MONTHYEARL-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-045, Report of 10 CFR 72.48 Plant Changes2024-03-27027 March 2024 Report of 10 CFR 72.48 Plant Changes L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-023, Unusual or Important Environmental Event - Turtle Mortality2024-03-0606 March 2024 Unusual or Important Environmental Event - Turtle Mortality L-2024-015, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2024-029, 2023 Annual Operating Report2024-02-28028 February 2024 2023 Annual Operating Report L-2024-026, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-02-27027 February 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-175, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-169, Correction to the 2022 Annual Radioactive Effluent Release Report2023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-158, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update 2024-09-09
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARL-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-098, And Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 And Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 ML23013A2032023-01-13013 January 2023 RAI Set 4 Draft Response L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-156, Correction to Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 1a Response2022-09-19019 September 2022 Correction to Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 1a Response L-2022-143, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 1A Response2022-09-0808 September 2022 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 1A Response L-2022-115, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 3 Response and Submittal of Superseded Response for One Set 2 RAI and One Supplement 1 Attachment2022-08-0909 August 2022 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 3 Response and Submittal of Superseded Response for One Set 2 RAI and One Supplement 1 Attachment L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response2022-07-11011 July 2022 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response L-2022-075, Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response2022-06-13013 June 2022 Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response L-2022-000, License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response2022-01-19019 January 2022 License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response L-2021-105, Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements2021-05-12012 May 2021 Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements L-2021-065, Response to Request for Additional Information. Relief Request Number RR 15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years2021-04-0101 April 2021 Response to Request for Additional Information. Relief Request Number RR 15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years L-2020-165, Supplement to Updated Final Response to NRC Generic Letter 2004-022020-12-0404 December 2020 Supplement to Updated Final Response to NRC Generic Letter 2004-02 L-2020-094, Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements2020-06-26026 June 2020 Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements L-2020-061, Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements2020-04-30030 April 2020 Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements ML20015A0282020-01-14014 January 2020 NMFS to NRC, Concurrence with Interim Response to Requests for Additional Information for St. Lucie Endangered Species Act Section 7 Consultation L-2019-164, Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control2019-09-11011 September 2019 Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control L-2019-166, Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response2019-08-21021 August 2019 Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response L-2019-153, Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-25025 July 2019 Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG L-2019-149, Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-24024 July 2019 Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG L-2019-118, Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation2019-06-28028 June 2019 Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation L-2019-107, License Amendment Request - Iodine Removal System Elimination2019-05-17017 May 2019 License Amendment Request - Iodine Removal System Elimination L-2019-056, Inservice Inspection Plan RAI Reply, Fifth Ten-Year Interval Unit 1 Relief Request2019-03-0707 March 2019 Inservice Inspection Plan RAI Reply, Fifth Ten-Year Interval Unit 1 Relief Request L-2018-205, Response to Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies2018-11-15015 November 2018 Response to Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies L-2018-153, Supplemental Information for License Amendment Request to Reduce the Number of Control Element Assemblies2018-08-17017 August 2018 Supplemental Information for License Amendment Request to Reduce the Number of Control Element Assemblies L-16-001, Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.2018-05-24024 May 2018 Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. L-2018-068, Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations2018-04-0303 April 2018 Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations L-77-291, Attachment a to L-77-291 Response to NRC Questions of May 24, 19772018-03-29029 March 2018 Attachment a to L-77-291 Response to NRC Questions of May 24, 1977 L-2018-040, Response to Request for Additional Information Regarding License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply2018-02-14014 February 2018 Response to Request for Additional Information Regarding License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply L-2018-006, Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b2018-02-0101 February 2018 Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b L-2017-210, Updated Final Response to NRC Generic Letter 2004-022017-12-20020 December 2017 Updated Final Response to NRC Generic Letter 2004-02 L-2017-216, License Renewal Commitments: Reactor Vessel Internals Aging Management Plan, Clarification of Responses to RAI 1 and RAI 62017-12-19019 December 2017 License Renewal Commitments: Reactor Vessel Internals Aging Management Plan, Clarification of Responses to RAI 1 and RAI 6 L-2017-209, Response to Request for Additional Information Regarding Fifth 10-Year Inservice Testing (IST) Program Interval Relief Request PR-012017-11-30030 November 2017 Response to Request for Additional Information Regarding Fifth 10-Year Inservice Testing (IST) Program Interval Relief Request PR-01 L-2017-159, Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 02017-09-13013 September 2017 Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 0 L-2017-116, Response to Request for Additional Information Regarding License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.52017-07-0303 July 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.5 L-2016-220, License Amendment Request EDG Day Tank Fuel Volume Change2016-12-0505 December 2016 License Amendment Request EDG Day Tank Fuel Volume Change L-2016-188, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)2016-11-0303 November 2016 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) L-2016-153, Response to Request for Additional Information Regarding License Amendment Request for Biological Opinion License Changes2016-08-11011 August 2016 Response to Request for Additional Information Regarding License Amendment Request for Biological Opinion License Changes L-2016-135, Second Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B2016-07-22022 July 2016 Second Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B L-2016-143, Response to Request for Additional Information for the Proposed Technical Specification Change to Remove the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank and Relocate to Licensee-Controlled Documents2016-07-15015 July 2016 Response to Request for Additional Information for the Proposed Technical Specification Change to Remove the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank and Relocate to Licensee-Controlled Documents L-2016-114, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 48.2016-07-0808 July 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 48. L-2016-102, RAI Reply - License Amendment Request, Containment Vacuum Gothic Analyses and Conforming Changes2016-05-0606 May 2016 RAI Reply - License Amendment Request, Containment Vacuum Gothic Analyses and Conforming Changes L-2016-104, RAI Reply - Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle2016-05-0606 May 2016 RAI Reply - Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle 2024-09-16
[Table view] |
Text
APR 0 1 2021 L-2021-065 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555-0001 RE: St. Lucie Nuclear Plant, Unit 2 Docket No. 50-389 Renewed Facility Operating License NPF-16 Response to Request for Additional Information. Relief Request Number RR#15. Extension of St.
Lucie Unit 2 RPV Welds from 10 to 20 Years
References:
- 1. Florida Power & Light Company letter L-2020-160, Relief Request Number RR#15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years, October 30, 2020 (ADAMS Accession No. ML20304A148)
- 2. NRR Email Capture, Relief Request RR#15 - Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years - Request for Additional Information (L-2020-LLR-0157), March 4, 2021 (ADAMS Accession No. ML21063A319)
In Reference 1, Florida Power & Light Company (FPL) submitted relief request (RR) #15 from the American Society of Mechanical EngineersSection XI Code (ASME Section XI Code) for the St. Lucie Unit 2 Fourth 10-Year lnservice Inspection (ISi) Interval. The request would defer volumetric examination of the St. Lucie Unit 2 reactor pressure vessel (RPV) full penetration pressure-retaining (Examination Category B-A and B-O) welds from the fourth interval in 2023 to the fifth interval in 2032, resulting in an approximate 10-year deferral. The relief request was developed using the methodology defined in WCAP-16168-NP-A, Revision 3, "Risk-Informed Extension of the Reactor Vessel In-service Inspection Interval."
In Reference 2, the NRC requested additional information determined necessary to complete its review.
The enclosure to this letter provides FPL's response to the request for additional information (RAI).
This letter contains no new regulatory commitments.
Should you have any questions regarding this submittal , please contact Mr. Ken Frehafer, St. Lucie Licensing, at (772) 467-7748.
Sincerely, Enclosure cc: USNRC Regional Administrator, Region II USNRC Project Manager, St. Lucie Nuclear Plant, Units 1 and 2 USNRC Senior Resident Inspector, St. Lucie Nuclear Plant, Units 1 and 2 Ms. Cindy Becker, Florida Department of Health Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
St. Lucie Nuclear Plant, Unit 2 L-2021-065 Docket No. 50-389 Enclosure Page 1 of 3 ENCLOSURE Response to Request for Additional Information Relief Request Number RR#15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years In Reference 1, Florida Power & Light Company (FPL) submitted relief request (RR) #15 from ASME Section XI Code for the St. Lucie Unit 2 Fourth 10-Year Inservice Inspection (ISI) Interval. The relief request was developed using the methodology defined in WCAP-16168-NP-A, Revision 3, Risk-Informed Extension of the Reactor Vessel In-service Inspection Interval (Reference 2). In Reference 3, the NRC requested additional information determined necessary to complete its review, as indicated below. FPLs response to the NRC request for additional information (RAI) follows.
Regulatory Requirements/Background Title 10 of the Code of Federal Regulations (10 CFR) Part 50.55a(z) establishes a process for licensees to propose alternatives to codes and standard requirements. Specifically, for alternatives requested under the criteria in 10 CFR 50.55a(z)(1), FPL must demonstrate that the proposed alternative would provide an acceptable level of quality and safety. The following requests for additional information (RAIs) are needed to reach a conclusion that FPL's proposed alternative achieves an acceptable level of quality and safety in lieu of following the applicable ASME Section XI requirements referenced in the October 30, 2020 letter.
RAI-1
In FPL's proposed alternative, the licensee requests staff authorization to defer the following until the 5th 10-Year ISI interval for the unit:
- 1) the inspections of the RPV pressure retaining welds required to be inspected in accordance with ASME Section XI, Table IWB-2500-1, Examination Category B-A, Inspection Items B1.11, B1.12, B1.21, B1.22, and B1.30, and
- 2) the inspections of RPV nozzle-to-shell welds and inside radius sections required to be inspected in accordance with ASME Section XI, Table IWB-2500-1, Examination Category B-D, Inspection Items B3.90 and B3.100.
FPL makes the following statement in Section 5 of the RR#15 enclosure:
"The impact to the implementation plan in OG-10-238 would increase the number of inspections in 2032 (from three to four) and decrease the number of inspections in 2030 (from five to four)."
Tables 4-2, 6-1, and 6-2 in WCAP-18275-NP, Revision 0, as referenced in Reference No. 9 of the RR#15 enclosure, indicate that there are many more RPV weld seam and inside radius section locations that would need to be inspected during the 4th interval (i.e., if the Code rules were followed) than just eight RPV pressure retaining components. Thus, the staff is unable to determine whether the "number of inspections" terminology included in the referenced RR#15 statement is being made in reference to a specific set of eight RPV weld or nozzle inside radius section locations, or rather to a specific population of RPV components for each RPV component type that is required to be inspected in accordance with the specific ASME Section XI Inspection Items referenced in RR#15.
Request Please clarify whether the term "number of inspections" in Section 5 of the RR#15 enclosure is being made in relation to inspection of specific RPV weld or nozzle inside radius section locations or in reference to a
St. Lucie Nuclear Plant, Unit 2 L-2021-065 Docket No. 50-389 Enclosure Page 2 of 3 specific population of RPV components for each of RPV component type that is required to be inspected in accordance with the specific ASME Section XI Inspection Items referenced in RR#15 FPL Response:
The term number of inspections in Section 5 of the RR#15 represents the number of expected subsequent reactor vessel ISI examinations of the U.S. PWR fleet during a specific year based on the implementation plan in OG-10-238 (Reference 4). The term number of inspections is not made in relation to any specific reactor pressure vessel (RPV) weld or nozzle inside radius section locations or in reference to a specific population of RPV components for each of RPV component type.
RAI-2
Issue The criteria in ASME Section XI Paragraph IWB-2411 require the licensee to perform a volumetric inspection of essentially 100% of the population of components in the specified ASME Section XI Inspection Items for the reference B-A and B-D Examination Categories. However, the relief request does not specifically state that the licensee will inspect essentially 100% of the population of RPV components for the specified component type in each of the ASME Section XI Inspection Items referenced in RR#15.
Request For each of the ASME Section XI, Table IWB-2500-1, Examination Category B-A and B-D inspection items referenced in RR#15, identify the percent (%) population of components that will be inspected during the alternate 20-Year ISI interval (i.e., the interval duration for the 4th and 5th 10-Year ISI Intervals combined) proposed in RR#15.
FPL Response:
Consistent with the requirements of ASME Section XI, 2007 Edition through the 2008 Addenda, Table IWB-2500-1, Examination Category B-A Pressure Retaining Welds in Reactor Vessel and B-D Full Penetration Welded Nozzles in Vessels (Reference 5), FPL will examine 100% of the required RPV welds applicable to St. Lucie Unit 2.
RAI-3
Issue Table 2 in RR#15 identifies that FPL performed volumetric ISI examinations of the RPV pressure retaining welds in 1989, 2000, and 2012.
FPL identifies that there were five (5) indications that were detected within the inner 1/10th or inner 1 inch of the RPV wall thickness, with three (3) of the indications referenced as weld indications and two (2) of the indications referenced as plate indications. It is not evident whether the Year 2012 inspections of the welds containing these indications were the first inspections that revealed evidence of flaw indications or re-inspections of the welds containing the flaw indications (meaning the flaw indications were first detected during inspections prior to Year 2012). The staff seeks additional information relative to the risk-based assessments of these flaw indications to confirm that any potential growth of the flaws is bounded by fatigue flaw growth assumptions and values used in the WCAP-16168-NP-A, Rev. 3 methodology.
St. Lucie Nuclear Plant, Unit 2 L-2021-065 Docket No. 50-389 Enclosure Page 3 of 3 Request a) Clarify whether the five (5) flaw indications are a subset or the 60 flaw indications that were identified as being acceptable per ASME Section XI Table IWB-3510-1 or in addition to the 60 indications that were found to be acceptable per Table IWB-3510-1.
b) Confirm whether the Year 2012 inspections were the first ISI inspections that detected the flaw indications and whether there is any site-specific flaw growth data for the flaw indications evaluated in Table 2 of RR#15. If there is applicable site-specific flaw growth data for the flaw indications, identify the limiting site-specific flaw growth value that was calculated for the flaws evaluated in Table 2.
FPL Response The five (5) flaw indications in Table 2 of RR#15 (Reference 1) are a subset of the total 60 flaw indications that were identified as acceptable per ASME Section XI Table IWB-3510-1 (Reference 5).
The 2012 inspections were the first ISI examinations that detected the 60 flaw indications evaluated in Table 2 of RR#15. There is no site-specific flaw growth data for the flaw indications evaluated in Table 2 of RR#15 since these flaw indications are indicative of fabrication flaws typical of small slag inclusions.
References
- 1. Florida Power & Light Company letter L-2020-160, Relief Request Number RR#15, Extension of St.
Lucie Unit 2 RPV Welds from 10 to 20 Years, October 30, 2020 (ADAMS Accession No. ML20304A148)
- 2. Westinghouse Report, WCAP-16168-NP-A, Revision 3, Risk-Informed Extension of the Reactor Vessel In-service Inspection Interval, October 2011 (ADAMS Accession Number ML11306A084).
- 3. NRR Email Capture, Relief Request RR#15 - Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years - Request for Additional Information (L-2020-LLR-0157), March 4, 2021 (ADAMS Accession No. ML21063A319)
- 4. Pressurized Water Reactor Owners Group (PWROG) Letter OG-10-238, Revision to the Revised Plan for Plant Specific Implementation of Extended Inservice Inspection Interval per WCAP-16168-NP, Revision 1, Risk-Informed Extension of the Reactor Vessel In-Service Inspection Interval. PA-MSC-0120, July 12, 2010 (ADAMS Accession Number ML11153A033)
- 5. American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 2007 Edition through 2008 Addenda, American Society of Mechanical Engineers, New York