L-82-202, Forwards Const/Startup Progress Update for Apr 1982

From kanterella
Jump to navigation Jump to search
Forwards Const/Startup Progress Update for Apr 1982
ML17212B602
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/13/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
L-82-202, NUDOCS 8205180200
Download: ML17212B602 (5)


Text

REGULAT'NFORMATION DISTRIBUTIONl'STEM

('RIDS)

'AOCE',SSION NBR:8205180200 DOC ~ DATE: 82/05( i3 NOTARI'ZED!

NO FAGIL:50 389 "St ~ Lucie 'PlantsUnitt-2i '-.Florida Power 8 L'ight Co.

'AUTH ~ NAME AUTHOR AFFILIATION UHRIGFR,E.

Florida 1Power,"$ 'Light Co ~

>RHCIP ~ NAME RECIPIENTAFFIL'IATION EISENHUTFD ~ G ~

.Division of 'Licensin'g I

~

~ ~ 4

SUBJECT:

'Forwards const/startup progress update ".for Apr 1982.

DISTRIBUTION >CODE: "8001S'COPIES RECEIYED!LTR; 3 ENCL

~

" "SI'ZE:,

<TI'TLE: PSAR/FSAR 'AMDTS and 'Related 'Correspondence NOTE'S:

DOCKET 05000389 RECIPIENT ID CODE/NAME A/D LICENSNG L'IC BR 03 L'A INTiERYAL': ELD/HDS2, IE/DEP <EPDS

<35 MPA NRR/DE/EQB 13

,NRR/DE/HGEB

'30 NRR/DE/MTEB 17 NRR/DE/SAB

'24 NRR/DHFS/HFEB$ 0 NRR/DHFS/OLB 34 NRR/DS I/AEB '26 NRR/DSI/OPB 10 NRR/DS I/ETSB 1?

'RR/DSI/PSB 19 NRR/DSI/RSB "23 Q4 EXTiERYAL": ACRS 41

.FEMA REP DIV '39 NRC tPDR 02 NTI'

~COPIES LTTR ENCL 1

0 rQ 1

0 1

1

,1 0

3

<<3 2

2

,1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 10 10 1

1 1

I 1

1 RECIPIENT ID CODE/NAME LI'C BR P$

BC NERSES t V- ~

01 IE.'F ILE IE/DEP/BPL<B

'36 NRR/DE/CEB

,11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB

?5 NRR/DHFS/L'QB.32 NRR/DHFS/PTRB20 NRR/DS I/ASB 27 NRR/DS I/CSB 09 NRR/DS I/ICSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 RGN2 BNL (AMDTS.ONL'Y)

LPDR

.03 NSIC 05

<<COPIES L'PTR ENCL 1

0 1

1

.1 1

53 1

"2 2

1 1

1 1

1 1

-1 1

1 1

1 1

1 1

1 1

1 1

1 1

2

?

1 1

1 1

1 1

lTOTAL'UMBER OF 'COPIES REQUIRED!

UTTR

'57

'ENCL

!52

0 A

II II

~

o l3 I

1 tj 4

t I

S

FLORIOA POWER 8( LIGHTCOMPANY May 13, 1982 L-82-202 Office of Nuclear Reactor Regul ati on Attenti on:

Mr. Darrel 1 G. Ei senhut, Director Division of Licensing U.S. Nuclear Regulatory Commi ssion Washington, D. C.

20555

Dear Mr. Eisenhut:

Re:

St. Lucie Unit 2 Docket No. 50-389 Construction/Start-u Pro ress'U date Attached is a report of the construction/start-up progress for St.

Lucie Unit 2 for April, 1982.

If you have any questions regarding the attached information, or would like addi tional information from Florida Power 8 Light Company (FPL), please feel free to call me or W. B. Derrickson, the St. Lucie Unit 2 Project General Manager (3O5) 552-4659.

Very truly your s, o

E. Uhri g Vice Pres ident Advanced Systems 5 Technology REU/RAK/ga Attachment cc:

W. H. Lovelace, Office Management 5 Program Analysis U ~ S. Nuclear Regulatory Commission J.

P. O'Reilly, Regional Administrator, Region II Harold F ~ Reis, Esquire pe

(/i PEOPLE... SERVING PEOPLE

ST~UCIE UNIT 2 CONSTRUCTION/START~

MONTHLY STATUS REPORT CURRENT PERIOD:

April, 1982 SCHEDULE STATUS:

Overall Project 87.15 Construction/Start-up 85.1$

Critical Path Variance

-9.0 Weeks Target Fuel Load Date 10/28/82 MAJOR WORK HIGHLIGHTS:

SCHEDULED ACTUAL 1 ~

Placed concrete for the RCB Maintenance Hatch Blockout 2.

Completed installation of the FHB Spent Fuel Racks 3.

Completed installation of the New Fuel Crane Inside the

'FHB 4.

Set the Reactor Vessel Head in Preparation for Cold Hydro 5.

Completed Construction on Generator and Controls (CTO-Sys 71) 6.

Completed Construction on Reactor Drain Tank and Pumps (CTO Sys. 44A) 7.

Completed Construction on Reactor Coolant Press.

Sys.

(CTO Sys 348) 04/23/82 06/07/82 04/15/82 04/21/82 05/08/82 04/23/82 02/Ol/82 04/30/82 04/13/82 04/22/82 04/21/82 04/29/82 04/28/82 04/26/82 BULK QUANTITY STATUS:

CURRENT TOTAL MONTH TO DATE QUANTITY QUANTITY QUANTITY PERCENT 04/30/82 AVERAGE MONTHLY

.INSTAL. ATE (QTY/MO) 104=..- 904 04/82 TO DATE FORECASTED Concrete (cy)

Large Bore Piping (lf)

Small Bore Piping (lf)

Instrument Tubing (lf)

Large Bore Hangers (ea)

Whipping Restraints Cable Tray (lf)

Conduit (Exp., Emb.,

U/D) (lf)

Lighting Conduit Power Cable Pull (lf)

Control Cable Pull (Inc.

Comm. )

(1f)

Signal Cable Pull (lf)

Terms - Pwz: Hi (ea)

Terms - Pwr Lo (ea)

Terms Control (ea)

Terms - Signal (ea) 137,947 75,781 84,478 92,429 3,420 481 39F823 345(,097

'101)085

~.461(,992 1(682(930 732 ( 746 463 10(477 41(179.

12(438 98;8 95.0 88.9 90.2 77.5 85.6 97.7 94.i4 84+

9.'5.0 79 '

55.,5 95,'1 88.5 58.6 29.5 ESSENTIALLY ESSENTIALLY 368 ESSENTIALLY'7 ESSENTI'ALLY ESSENTIALLY 837 5(723 65/963 73(693 ESSENTIALLY 283 3,152 2(629 COMPLETE COMPLETE 3 (570.

COMPLETE 3.00 20 COMPLETE COMPLETE 2,180 21(450 86(540 42190.0.

COMPLETE 510 2(280 1I 030 4(400 135 25 2/060 25(215 90(790 44(455 315 3,480 3(535 START-UP PROGRAM STATUS-.

System Turnovers (PTO)

System Turnovers (CTO)

Preoperational Test Procedures Preoperational Test Performed SCHEDULED TO 'DATE 248 135 204 88 COMPLETED TO DATE 213 54 202 14 SCHEDULE

'FQR MONTH 51 67 3

74 CURRENT HDHTH 24*

20*

1 1/43**

TOTAL REQUIRED 330 164 204 204

  • NOTE:

Includes packages in sign-off circuit

    • NOTE:

Includes preoperational tests in progress

i 0