ACCELERATED DIST BUTION DEMONSTRATlON SYS'I'hM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET 05000250 05000251 DISTRIBUTION CODE:
IE42D COPIES RECEIVED LTR ENCL SIZE:
TITLE: Operator Licensing Examination Reports NOTES:
ACCESSION NBR:9009250169 DOC.DATE: 90/09/14 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION HARRIS,K.N.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Responds to Generic Ltr 90-07, "Operator Licensing Natl Exam Schedule."
RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD/DSP/TPAB LHFB11 REG ILE 02 EXTERNAL: NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME EDISON,G NRR SHANKMAN,S NRR/DLPQ/LOLB10 RGN2 FILE 01 NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS'LEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
P.. Box 029100, Miami, FL, 33102-9100
~
~
~
> 0 1990 L-90-328 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washingtonr D
C 20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Generic Letter 90-07 0 erator Licensin National Examination Schedule As requested by Generic Letter 90-07, "Operator Licensing National Examination Schedule",
issued August 10,
- 1990, attached is the following information:
(1) estimates of the anticipated number of candidates to be examined during each site visit as assigned by Generic Letter 89-03 (Enclosure 1);
(2) the dates for requalification examinations during Fiscal Years 1991 through 1994 (Enclosure 2); and (3) the estimated number of candidates that will participate in the Generic Fundamental Examination Schedule (Enclosure 3).
Should there be any questions please contact us.
Very truly yours, K. N.
IUD arr3.s Site ice President WHB/OIH/oih cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector,
PDC an Fpl Group companY
Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Generic Letter 90-07 Enclosure 1
PROPOSED OPERATOR LICENSING EXAMINATIONSCHEDULE FACILITY: Turke Point Plant NRC REGION II FY 1991 FY 1992 (10/01/90 -
(10/01/91-09/30/91) 09/30/92)
FY 1993 (10/01/92-09/30/93)
FY 1994 (10/01/93-09/30/94)
- 1. Assigned Date (GL 89-03)
¹ RO
¹SRO Instant
¹SRO Upgrade
¹SRO Limited
- 2. Assigned Date (GL 89-03)
¹RO
¹SRO Instant
¹SRO Upgrade
¹SRO Limited 02/91 25 08/91 20 02/92 08/92 15 02/93 08/93 15 02/94 08/94 15
Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Generic Letter 90-07 Enclosure 2
PROPOSED REQUALIFICATIONEXAMINATIONSCHEDULE FACILITY: Turke Point Plant NRC REGION II Date Date Date Date Date FY 1991 (10/01/90-09/30/91) 01/07/91 01/14/91 01/21/91 01/28/91 02/04/91 FY 1992 (10/01/91-09/30/92) 02/03/92 02/1 0/92 02/17/92 02/24/92 03/02/92 FY 1993 (10/01/92-09/30/93) 02/01/93 02/08/93 02/15/93 02/22/93 03/01/93 FY 1994 (10/01/93-09/30/94) 01/31/94 02/07/94 02/14/94 02/21/94 02/28/94
Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Generic Letter 90-07 Enclosure 3
PROPOSED GENERIC FUNDAMENTALEXAMINATIONSCHEDULE Estimated Number of Candidates October 1990 FACILITY: Turke Point Plant February 1991 NRC REGION II June
'1991