Charles H. Cruse 1650 Calvert Cliffs Parkway Vice President Lusby, Maryland 20657 Nuclear Energy 410 495-4455 m Constellation Nuclear Calvert Cliffs Nuclear Power Plant A Member of the Constellation Energy Group May 30, 2002 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos. I & 2; Docket Nos. 50-3 17 & 50-3 18 Supplemental Response to Commission Order to Modify License for Interim Safeguards and Security Measures On March 15, 2002, Calvert Cliffs Nuclear Power Plant, Inc. (CCNPP) submitted its response to the Interim Safeguards and Security Compensatory Measures Order issued by the Nuclear Regulatory Commission (NRC) on February 25, 2002.
We indicated in our response that additional time was necessary to complete analyses with respect to certain Interim Compensatory Measures (ICMs)
[i.e., ICMs B.2.a(1), B.2.a(2), and B.4.g] before we could submit a schedule for achieving compliance with those requirements, in accordance with Section III.C. 1 of the Order. We have now completed those analyses with respect to the remainder of those ICMs and are providing the required compliance schedule.
In accordance with 10 CFR 50.4, CCNPP hereby submits this supplemental response to the Order (Enclosure 1).
In this supplemental response we are also addressing ICMs B.l.b, B.2.e, and B.5.e. to this response contains safeguards information, as defined in 10 CFR 73.21. We, therefore, request that Enclosure 1 be withheld from public disclosure.
Pursuant to Section IV of the Order, on March 15, 2002, CCNPP requested an extension of time to file an answer and request for hearing with respect to ICMs B.2.a.(1), B.2.a.(2), and B.4.g. The NRC granted this request on May 24, 2002. Since the analyses are complete, we are prepared to file our answer at this time. Therefore, pursuant to the requirements of 10 CFR 2.202(a)(2), the Supplemental Answer to the Order is enclosed (Enclosure 2). to this letter contains "Safeguards Information." Upon separation of Enclosure 1, this cover letter is to be considered DECONTROLLED.
"'/4
Document Control Desk May 30, 2002 Page 2 Should you have questions regarding this matter, we will be pleased to discuss them with you.
Very truly yours, 7 Z STATE OF MARYLAND COUNTY OF CALVERT
- TO WIT:
The above-subscribed individual appeared before me and made oath that he is duly authorized to execute this response on behalf of Calvert Cliffs Nuclear Power Plant, the statements contained within this response are true to the best of his knowledge and belief, and that copies of the response were sent to the addressee and listed individuals.
Swoom before me, a Notary Public in, and for the State of Maryland and County of (6JJJ*'AiJ
, this j day of
,2002.
WITNESS my Hand and Notarial Seal:
My Commission Expires:
CHC/TER/bjd
Enclosures:
LJJfAt'LLe LIX I Notary Public LDate, I&,
Date As Stated Document Control Desk (original and 3 copies) cc:
(With Enclosures 1 & 2)
H. J. Miller, NRC (2 copies)
(With Enclosure 2)
S. J. Collins, NRC (Without Enclosures)
R. S. Fleishman, Esquire J. E. Silberg, Esquire D. M. Skay, NRC Director, Project Directorate I-1, NRC Resident Inspector, NRC R. I. McLean, DNR Assistant General Counsel for Materials Litigation and Enforcement, NRC Rulemakings and Adjudications Staff, NRC Secretary, Office of the Secretary, NRC A'bJtA_1