PSEG Nuclear LLC P.O Box 236, Hancocks Bndge, New Jersey 08038-0236 MAR 1 1 2003 LR-N03-0119 o PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for February 2003 are being forwarded.
Sincerely, Lon Waldinger Operations Director RAR Attachments C Distribution
-L
95-2168 REV 7/99
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-311 Salem 2 3/10/03 F. Todd (856) 339-1316 Reporting Period February 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1131 1092 Month Year-to-aate tumuiatlve 672 1416 121832 672 1416 118374 0
0 0
755213 1595201 120784176 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)
(1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F -Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-311 Salem 2 3/10/03 R. Ritzman (856) 339-1445 Summary Of Monthly Operating Experience
- Salem 2 began the month at 100% reactor power and remained there throughout the month.
° At the end of the month, Salem 2 completed 287 days of continuous on line operation.