L-93-275, Informs of Intention to Simplify Structure of QA Program Procedures

From kanterella
Jump to navigation Jump to search
Informs of Intention to Simplify Structure of QA Program Procedures
ML17352A330
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/07/1993
From: Goldberg J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-93-275, NUDOCS 9312150336
Download: ML17352A330 (3)


Text

ACCELERATED DI TRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSXON NBR:9312150336 DOC.DATE: 93/12/07 NOTARIZED:

NO FACXL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION GOLDBERG,Z.H.

'lorida Power 6 Light, Co.

RECIP.NAME RECXPXENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET g

05000250 05000251 R

SUBJECT:

Informs of intention to simplify structure of QA program I

procedures.

D DISTRIBUTION CODE:

Q004D COPIES RECEIVED:LTR Q ENCL Q SIZE:

TITLE: QA Topical Report,

Change, Amendment, or Correspondence (Docket/Utili 8 NOTES:

RECIPIENT XD CODE/NAME RAGHAVAN,L INTERNAL: NRR -DRII/RPEB G FTL 01, EXTERNAL: DMB/OSS NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME OC/LFDCB RGN2 FILE IHS COPIES LTTR ENCL A

D D

D NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK ROOiVI Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED'TTR 9

ENCL

Fiorida Power & Light Company, P.O. Box 14000, Juno Beach, FL 33408-0420 L-93-275 DEC -7 )993 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555

Subject:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 St. Lucie Units 1 and 2

Docket. Nos.

50-335 and 50-389 To ical ualit Assurance Re ort FPL T AR 1-76A)

Gentlemen:

The purpose of this letter is to inform you of our intention to simplify the structure of our Quality Assurance Program procedures.

Our current Quality Assurance Program procedure structure contains three levels:

1.

Florida Power 6 Light Topical Quality Assurance Report (TQAR) 2.

Quality Procedures (QPs) 3.

Quality Instructions (QIs)

The

QPs, in
general, assign responsibilities for action and describe the necessary interface between departments or organizations in achieving specific tasks.

We intend to eliminate QPs from the current 3-level structure.

The responsibilities contained in the QPs will be placed into the appropriate TQAR.

Applicable QIs will be modified, as appropriate, to contain any necessary detailed actions.

No commitments currently in the TQAR will be reduced.

Since these changes do not constitute a reduction in commitments in the Quality Program description already approved by the Nuclear Regulatory Commission, we intend to proceed and implement the revision.

The revision will be included in our next routine TQAR update in June, 1994.

If you have any questions, please call Mr. J.

E.

Geiger, Vice President.

Nuclear Assurance, at (407) 694-4630 or Mr. R. A. Symes, Quality Manager Juno Beach at (407) 694-4287.

Y urs trul A.

3.40023 H. Goldberg President, Nuclear Division cco o~

i(o an FPL Group company Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC Turkey Point Senior Resident Inspector, USNRC, St. Lucie Plant 9312150336 93i207 PDR ADOCK 05000250 p

PDR