L-MT-04-067, Supplemental Submittal in Support of 24-Month Fuel Cycles License Amendment Request

From kanterella
Jump to navigation Jump to search

Supplemental Submittal in Support of 24-Month Fuel Cycles License Amendment Request
ML043150428
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 11/05/2004
From: Thomas J. Palmisano
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-MT-04-067, TAC MC3692
Download: ML043150428 (3)


Text

~ii h

Monticello Nuclear Generating Plant CommittedtoNulearExce Operated by Nuclear Management Company, LLC November 5, 2004 L-MT-04-067 10 CFR Part 50 Section 50.90 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Monticello Nuclear Generating Plant Docket No. 50-263 License No. DPR-22 Supplemental Submittal in Support of 24-Month Fuel Cycles License Amendment Request (TAC No. MC3692)

Reference:

1) Letter from Nuclear Management Company, LLC to NRC Document Control Desk, "License Amendment Request To Support 24-Month Fuel Cycles," dated June 30, 2004 In Reference 1, the Nuclear Management Company, LLC (NMC) requested U. S.

Nuclear Regulatory Commission (NRC) approval of a License Amendment to the Monticello Nuclear Generating Plant (MNGP) Technical Specifications (TS).

Specifically, the NMC proposed revisions to the MNGP TS to support the implementation of 24-month fuel cycles.

NMC hereby provides, in Enclosure I to this letter, two of the MNGP Calculations performed to support the license amendment request noted in Reference 1.

This submittal of calculations in support of the Reference 1 license amendment request is administrative in nature and has no impact on the TS changes or justifications previously submitted. Therefore, the Determination of No Significant Hazards Consideration and Environmental Assessment submitted in Reference I are also applicable to this supplemental submittal.

This letter makes no new commitments or changes to any existing commitments.

7a J PaIm is ano Site Vice President, Monticello Nuclear Generating Plant Nuclear Management Company, LLC Enclosure 2807 West County Road 75. Monticello, Minnesota 55362-9637 c

Telephone: 763.295.5151

  • Fax: 763.295.1454

USNRC Page 2 cc:

Administrator, Region IIl, USNRC Project Manager, Monticello, USNRC Sr Resident Inspector, Monticello, USNRC Minnesota Department of Commerce (wlo enclosure)

ENCLOSURE I SAMPLE CALCULATIONS TO SUPPORT 24-MONTH FUEL CYCLES LICENSE AMENDMENT REQUEST

1) CA-97-241, Main Steam Line Steam Chase High Temperature Group 1 Isolation, Revision 11, December 31, 2003 '
2) CA-03-055, Instrument Drift Analysis, Barksdale B2T-A12SS Pressure Switches, Revision 0, December 1, 2003' 1 NMC is providing the most current revision of these calculations on a one-time basis and does not intend to provide the NRC with future revisions.

96 pages follow