L-2012-152, Environmental Protection Plan Report, Revised Iww Permit No. FL0002208

From kanterella
Jump to navigation Jump to search
Environmental Protection Plan Report, Revised Iww Permit No. FL0002208
ML12093A404
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/30/2012
From: Katzman E
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
FL0002208, L-2012-152
Download: ML12093A404 (21)


Text

S Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 FPL March 30, 2012 L-2012-152 10 CFR 50.4 EPP 3.2.3 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Environmental Protection Plan Report Revised IWW Permit No. FL0002208 Pursuant to section 3.2.3 of the St. Lucie Environmental Protection Plan, Florida Power &

Light Company (FPL) is hereby forwarding the enclosed copy of the revision to the Industrial Wastewater Facility Permit (Permit Number FL0002208) as issued by the State of Florida Department of Environmental Protection on March 23, 2012.

Please contact Vince Munnd (772) 263-2847 should you have any questions on this matter.

Sincerely, Eric S. Katzman Licensing Manager St. Lucie Plant ESK/kdr Enclosure an FPL Group company

Enclosure Revision to the Industrial Wastewater Facility Permit No. FL0002208 (19 pages)

11049-WRick Scott Florida Department of Governor Environm ental Protection Jennifer Carroll Bob Martinez Center Lt. Governor 2600 Blair Stone Road

- . .Secretary

. . Tallahassee,

. . Florida

. .32399-2400

. . Herschel T. Vinyard Jr.

March 23, 2012 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Richard L. Anderson Vice President Florida Power & Light P.O. Box 111 Tampa, Florida 33601-0111 Re: Florida Power & Light (FPL)

St. Lucie Power Plant Units 1 and 2 NPDES Permit FL0002208 Minor Permit Revision for Minor Corrections and Extension of Time for Plan of Study Submittal

Dear Mr. Anderson:

The Department reviewed FPL's minor revision application dated January 26, 2012 for minor typographical corrections to the permit and an extension of time for the submittal of the Biological Plan of Study and Heated Water Plan of Study. After review, the Department hereby approves the request pursuant to Rules62-620.200(24),62-620.200(25), and 62-620.325(2), Florida Administrative Code (F.A.C.). All other conditions of Permit FL0002208 shall remain the same except as specifically revised. Please attach this letter to Wastewater Permit FL0002208. Also attached are the revised pages of the permit and DMR. If you object to this permit revision you may petition for an administrative hearing in accordance with the enclosed Notice of Rights. If a petition is filed, then this permit revision does not become effective. If you have any questions regarding this permit revision, please contact Mr. Marc Harris, P.E., in the Industrial Wastewater Section at (850) 245-8589.

Sincerely_,

Mark P. Thomasson, P.E.

Director Division of Water Resource Management 2600 Blair Stone Road Tallahassee, Florida 32399-2400 (850) 245-8336 MT/mh/bn Enclosures cc: John A. Armstrong, P.E., DEP West Palm Beach Michael Hambor, DEP West Palm Beach Terry Davis, DEP Port St. Lucie John Jones, FPL

NOTICE OF RIGHTS A person whose substantial interests are affected by this permit revision may petition for an administrative proceeding (hearing) in accordance with Section 120.57, Florida Statutes. The petition must contain the information set forth below and must be filed (received) in the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399-3000, within 14 days of receipt of this Permit. A petitioner, other than the applicant, shall mail a copy of the petition to the applicant at the address indicated in the attached letter at the time of filing.

Failure to file a petition within this time period shall constitute a waiver of any right such person may have to request an administrative determination (hearing) under Section 120.57, Florida Statutes.

The Petition shall contain the following information:

(a) The name, address, and telephone number of each petitioner; the name, address, and telephone number of the petitioner's representative, if any; the Department case identification number and the county in which the subject matter or activity is located; (b) A statement of how and when each petitioner received notice of the Department action; (c) A statement of how each petitioner's substantial interests are affected by the Department action; (d) A statement of all disputed issues of material fact. If there are none, the petition must so indicate; (e) A statement of facts that the petitioner contends warrant reversal or modification of the Department action; (f) A concise statement of the ultimate facts alleged, as well as the rules and statutes which entitle the petitioner to relief; and (g) A statement of the relief sought by the petitioner, stating precisely the action that the petitioner wants the Department to take.

If a petition is filed, the administrative hearing process is designed to formulate agency action.

Accordingly, the Department's final action may be different from the position taken by it in this intent.

Persons whose substantial interests will be affected by any decision of the Department with regard to the application have the right to petition to become a party to the proceeding. The petition must conform to the requirements specified above and be filed (received) within 14 days of receipt of this intent in the Office of General Counsel at the above address of the Department. Failure to petition within the allowed time frame constitutes a waiver of any right such person has to request a hearing under Section 120.57, F.S., and to participate as a party to this proceeding. Any subsequent intervention will only be at the approval of the presiding officer upon motion filed pursuant to Rule 28-5.207, F.A.C.

97Y FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION 2600 BLAIR STONE ROAD TALLAHASSEE, FLORIDA 32399-2400 STATEMENT OF BASIS FOR MINOR PERMIT REVISION Permit Number: FL0002208 DEP File #: FL0002208-013-IWB Permit Writer: Bala Nori Designation: Major

1. SYNOPSIS OF APPLICATION A. Name and Address of Applicant:

Florida Power & Light (FPL) 6501 S. Ocean Drive Jensen Beach, FL 34957 For:

Florida Power & Light (FPL)

St. Lucie Power Plant Units 1 and 2 Hutchinson Island St. Lucie County, FL B. Description of Proposed Activity On January 26, 2012, the Department received a minor revision application for the above referenced NPDES permit for the Florida Power & Light (FPL) St. Lucie Power Plant Units I and 2.

The permittee requested minor changes and typographical corrections to the final renewal permit issued on September 29, 2011.

C. Changes to Permit (1) Permit Condition IX.22, Page 24. The permittee requested that the references in this standard permit condition be corrected. The Department occurred and the references updated.

D. Changes to Discharge Monitoring Reports (DMRs)

(1) For the Flow Parameter associated with Monitoring Group Number D-001, under Sample Type, the Permittee requested that "Pump Curves" be changed to "Pump Logs".

(2) For the Chlorination Duration parameter associated with Monitoring Group Number D-001, the Permittee requested that a designated entry be provided in the report for both Unit I (U-I) and Unit 2 (U-2).

(3) For the Monitoring Group Description associated with Monitoring Group Number 1-003, the Permittee requested that the caption after "MONITORING GROUP DESCRIPTION" be changed to, "Liquid radiation waste discharge canal to the Atlantic Ocean."

I

E. Changes to Administrative Order (1) The permittee requested that the final reports for the Biological Plan of Study and Heated Water Plan of Study be due 120 days, instead of 60 days, after completion of these plans of study to allow adequate time to evaluate the data. These time extensions do not affect the final compliance date. Hence, the Department agreed to the request and amended the Administrative Order.

2

Administrative Order No. AO022TL FPL St. Lucie Power Plant NPDES Permit No. FL0002208

16. Until the Permittee has installed and calibrated new thermometer(s) for ambient temperature monitoring, the Permittee shall calculate the temperature rise above ambient at Outfall D-001 by subtracting the temperature measured at INT-1 from that measured at EFF-2. Monitoring locations INT-1 and EFF-2 are defined in condition I.A.2 of Permit No. FL0002208.
17. No later than 90 days after the effective date of this Order, the Permittee shall prepare and submit for the Department's review and approval a plan of study (Heated Water POS) and schedule to confirm the results of the mathematical model used for simulating the near and far field extent of the Facility's heated water discharge. The Heated Water POS shall be designed and implemented to demonstrate that the heated water discharge from the Facility: 1) does not raise the surface temperature near the Facility's open ocean outfalls to more than 977F; 2) does not heat adjacent coastal waters more than the limitations specified in Rule 62-302.520(4)(b), F.A.C.; and 3) does not raise the cooling water entering the Facility above ambient temperature. The study shall commence within 90 days of completion of both uprate projects for Unit 1 and 2. The study shall last no less than 24 months from commencement. The results of the study shall be submitted in a report (Heated Water Report) to the Department for review and approval no later than 60 120 days after the approved Heated Water POS completion date. The schedule shall include milestones and the completion date.
18. If the Heated Water Report fails to demonstrate that the heated water discharge from the Facility meets the discharge limitations in Part 111. 17 of this Order, the Permittee shall prepare a feasibility study report (Engineering Report) for the evaluation of engineering options to achieve the discharge limitations. The Engineering Report shall be submitted to the Department for review and approval no later than 90 days after the approved Heated Water POS completion date. The options shall be ranked based on equal weighting of technical and economic feasibility. The results of the ranking shall be presented in the Engineering Report. In addition, the Engineering Report shall include a plan and schedule for implementing the highest ranked option. The schedule shall include milestones and the completion date. The implementation shall take no longer than 24 months from Department approval.
19. The Permittee shall provide a status report demonstrating progress toward compliance with the discharge limitation every six months following the approval of the Engineering Report, until compliance is achieved pursuant to Section I.A. of the Permit. The status reports shall document accomplishment of milestones established by the schedule in the approved Engineering Report.
20. No later than 90 days after the effective date of this Order, the Permittee shall prepare and submit for the Department's review and approval a biological plan of study (Biological POS) and schedule.

Biological POS shall be designed to generate information relevant to the following elements: 1) "a population typically characterized by diversity at all trophic levels;" 2) "the capacity to sustain itself through cyclic seasonal changes;" 3) "presence of necessary food chain species;" 4) "non-domination of pollution-tolerant species;" and 5) "indigenous." Each of these elements is discussed in more detail in Paragraphs M. 21-25 of this Order. In addition to the foregoing elements, the Biological POS shall also include provisions for the identification of Representative Important Species (e.g., a list of threatened, endangered, thermally sensitive, or commercially or recreationally valuable species in up-and down-stream of the study area). Representative Important Species is defined as "species which are representative, in terms of their biological needs, of a balanced, indigenous community of shellfish, fish and wildlife in the body of water into which a discharge of heat is made." The study shall collect data pre- and post-completion of the uprate of Units I and 2 and shall last no less than 24 months after completion of the uprate. The results of the study shall be submitted in a report (Biological Report) to the Department for review and approval no later than 60 120 days after the approved Biological POS completion date. The schedule shall include milestones and the completion date.

3

STATE OF FLORIDA INDUSTRIAL WASTEWATER FACILITY PERMIT PERMITTEE: PERMIT NUMBER: FL0002208 (Major) Rev. A Florida Power & Light (FPL) FILE NUMBER: FL0002208-01 1-IW IS ISSUANCE DATE: September 29, 2011 REVISION DATE: March 23, 2012 RESPONSIBLE OFFICIAL: EXPIRATION DATE: September 28, 2016 Richard L. Anderson Vice President 6501 S. Ocean Drive Jensen Beach, Florida 34957 FACILITY:

St. Lucie Power Plant Units 1 and 2 Hutchinson Island St. Lucie County, Florida Latitude: See Note Below Longitude: See Note Below Note: Latitude and longitude are not shown at the permittee's request, for purposes of Homeland Security pursuant to federal regulations found at 18 CFR 388.113(c)(i) and (ii) and by Presidential Directive dated December 17, 2003.

This permit is issued under the provisions of Chapter 403, Florida Statutes (F.S.), and applicable rules of the Florida Administrative Code (F.A.C.) and constitutes authorization to discharge to waters of the state under the National Pollutant Discharge Elimination System. This permit does not constitute authorization to discharge wastewater other than as expressly stated in this permit. This permit is accompanied by an Administrative Order, pursuant to paragraphs 403.088(2)(e) and (f),

Florida Statutes. Compliance with Administrative Order, AO022TL is a specific requirement of this permit. The above named permittee is hereby authorized to operate the facilities in accordance with the documents attached hereto and specifically described as follows:

FACILITY DESCRIPTION:

The facility is an electric generating plant with a total nameplate rating of 1908 megawatts. The facility consists of two nuclear powered steam electric generating units (Unit 1 and Unit 2).

Units 1 and 2 use water from the Atlantic Ocean, a Class Im marine water body, to remove heat from the main condensers via the once-through cooling water (OTCW) and auxiliary equipment cooling water (AECW) systems. Cooling water gravity flows from the Atlantic Ocean through three offshore intake structures into the intake canal. The water is then pumped through the main condensers for each unit. Heated cooling water is released to the discharge canal and back to the Atlantic Ocean through existing offshore Y and multi-port diffusers.

Units 1 and 2 are also regulated under the Florida Electrical Power Plant Siting Act (License No. PA74-02).

The radioactive component of the discharge is regulated by the U.S. Nuclear Regulatory Commission under the Atomic Energy Act, and not by the Department or the U.S. Environmental Protection Agency under the Clean Water Act.

WASTEWATER TREATMENT:

Facility discharge and treatment include the following. Once-through non-contact condenser cooling water (OTCW) and auxiliary equipment cooling water (AECW) are chlorinated. Low volume waste (LVW) (consisting of water treatment system wastewater, steam generator/boiler blowdown, and equipment area floor drainage), non-radioactive wastes/liquid radiation waste, and stormwater associated with industrial activity are treated by chemical/physical processes including neutralization, settling, ion exchange and micro filtration. Non-industrial stormwater and intake screen wash water are discharged without treatment.

PERMITTEE: Florida Power & Light (FPL) PERMIT NUMBER: FL0002208 (Major) (Rev A)

FACILITY: St. Lucie Power Plant EXPIRATION DATE: September 28, 2016

c. If the oral report has been received within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the noncompliance has been corrected, and the noncompliance did not endanger health or the environment, the Department's Southeast District Office shall waive the written report.

[62-620.610(20)]

21. The permittee shall report all instances of noncompliance not reported under Permit Conditions IX. 17, 18 or 19 of this permit at the time monitoring reports are submitted. This report shall contain the same information required by Permit Condition IX.20 of this permit. [62-620.610(21)]
22. Bypass Provisions.
a. "Bypass" means the intentional diversion of waste streams from any portion of a treatment works.
b. Bypass is prohibited, and the Department may take enforcement action against a permittee for bypass, unless the permittee affirmatively demonstrates that:

(1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage; and (2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and (3) The permittee submitted notices as required under Permit Condition IX.22.b.c. of this permit.

c. If the permittee knows in advance of the need for a bypass, it shall submit prior notice to the Department, if possible at least 10 days before the date of the bypass. The permittee shall submit notice of an unanticipated bypass within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of learning about the bypass as required in Permit Condition IX.20. of this permit. A notice shall include a description of the bypass and its cause; the period of the bypass, including exact dates and times; if the bypass has not been corrected, the anticipated time it is expected to continue; and the steps taken or planned to reduce, eliminate, and prevent recurrence of the bypass.
d. The Department shall approve an anticipated bypass, after considering its adverse effect, if the permittee demonstrates that it will meet the three conditions listed in Permit Condition IX.22.ab. I through 3 of this permit.
e. A permittee may allow any bypass to occur which does not cause reclaimed water or effluent limitations to be exceeded if it is for essential maintenance to assure efficient operation. These bypasses are not subject to the provisions of Permit Condition IX.22.a. through c. of this permit.

[62-620.610(22)]

23. Upset Provisions.
a. "Upset" means an exceptional incident in which there is unintentional and temporary noncompliance with technology-based effluent limitations because of factors beyond the reasonable control of the permittee.

(1) An upset does not include noncompliance caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, careless or improper operation.

(2) An upset constitutes an affirmative defense to an action brought for noncompliance with technology based permit effluent limitations if the requirements of upset provisions of Rule 62-620.610, F.A.C., are met.

b. A permittee who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed contemporaneous operating logs, or other relevant evidence that:

(1) An upset occurred and that the permittee can identify the cause(s) of the upset; (2) The permitted facility was at the time being properly operated; (3) The permittee submitted notice of the upset as required in Permit Condition IX.5. of this permit; and (4) The permittee complied with any remedial measures required under Permit Condition IX.5. of this permit.

c. In any enforcement proceeding, the burden of proof for establishing the occurrence of an upset rests with the permittee.
d. Before an enforcement proceeding is instituted, no representation made during the Department review of a claim that noncompliance was caused by an upset is final agency action subject to judicial review.

24

DEPARTMENT OF ENVIRONMENTAL PROTECTION DISCHARGE MONITORING REPORT - PART A When Completed mall this report to: Department of Environmental Protection, Wastewater Compliance Evaluation Section, MS 3551, 2600 Blair Stone Road, Tallahassee, FL 32399-2400 PERMIHTEE NAME: Florida Power & Light (FPL) PERMIT NUMBER: FL0002208-011-IWIS MAILING ADDRESS: 6501 S. Ocean Drive Jensen Beach, Florida 34957 LIMIT: Final REPORT FREQUENCY: Monthly CLASS SIZE: MA PROGRAM: Industrial FACILITY: St. Lucie Plant Units I and 2 MONITORING GROUP NUMBER: D-001 LOCATION: Hutchinson Island, FL MONITORING GROUP DESCRIPTION: Condenser once-through cooling water and auxiliary equipment cooling water from Units I and 2 to the discharge canal thence the Atlantic Ocean.

RE-SUBMITTED DMR: E]

NO DISCHARGE FROM SITE: C]

COUNTY: St. Lucie MONITORING PERIOD From: To:

OFFICE: Southeast District Parameter Quantity or Loading Units Quality or Concentration Units No. Frequency of Sample Type

_Ex. Analysis Flow Sample Measurement PARM Code 50050 1 Permit Report MGD Hourly Pump Logs Mon. Site No. FLW-I - Requirement (Day.Max.)

Temperature (F), Water Sample (During Normal Operation) Measurement PARM Code 00011 1 Permit Report Deg F Hourly Recorder Mon. Site No. EFF-2 Requirement _(Day.Max.)

Temperature (F), Water Sample (During Maintenance Activities) Measurement _

PARM Code 00011 Q Permit 117 Deg F Hourly Recorder Mon. Site No. EFF-2 Requirement (Day.Max.)

Temp. Diff. between Intake and Sample Discharge (During Normal Operation) Measurement '

PARM Code 61576 1 Permit 30 Deg F Hourly Calculated Mon. Site No. EFF-2 Requirement (Day.Max.)

Temp. Diff. between Intake and Sample Discharge Measurement (During Maintenance Activities)

PARM Code 61576 Q Permit 32 Deg F Hourly Calculated Mon. Site No. EFF-2 Requirement (Day.Max.)

Oxidants, Total Residual Sample Measurement PARM Code 34044 1 Permit 0.1 0.1 mg/L Continuous Recorder Mon. Site No. EFF-2 Requirement (Mo.Avg.) (Day.Max.)

Chlorination Duration Sample (Unit 1) Measurement PARM Code 78739 1 Permit 120 min Daily; 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Logs Mon. Site No. EFF-I Requirement (Day.Max.)

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

NAME-TTLE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT TELEPHONE NO DATE (mm/dd/yyyy)

COMMENT AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here):

ISSUANCEfREISSUANCE DATE: March 2012 D-001I Final Monthly Page I of2 DEP Form 62-620.910(10), Effective Nov. 29, 1994

DISCHARGE MONITORING REPORT - PART A (Continued)

FACILITY: St. Lucie Power Plant Units I and 2 MONITORING GROUP D-001 PERMIT NUMBER: FL0002208-011-IW IS NUMBER:

MONITORING PERIOD From: To:

Parameter Quantity or Loading Units Quality or Concentration Units No. Frequency of Sample Type Ex. Analysis Chlorination Duration Sample (Unit 2) Measurement PARM Code 78739 P Permit 120 main Daily; 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Logs Mon. Site No. EFF-l Requirement (Day.Max.)

7-DAY CHRONIC STATRE Sample Mysidopsis bahia (Routine) Measurement PARM Code TRP3E P Permit 100 percent Quarterly 24-hr TPC Mon. Site No. EFF-2 Requirement (Min-)

7-DAY CHRONIC STATRE Sample Mysidopsis bahia (Additional) Measurement PARM Code TRP3E Q Permit 100 percent As needed As required by Mon. Site No. EFF-2 Requirement (Min.) the permit 7-DAY CHRONIC STATRE Sample Mysidopsis bahia (Additional) Measurement PARM Code TRP3E R Permit 100 percent As needed As required by Mon. Site No. EFF-2 Requirement (Min.) the permit 7-DAY CHRONIC STATRE Sample Menidia beryllina (Routine) Measurement PARM Code TRP6B P Permit 100 percent Quarterly 24-hr TPC Mon. Site No. EFF-2 Requirement (_in.)

7-DAY CHRONIC STATRE Sample Menidia beryllina (Additional) Measurement PARM Code TRP6B Q Permit 100 percent As needed As required by Mon. Site No. EFF-2 Requirement (Min.) the permit 7-DAY CHRONIC STATRE Sample Menidia beryllina (Additional) Measurement PARM Code TRP6B R Penrmt 100 percent As needed As required by Mon. Site No. EFF-2 Requirement (Min.) the penrit ISSUANCEIREISSUANCE DATE: March 2012 D-001 Final Monthly Page 2 of 2 DEP Form 62-620.9 10(l 0), Effective Nov. 29, 1994

DEPARTMENT OF ENVIRONMENTAL PROTECTION DISCHARGE MONITORING REPORT - PART A When Completed mail this report to: Department of Environmental Protection, Wastewater Compliance Evaluation Section, MS 3551, 2600 Blair Stone Road, Tallahassee, FL 32399-2400 PERMITTEE NAME: Florida Power & Light (FPL) PERMIT NUMBER: FL0002208-011 -IWIS MAILING ADDRESS: 6501 S. Ocean Drive Jensen Beach, Florida 34957 LIMIT: Final REPORT FREQUENCY: Quarterly CLASS SIZE: MA PROGRAM: Industrial FACILITY: St. Lucie Plant Units 1 and 2 MONITORING GROUP NUMBER- D-001 LOCATION; Hutchinson Island, FL MONITORING GROUP DESCRIPTION: Condenser once-through cooling water and auxiliary equipment cooling water from Units I and 2 to the discharge canal thence the Atlantic Ocean.

RE-SUBMrITED DMR: 5 NO DISCHARGE FROM SITE: I]

COUNTY: St. Lucie MONITORING PERIOD From: To:

OFFICE: Southeast District Parameter Quantity or Loading Units Quality or Concentration Units No. Frequency of Sample Type Ex. Analysis Nitrogen, Ammnonia, Total (as N) Sample Measurement PARMCodeOO610 I Permit Report mg/L Quarterly Grab Mon. Site No. EFF-2 Requirement (Max.)

Nitrogen, Ammonia, Total (as N) Sample Measurement PARM Code 00610 7 Permit Report mg/L Quarterly Grab Mon. Site No. INT-I Requirement (Max.)

Nitrogen, Kjeldahl, Total (as N) Sample Measurement PARM Code 00625 1 Permit Report mg/L Quarterly Grab Mon. Site No. EFF-2 Requirement (Max.)

Nitrogen, Kjeldahl, Total (as N) Sample Measurement PARM Code 00625 7 Permit Report mgfL Quarterly Grab Mon. Site No. INT-1 Requirement (Max).

Nitrite plus Nitrate, Total I det. (as N) Sample Measurement PARM Code 00630 1 Permit Report mg/L Quarterly Grab Mon. Site No. EFF-2 Requirement (Max.)

Nitrite plus Nitrate, Total I det. (as N) Sample Measurement PARM Code 00630 7 Permit Report mg/L Quarterly Grab Mon. Site No. INT-I Requirement (Max.)

Nitrogen, Total Sample Measurement PARM Code 00600 1 Permit Report mg/L Quarterly Grab Mon. Site No. EFF-2 Requirement (Max.) _ I I _ _ _

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

NAME/TITLE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT TELEPHONE NO DATE (mm/dd/yyyy)

COMMENT AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here):

ISSUANCE/REISSUANCE DATE: March 2012 D-001 Final Quarterly Page I of2 DEP Form 62-620.910(10), Effective Nov. 29,1994

DISCHARGE MONITORING REPORT - PART A (Continued)

FACILITY: St. Lucie Power Plant Units 1 and 2 MONITORING GROUP D-00I PERMIT NUMBER: FL0002208-011-1WIS NUMBER:

MONITORING PERIOD From: To:

Parameter Quantity or Loading Units Quality or Concentration Units No. Frequency of Sample Type

_Ex. Analysis Nitrogen, Total Sample Measurement PARM Code 00600 7 Permit Report mg/L Quarterly Grab Mon. Site No. INT- I Requrirement (Max.)

Phosphorus, Total (as P) Sample Measurement PARM Code 00665 1 Permit Report mg/L Quarterly Grab Mon. Site No. EFF-2 Requirement (Max-)

Phosphorus, Total (as P) Sample Measurement PARM Code 00665 7 Permit Report mg/L Quarterly Grab Mon. Site No. INT-I Requirement (Max.)

Phosphate, Ortho (as P04) Sample Measurement PARM Code 00660 1 Permit Report mg/L Quarterly Grab Mon. Site No. EFF-2 Requirement (Max.)

Phosphate, Ortho (as P04) Sample Measurement PARM Code 00660 7 Permit Report mg/L Quarterly Grab Mon. Site No. INT-i Requirement (Max.)

ISSUANCEIREISSUANCE DATE: March 2012 D-001 Final Quarterly Page 2 of 2 DEP Form 62-620.910(10), Effective Nov. 29, 1994

DEPARTMENT OF ENVIRONMENTAL PROTECTION DISCHARGE MONITORING REPORT - PART A When Completed mail this report to: Department of Environmental Protection, Wastewater Compliance Evaluation Section, MS 3551, 2600 Blair Stone Road, Tallahassee, FL 32399-2400 PERMITTEE NAME: Florida Power & Light (FPL) PERMIT NUMBER: FL10002208-01 1-lWIS MAILING ADDRESS: 6501 S. Ocean Drive Jensen Beach, Florida 34957 LIMIT: Final REPORT FREQUENCY: Monthly CLASS SIZE: MA PROGRAM: Industrial FACILITY: St. Lucie Plant Units I and 2 MONITORING GROUP NUMBER: 1-003 LOCATION: Hutchinson Island, FL MONITORING GROUP DESCRIPTION: Liquid radiation waste discharge to the discharge canal to the Atlantic Ocean.

RE-SUBMITITED DMR: []

NO DISCHARGE FROM SITE: E]

COUNTY: St. Lucie MONITORING PERIOD From: To:

OFFICE: Southeast District Parameter Quantity or Loading Units Quality or Concentration Units No. Frequency of Sample Type

__Ex. Analysis Flow Sample Measurement PARM Code 50050 P Permit Report Report MGD Per batch of Calculated Mon. Site No. OUI-I Requirement (Mo.Avg.) (Day.Max.) process Solids, Total Suspended Sample Measurement PARM Code 00530 P Permit 30.0 100.0 mg/L Per batch of Grab Mon. Site No. OUI-1 Requirement (Mo.Avg.) (Day.Max.) process I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

NAME/TITLE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT TELEPHONE NO DATE (mm/dd/yyyy)

COMMENT AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here):

ISSUANCE/REISSUANCE DATE: March 2012 1-003 Final Monthly Page I of I DEP Form 62-620.910(10), Effective Nov. 29,1994

DEPARTMENT OF ENVIRONMENTAL PROTECTION DISCHARGE MONITORING REPORT - PART A When Completed mail this report to: Department of Environmental Protection, Wastewater Compliance Evaluation Section, MS 3551, 2600 Blair Stone Road, Tallahassee. FL 32399-2400 PERMITTEE NAME: Florida Power & Light (FPL) PERMIT NUMBER: FL0002208-0 11-IWIS MAILING ADDRESS: 6501 S. Ocean Drive Jensen Beach, Florida 34957 LIMIT: Final REPORT FRE(?UENCY: Annually CLASS SIZE: MA PROGRAM: Industrial FACILITY: St Lucie Plant Units 1 and 2 MONITORING GROUP NUMBER: 1-003 LOCATION: Hutchinson Island, FL MONITORING GROUP DESCRIPTION: Liquid radiation waste discharge to the discharge to the discharge canal to the Atlantic Ocean.

RE-SUBMITTED DMR: I]

NO DISCHARGE FROM SITE: I]

COUNTY: St. Lucie MONITORING PERIOD From: To:

OFFICE: Southeast District Parameter Quantity or Loading Units Quality or Concentration Units No. Frequency of Sample Type

_Ex. Analysis Oil and Grease Sample Measurement PARM Code 00556 P Permit 15.0 20.0 mg/L Annually Grab Mon. Site No. OUI-1 Requirement (Mo.Avg.) (Day.Max.)

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

NAMETITLE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT TELEPHONE NO DATE (mm/dd/yyyy)

COMMENT AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here):

ISSUANCEIREISSUANCE DATE: March 2012 1-003 Final Annually Page I of I DEP Form 62-620.910(10), Effective Nov. 29, 1994

DEPARTMENT OF ENVIRONMENTAL PROTECTION DISCHARGE MONITORING REPORT - PART A When Completed mail this report to: Department of Environmental Protection, Wastewater Compliance Evaluation Section, MS 3551, 2600 Blair Stone Road, Tallahassee, FL 32399-2400 PERMIITEE NAME: Florida Power & Light (FPL) PERMIT NUMBER: FL0002208-01 I-IWI S MAILING ADDRESS: 6501 S. Ocean Drive Jensen Beach, Florida 34957 LIMIT: Final REPORT FREQUENCY: Monthly CLASS SIZE: MA PROGRAM: Industrial FACILITY: St Lucie Plant Units I and 2 MONITORING GROUP NUMBER: 1-005 LOCATION: Hutchinson Island, FL MONITORING GROUP DESCRIPTION: Steam generator blowdown to the discharge canal to the Atlantic Ocean.

RE-SUBMITFED DMR: 0 NO DISCHARGE FROM SITE: 0l COUNTY: St. Lucie MONITORING PERIOD From: To:

OFFICE: Southeast District Parameter Quantity or Loading Units Quality or Concentration Units No. Frequency of Sample Type Ex. Analysis Flow Sample Measurement PARM Code 50050 P Permit Report Report MGD Weekly, when Calculated Mon. Site No. OUI-2 Requirement (Mo.Avg.) (Day.Max.) discharging Oil and Grease Sample Measurement PARM[Code00556 P Permit 15.0 20.0 mg/L Weekly, when Grab Mon. Site No. OUI-2 Requirement (Mo.Avg.) (Day.Max.) discharging Solids, Total Suspended Sample Measurement PARM Code 00530 P Permit 30.0 100.0 mgfL Weekly, when Grab Mon. Site No. OUI-2 Requirement _(Mo.Avg.) (Day.Max.) discharing Hydrazine Sample Measurement PARM Code 81313 1 Permit 0.30 mg/L Weekly, when Grab Mon. Site No. EFF-2 Requirement (Day.Max.) discharging Carbohydrazide Sample Measurement PARM Code 61916 1 Permit Report mg/(L Weekly, when Grab Mon. Site No. EFF-2 Requirement (Day.Max.) discharging-I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

NAME/TITLE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT TELEPHONE NO DATE (mm/dd/yyyy)

COMMENT AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here):

See Permit Condition I.B.7 for how to calculate the Hydrazine concentration at EFF-2.

2 See Permit Condition I.B.7 for how to calculate the Carbohydrazide concentration at EFF-2.

ISSUANCE(REISSUANCE DATE: March 2012 1-005 Final Monthly Page 1 of I DEP Form 62-620.9 10(10), Effective Nov. 29, 1994

DEPARTMENT OF ENVIRONMENTAL PROTECTION DISCHARGE MONITORING REPORT - PART A When Completed mail this report to: Department of Environmental Protection, Wastewater Compliance Evaluation Section, MS 3551,2600 Blair Stone Road, Tallahassee, FL 32399-2400 PERMITTEE NAME: Florida Power & Light (FPL) PERMIT NUMBER- FL0002208-011-IWIS MAILING ADDRESS: 6501 S. Ocean Drive Jensen Beach, Florida 34957 LIMIT: Final REPORT FREQUENCY: Monthly CLASS SIZE: MA PROGRAM: Industrial FACILITY: St. Lucie Plant Units I and 2 MONITORING GROUP NUMBER: 1-008 LOCATION: Hutchinson Island, FL MONITORING GROUP DESCRIPTION: Evaporation percolation basin-industrial related stormwater to the intake canal.

RE-SUBMITTED DMR: 11 NO DISCHARGE FROM SITE: El COUNTY: St. Lucie MONITORING PERIOD From: To:

OFFICE: Southeast District Parameter Quantity or Loading Units Quality or Concentration Units No. Frequency of Sample Type Ex. Analysis Flow Sample Measurement PARM Code 50050 P Permit Report Report MGD Weekly, when Calculated Mon. Site No. OUI-5 Requirement (Mo.Avg.) (DayMax.) discharging Solids, Total Suspended Sample Measurement PARM Code 00530 P Permit 30.0 100.0 mg/L Weekly, when Grab Mon. Site No. OUI-5 Requirement (Mo.Avg.) (DayMax.) discharging Oil and Grease Sample Measurement PARM Code 00556 P Permit 15.0 20.0 mg/L Weekly, when Grab Mon. Site No. OUI-5 Requirement (Mo.Avg.) (DayMax.) discharging I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

NAME/TITLE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT TELEPHONE NO DATE (mm/dd/yyyy)

COMMENT AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here):

ISSUANCE/REISSUANCE DATE: March 2012 1-008 Final Monthly Page 1 of 1 DEP Form 62-620.9 10(l 0), Effective Nov. 29, 1994

DEPARTMENT OF ENVIRONMENTAL PROTECTION DISCHARGE MONITORING REPORT - PART A When Completed mail this report to: Department of Environmental Protection, Wastewater Compliance Evaluation Section, MS 3551,2600 Blair Stone Road, Tallahassee, FL 32399-2400 PERMIITEE NAME: Florida Power & Light (FPL) PERMIT NUMBER: FL0002208-011 -IWIS MAILING ADDRESS: 6501 S. Ocean Drive Jensen Beach, Florida 34957 LIMIT: Final REPORT FREQUENCY: Annually CLASS SIZE: MA PROGRAM: Industrial FACILITY: St. Lucie Plant Units I and 2 MONITORING GROUP NUMBER: 1-06B LOCATION: Hutchinson Island, FL MONITORING GROUP DESCRIPTION: Former oil storage area industrial related storm water to the intake canal.

RE-SUBMITTED DMR: 0 NO DISCHARGE FROM SITE: []

COUNTY: St. Lucie MONITORING PERIOD From: To:

OFFICE: Southeast District Parameter Quantity or Loading Units Quality or Concentration Units No. Frequency of Sample Type

_Ex. Analysis Flow Sample Measurement PARM Code 50050 P Permit Report Report MGD Annually Calculated Mon. Site No. OUI-3 Requirement (Mo.Avg.) (Day.Max.)

Solids, Total Suspended Sample Measurement PARM Code 00530 P Permit Report mg/L Annually Grab Mon. Site No. OUI-3 Requirement (Day.MaL)

Oil and Grease Sample Measurement PARM Code 00556 P Permit Report mg/L Annually Grab Mon. Site No. OUI-3 Requirement (Day.Max.)

4 4 4 4 4 4-t 4 4 4 4 4 4 4 4 4 4-4 4 4 -5 4 4 4 4 4-4 4 I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

NAME/TITLE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT TELEPHONE NO DATE (mm/dd/yyyy)

COMMENT AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here):

ISSUANCEIREISSUANC13 DATE: March 2012 1-06B Final Annually Page 1 of I DEP Form 62-620.910(10), Effective Nov. 29,1994

DEPARTMENT OF ENVIRONMENTAL PROTECTION DISCHARGE MONITORING REPORT - PART A When Completed mail this report to: Department of Environmental Protection, Wastewater Compliance Evaluation Section, MS 3551, 2600 Blair Stone Road, Tallahassee, FL 32399-2400 PERMITTEE NAME: Florida Power & Light (FPL) PERMIT NUMBER: FL0002208-011-IWIS MAILING ADDRESS: 6501 S. Ocean Drive Jensen Beach, Florida 34957 LIMIT: Final REPORT FREQUENCY: Annually CLASS SIZE: MA PROGRAM: Indu stnal FACILITY: St. Lucie Plant Units I and 2 MONITORING GROUP NUMBER: 1-06C LOCATION: Hutchinson Island, FL MONITORING GROUP DESCRIPTION: Non-industrial related storm water to the Mangrove Impoundment 8E.

RE-SUBMITTED DMR: Q1 NO DISCHARGE FROM SITE: C1 COUNTY: St. Lucie MONITORING PERIOD From: To:

OFFICE: Southeast District Parameter Quantity or Loading Units Quality or Concentration Units No. Frequency of Sample Type Flow Sample Ex. Analysis Flow Sample Measurement PARM Code 50050 P Permit Report Report MGD Annually Calculated Mon. Site No. OUI-4 Requirement (Mo.Avg.) (Day.Max.)

Oil and Grease Sample Measurement PARM Code 00556 P Pernit Report mg/L Annually Grab Mon. Site No. OUI-4 Requirement (Day.Max.)

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

NAME1TrTLE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT SIGNATURE OF PRINCIPAL EXECUTIVE OFFICER OR AUTHORIZED AGENT TELEPHONE NO DATE (mm/dd/yyyy)

COMMENT AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here):

ISSUANCEIREISSUANCE DATE: March 2012 1-06C Final Annually Page 1 of I DEP Form 62-620.9 10(10), Effective Nov. 29, 1994

INSTRUCTIONS FOR COMPLETING THE WASTEWATER DISCHARGE MONITORING REPORT Read these instructions before completing the DMR. Hard copies and/or electronic copies of the required parts of the DMR were provided with the permit. All required information shall be completed in full and typed or printed in ink. A signed, original DMR shall be mailed to the address printed on the DMR by the 281 of the month following the monitoring period. The DMR shall not be submitted before the end of the monitoring period.

The DMR consists of three parts--A. B, and D-all of which may or may not be applicable to every facility. Facilities may have one or more Part As for reporting effluent or reclaimed water data. All domestic wastewater facilities will have a Part B for reporting daily sample results. Part D is used for reporting ground water monitoring well data.

When results are not available, the following codes should be used on parts A and D of the DMR and an explanation provided where appropriate. Note: Codes used on Part B for raw data are different.

CODE DESCRIPTION/INSTRUCTIONS CODE DESCRIPTION/INSTRUCTIONS ANC Analysis not conducted. NOD No discharge from/to site.

DRY Dry Well OPS Operations were shutdown so no sample could be taken.

FLD Flood disaster. OTH Other. Please enter an explanation of why monitoring data were not available.

IFS Insufficient flow for sampling. SEF Sampling equipment failure.

LS Lost sample.

MNR Monitoring not required this period.

When reporting analytical results that fall below a laboratory's reported method detection limits or practical quantification limits, the following instructions should be used:

1. Results greater than or equal to the PQL shall be reported as the measured quantity.
2. Results less than the PQL and greater than or equal to the MDL shall be reported as the laboratory's MDL value. These values shall be deemed equal to the MDL when necessary to calculate an average for that parameter and when determining compliance with permit limits.
3. Results less than the MDL shall be reported by entering a less than sign ("<") followed by the laboratory's MDL value, e.g. < 0.001. A value of one-half the MDL or one-half the effluent limit whichever is lower, shall be used for that sample when necessary to calculate an average for that parameter. Values less than the MDL are considered to demonstrate compliance with an effluent limitation.

PART A -DISCHARGE MONITORING REPORT (DMR)

Part A of the DMR is comprised of one or more sections, each having its own header information. Facility information is preprinted in the header as well as the monitoring group number, whether the limits and monitoring requirements are interim or final, and the required submittal frequency (e.g. monthly, annually, quarterly, etc.). Submit Part A based on the required reporting frequency in the header and the instructions shown in the permit. The following should be completed by the permittee or authorized representative: .

Resubmitted DMR: Check this box if this DMR is being re-submitted because there was information missing from or information that needed correction on a previously submitted DMRI The information that is being revised should be clearly noted on the re-submitted DMR (e.g. highlight, circle, etc.)

No Discharge From Site: Check this box if no discharge occurs and, as a result, there are no data or codes to be entered for all of the parameters on the DMR for the entire monitoring group number; however, if the monitoring group includes other monitoring locations (e.g., influent sampling), the "NOD" code should be used to individually denote those parameters for which there was no discharge.

Monitoring Period: Enter the month, day, and year for the first and last day of the monitoring period (i.e. the month, the quarter, the year, etc.) during which the data on this report were collected and analyzed.

Sample Measurement: Before filling in sample measurements in the table, check to see that the data collected correspond to the limit indicated on the DMR (i.e. interim or final) and that the data correspond to the monitoring group number in the header. Enter the data or calculated results for each parameter on this row in the non-shaded area above the limit. Be sure the result being entered corresponds to the appropriate statistical base code (e.g.

annual average, monthly average, single sample maximum, etc.) and units.

No. Ex.: Enter the number of sample measurements during the monitoring period that exceeded the permit limit for each parameter in the non-shaded area. If none, enter zero.

Frequency of Analysis: The shaded areas in this column contain the minimum number of times the measurement is required to be made according to the permit. Enter the actual number of times the measurement was made in the space above the shaded area.

Sample Type: The shaded areas in this column contain the type of sample (e.g. grab, composite, continuous) required by the permit Enter the actual sample type that was taken in the space above the shaded area.

Signature: This report must be signed in accordance with Rule 62-620.305, F.A.C. Type or print the name and title of the signing official. Include the telephone number where the official may be reached in the event there are questions concerning this report. Enter the date when the report is signed.

Comment and Explanation of Any Violations: Use this area to explain any exceedances, any upset or by-pass events, or other items which require explanation. If more space is needed, reference all attachments in this area.

PART B - DAILY SAMPLE RESULTS Monitoring Period: Enter the month, day, and year for the first and last day of the monitoring period (i.e. the month, the quarter, the year, etc.) during which the data on this report were collected and analyzed.

Daily Monitoring Results: Transfer all analytical data from your facility's laboratory or a contract laboratory's data sheets for all day(s) that samples were collected. Record the data in the units indicated. Table I in Chapter 62-160, F.A.C., contains a complete list of all the data qualifier codes that your laboratory may use when reporting analytical results. However, when transferring numerical results onto Part B of the DMR, only the following data ualifier codes should be used and an explanation provided where appropriate.

CODE DESCRIPTION/INSTRUCTIONS

< The compound was analyzed for but not detected.

A Value reported is the mean (average) of two or more determinations.

J Estimated value, value not accurate.

Q Sample held beyond the actual holding time.

Y Laboratory analysis was from an unpreserved or improperly preserved sample.

To calculate the monthly average, add each reported value to get a total. For flow, divide this total by the number of days in the month. For all other parameters, divide the total by the number of observations.

Plant Staffing: List the name, certificate number, and class of all state certified operators operating the facility during the monitoring period. Use additional sheets as necessary.

PART D - GROUND WATER MONITORING REPORT Monitoring Period: Enter the month, day, and year for the first and last day of the monitoring period (i.e. the month, the quarter, the year, etc.) during which the data on this report were collected and analyzed.

Date Sample Obtained: Enter the date the sample was taken. Also, check whether or not the well was purged before sampling.

Time Sample Obtained: Enter the time the sample was taken.

Sample Measurement: Record the results of the analysis. If the result was below the minimum detection limit indicate that.

Detection Limits: Record the detection limits of the analytical methods used.

Analysis Method: Indicate the analytical method used. Record the method number from Chapter 62-160 or Chapter 62-601, F.A.C., or from other sources.

Sampling Equipment Used: Indicate the procedure used to collect the sample (e.g. airlift, bucket/bailer, centrifugal pump, etc.)

Samples Filtered: Indicate whether the sample obtained was filtered by laboratory (L), filtered in field (F), or unfiltered (N).

Signature: This report must be signed in accordance with Rule 62-620.305, F.A.C. Type or print the name and title of the signing official. Include the telephone number where the official may be reached in the event there are questions concerning this report. Enter the date when the report is signed.

Comments and Explanation: Use this space to make any comments on or explanations of results that are unexpected. If more space is needed, reference all attachments in this area.

SPECIAL INSTRUCTIONS FOR LIMITED WET WEATHER DISCHARGES Flow (Limited Wet Weather Discharge): Enter the measured average flow rate during the period of discharge or divide gallons discharged by duration of discharge (converted into days). Record in million gallons per day (MGD).

Flow (Upstream): Enter the average flow rate in the receiving stream upstream from the point of discharge for the period of discharge. The average flow rate can be calculated based on two measurements; one made at the start and one made at the end of the discharge period. Measurements are to be made at the upstream gauging station described in the permit.

Actual Stream Dilution Ratio: To calculate the Actual Stream Dilution Ratio, divide the average upstream flow rate by the average discharge flow rate. Enter the Actual Stream Dilution Ratio accurate to the nearest 0.1.

No. of Days the SDF > Stream Dilution Ratio: For each day of discharge, compare the minimum Stream Dilution Factor (SDF) from the permit to the calculated Stream Dilution Ratio. On Part B of the DMR, enter an asterisk

(*) if the SDF is greater than the Stream Dilution Ratio on any day of discharge. On Part A of the DMR, add up the days with an "*" and record the total number of days the Stream Dilution Factor was greater than the Stream Dilution Ratio.

CBOD,: Enter the average CBOD5 of the reclaimed water discharged during the period shown in duration of discharge.

TKN: Enter the average TKN of the reclaimed water discharged during the period shown in duration of discharge.

Actual Rainfall: Enter the actual rainfall for each day on Part B. Enter the actual cumulative rainfall to date for this calendar year and the actual total monthly rainfall on Part A. The cumulative rainfall to date for this calendar year is the total amount of rain, in inches, that has been recorded since January 1 of the current year through the month for which this DMR contains data.

Rainfall During Average Rainfall Year: On Part A, enter the total monthly rainfall during the average rainfall year and the cumulative rainfall for the average rainfall year. The cumulative rainfall for the average rainfall year is the amount of rain, in inches, which fell during the average rainfall year from January through the month for which this DMR contains data.

No. of Days LWWD Activated During Calendar Year: Enter the cumulative number of days that the limited wet weather discharge was activated since January 1 of the current year.

Reason for Discharge: Attach to the DMR a brief explanation of the factors contributing to the need to activate the limited wet weather discharge.