L-2010-167, Preparation and Scheduling of Operator License Examinations
| ML102110042 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 07/28/2010 |
| From: | Richard Anderson Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-2010-167, RIS 2010-08 | |
| Download: ML102110042 (2) | |
Text
Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 0
July 28, 2010 FPL L-2010-167 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 NRC Regulatory Issue Summary 2010-08 Preparation And Scheduling of Operator Licensing Examinations On June 28, 2010, NRC issued Regulatory Issue Summary (RIS) 2010-08, Preparation and Scheduling of Operator Licensing Examinations. RIS 2010-08 requests licensees to submit, on a voluntary basis, information pertaining to their proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take operator licensing examinations and the NRC generic fundamentals examinations (GFEs).
The NRC stated that this information would help the NRC to more effectively utilize its resources. A response was requested within 30 days of receipt of RIS 2010-08.
Enclosed please find the completed NRC Form 536, Operator Licensing Examination Data, for St. Lucie Units 1 and 2.
Please contact us if there are any questions regarding this submittal.
Very truly yours, Richard L. Anderson Site Vice President St. Lucie Plant RLA/tlt Enclosure cc/enc: Malcolm T. Widmann, DRS, OB, RII c)eD3 an FPL Group company
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Inormation and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to Impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION ST. LUCIE STATION 1
II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2 013 Cy 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2 0 13 CY 2 0 14 Cy 2015 NUMBER OF REACTOR 8
0 8
0 OPERATORS NUMBER OF SENIOR REACTOR 5
0 5
0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 2
0 2
0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
0 PROPOSED DATES PRIMARY DATE 12/05/2012 09/15/2014 ALTERNATE DATE 12/12/2012 09/22/2014 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
0 15 0
CANDIDATES NRC FORM 536 (10-2008)
PRINTED ON RECYCLED PAPER