technical Requirements Manual, Unit 2 ML23025A0362023-01-16016 January 2023 Technical Specifications Bases Manual ML23017A0462023-01-0606 January 2023 Technical Specifications Bases, Manual ML23017A0552023-01-0606 January 2023 Technical Specification Bases, Manual ML22363A0972022-12-15015 December 2022 Technical Requirements Manual, Revision1 ML22363A0982022-12-15015 December 2022 Technical Requirements Manual, Rev. 1 for Section 4.7 ML22363A0992022-12-14014 December 2022 Technical Requirements Manual, Revision 28 ML22363A1022022-12-14014 December 2022 Technical Requirements Manual, Revision 29 ML22363A1012022-12-0909 December 2022 Technical Requirements Manual, Rev. 12 for Section 2 ML22363A1002022-12-0707 December 2022 Technical Requirements Manual, Rev.11 ML22287A1192022-10-0606 October 2022 Technical Requirement Manual ML22287A1202022-10-0606 October 2022 Technical Requirement Manual ML22180A1942022-06-10010 June 2022 Technical Specification Bases Unit 1 Manual ML22180A1952022-06-10010 June 2022 Technical Specifications Bases Unit 2 Manual ML22136A1582022-04-29029 April 2022 Technical Specification Bases Manual ML22123A0582022-04-22022 April 2022 Transmittal of Technical Requirements Manual ML22123A0752022-04-22022 April 2022 Technical Requirements Manual Unit 2 ML22101A0282022-03-30030 March 2022 Revised Technical Specification Bases Unit 1 Manual ML22101A0442022-03-30030 March 2022 Technical Requirements Manual ML22039A0352022-01-18018 January 2022 Technical Requirements Manual, Revision 4 ML22039A0462022-01-18018 January 2022 Technical Specifications Bases Manual, Revision 8 ML22039A0322022-01-17017 January 2022 Technical Requirements Manual, Rev. 4 ML22011A1392022-01-0404 January 2022 Electrical Station - Technical Requirements Manual, Unit 1 ML22011A1452022-01-0404 January 2022 Electrical Station, Unit 2 - Technical Requirements Manual Unit 2 ML21224A1882021-08-0202 August 2021 Technical Specifications Bases Unit 2 Manual ML21224A1892021-08-0202 August 2021 Technical Requirements Manual Unit 2 ML21209A5202021-07-16016 July 2021 Technical Requirements Manual ML21209A5212021-07-16016 July 2021 Technical Requirements Manual ML21202A1512021-07-0202 July 2021 Technical Requirements Manual ML21202A1592021-07-0202 July 2021 Technical Requirements Manual ML21196A1812021-06-24024 June 2021 Technical Requirements Manual ML21190A0522021-06-24024 June 2021 Technical Requirements Manual PLA-7927, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-79272021-04-26026 April 2021 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-7927 2024-06-28
[Table view] |
Text
Jul. 02, 2002 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2002-318 USER INFORMATION:
FLAIri1/2:Ut u b *EMPL#:23244 CA#: 0386 Aggress=: NUCSAZ Phone#: 254-3658 TRANSMITTAL INFORMATION:
TO: FT,ATM*LAU*tBL-B 07/02/2002 "LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER
.NUCSA-2)
.PHE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
113 - 113 - SECURITY COORDINATOR: EMERGENCY PLAN POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 05/10/2002 ADD MANUAL TABLE OF CONTENTS DATE: 07/01/2002 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-113 REPLACE: REV:8 REPLACE: REV:8 REMOVE: PCAF 2002-1242 REV: N/A ADD: PCAF 2002-1242 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
TABB7 EP-PS-1 13-7 CHECK-OFF LIST TITLE: MEDICAL EMERGENCY FATALITY DATE: 6/11/02 ISSUE: #2 ITEM CHECKED YES NO
- 1. THE EMERGENCY MEDICAL RESPONSE TEAM LEADER WILL NOTIFY THE SECURITY CONTROLLER A. Location of individuals B. Keycard number of individual(s)
NOTE: DO NOT BROADCAST INDIVIDUAL(S) NAME(S) OVER RADIO OR PA SYSTEM C. Radiological conditions at the scene D. Request for assistance and further instructions (if applicable)
- 2. THE SECURITY CONTROLLER WILL A. Notify the following of the fatality(ies)
- 1. Operations Shift Supervisor/Emergency Director
- 2. Security Shift Supervisor/Assistant
- 3. On-call TSC Security Coordinator (if manned)
- 4. County Coroner 717-825-1664 a) Request he respond to the SSES
- 5. Pennsylvania State Police 542-4117 OR 542-4118 a) Request they respond to SSES
- 6. General Manager-Plant Support or On-call Administrative Coordinator
- 3. DIRECT SECURITY PERSONNEL AT THE SCENE TO SECURE THE AREA AND ENSURE NO PHYSICAL EVIDENCE IS DISTURBED UNTIL ARRIVAL OF THE COUNTY CORONER AND/OR PENNSYLVANIA STATE POLICE EP-AD-000-396, Revision 2, Page I of I
TAB 8 EP-PS-1 13-8 CHECK-OFF LIST TITLE: ACCOUNTABILITY-ACTIONS FOR SECURITY DATE: 11/08/01 ISSUE: 7 ITEM CHECKED YES NO
- 1. NOTIFIED OF ACCOUNTABILITY A. Start "Accountability Control" program. This program starts the accountability process on the SSCS.
SECURITY IS REQUIRED TO REPORT THE RESULTS OF THE ACCOUNTABILITY WITHIN 30 MINUTES OF THE OFFICIAL START (NOTE: ACCOUNTABILITY OFFICIALLY STARTS WITH STATION ALARM OVER THE PA)
- 2. ASCC/SCC WILL NOTIFY OF ACCOUNTABILITY A. Security Shift Supervisor/Assistant B. All posts and patrols
- 3. INITIATE AN ACCOUNTABILITY OF SECURITY PERSONNEL A. The SCC/ASCC will verify all on duty Security shift personnel are accounted for B. Direct the ACO to stop processing All Non-Essential Personnel and Vehicles
- 1) South Gatehouse
- 2) North Gatehouse (when open)
- 4. MONITOR THE PROGRESS OF THE ACCOUNTABILITY USING SSCS A. Using the accountability status window on the SSCS B. Ifthe below listed work groups do not telephone their Accountability results into Security within 15 minutes - Security is required to call the work group(s) and request the status of their accountability
- 1) Operations - ext. 3907
- 2) Chemistry - ext. 3389
- 3) Health Physics - ext. 3371 EP-AD-000-385, Revision 11, Page 1 of 4
TAB 8 EP-PS-1 13-8 CHECK-OFF LIST TITLE: ACCOUNTABILITY-ACTIONS FOR SECURITY DATE: 11/08/01 ISSUE: 7 ITEM CHECKED YES NO
- 5. MONITOR CALLS FROM THE ACCOUNTABILITY AREA LEADERS AT THE ACCOUNTABILITY AREAS A. Accountability Area A POC:
S&A Cafeteria Phone Call back #:1624 B. Accountability Area B POC:
Effluents Meeting Area Phone Call back #:1644 C. Accountability Area C POC:
Warehouse, LCR Phone Call back #:3186 D. Accountability Area D POC:
i&C Shop 1 st Floor Phone Call back #:3713 2 story South Building E. Accountability Area E POC:
Cafeteria Conference Room Phone Call back #:1685 1s Floor Three Story South Bldg F. Accountability Area F POC:
211 Conference Rm Phone Call back #:1211 2 nd Floor Three Story South Bldg G. Accountability Area G POC:
TSC (Control Structure) Phone Call back #:3045
- 6. At 20 Minutes from start of Accountability A. Stop Accountability program in SSCS
- 1) Run Accountability Report of SSCS
- a. "People in the Plant who have not logged into Accountability Area since Accountability Started"
- 2) Print out a copy of the report a.. Purge the Accountability Report - cross off names of personnel accounted for by Security, Operations, HP, and Chemistry.
EP-AD-000-385, Revision 11, Page 2 of 4
TAB 8 EP-PS-1 13-8 TITLE: ACCOUNTABILITY-ACTIONS FOR SECURITY DATE: 11108101 ISSUE: 7 ITEM CHECKED YES NO
- 3) Prior to 30 minutes from the start of Accountability, report results to:
- a. TSC not activated or in control - Operations in the OSC @
ext. 3907
"**Also notify TSC Security Coordinator if TSC is activated.
- b. TSC activated and IN CONTROL - TSC Security Coordinator.
- c. Fax the reports to TSC Security Coordinator (if TSC is activated) 8-1-570-759-4942.
- 7. INITIATE A SECURITY ACCOUNTABILITY WITHOUT USING SSCS A. DISPATCH SECURITY FORCE MEMBERS TO ACCOUNTABILITY AREA PICK-UP POINTS FOR ACCOUNTABILITY ROSTER COLLECTIONS B. Initiate an Accountability of Security Personnel C. Dispatched Security Force Members are required to have Personnel Accountability Areas and Leader Assignments, Attachment B, SP-00 309, in their possession at the Pick-Up points. Copies of Attachment B are located with Mobile #1
- 1) PICK UP POINT #1 - S&A Building Lobby (Ext. 1624/3927)
- 2) PICK UP POINT #2 - South Building - 1 st Floor Conference Room (Ext. 1848)
D. If the below listed work groups do not telephone their Accountability results into Security within 15 minutes - Security is required to call the work group(s) and request the status of their Accountability
- 1) TSC Sec. Coordinator, ext. 353-4931 - (if TSC activated)
- 2) Operations - ext. 3907
- 3) Health Physics - ext. 3371
- 4) Chemistry - ext. 3389 EP-AD-000-385, Revision 11, Page 3 of 4
TAB 8 EP-PS-1 13-8 TITLE: ACCOUNTABILITY-ACTIONS FOR SECURITY DATE: 11/08101 ISSUE: 7 ITEM CHECKED YES NO
- 8. Prior to 30 minutes from the start of Accountability report results to:
A. TSC not activated or in control - Notify Operations in the OSC @
ext. 3907
"**Also notify TSC Security Coordinator if TSC is activated.
B. TSC activated and IN CONTROL - Notify the TSC Security Coordinator.
C. Fax the reports/lists of missing personnel to the TSC Security Coordinator (if TSC is activated) 8-1-570-759-4942 MISSING PERSONNEL WILL BE DETERMINED FROM ACCOUNTABILITY ROSTER(S) RECEIVED THAT HAVE PERSONNEL IDENTIFIED AS BEING UNACCOUNTED FOR.
NOTE: WHEN A ROSTER IS NOT RECEIVED FROM A GROUP, THAT GROUP WILL BE PRESUMED ACCOUNTED FOR OR NOT ON SITE.
- 9. Once an individual(s) is confirmed missing the SCC/ASCC Controllers need to reference the "Search and Rescue" check-off list.
EP-AD-000-385, Revision 11, Page 4 of 4