L-2002-158, July 2002 Monthly Operating Report for Turkey Point Units 3 and 4
| ML022380329 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/14/2002 |
| From: | Mcelwain J Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, L-2002-158 | |
| Download: ML022380329 (3) | |
Text
AUG 1 4 2002 FPL L-2002-158 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - July 2002 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the July 2002 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
Very truly yo/us, John P.J~Elwain Vice President Turkey Point Plant OIH Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
an FPL Group company
. J DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 8/5/2002 COMPLETED BY: Olga Hanek TELEPHONE: (305) 246-6607 Reporting Period July, 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 __........ _ .......
Maximum Dependable Capacity (MWe-Net) 693 _ _ _
Month Year-to-date Cumulative No. of hours reactor was critical 744 5087 190866.8 No. of hours generator was on line (service hours) 744 5087 188535.5 Unit reserve shutdown hours 0 0 1 121.8 Net Electrical Energy (MWH) 524132 3616048 122759695 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)
E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% for the month of July 2002.
DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 8/5/2002 COMPLETED BY: Olga Hanek TELEPHONE: (305) 246-6607 Reporting Period July, 2002 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 744 4720.2 187689.7 No. of hours generator was on line (service hours) 744 4711.5 183286.6 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 519893 3286504 120391515 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)
N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% for the month of July 2002.
Text
AUG 1 4 2002 FPL L-2002-158 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - July 2002 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the July 2002 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
Very truly yo/us, John P.J~Elwain Vice President Turkey Point Plant OIH Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
an FPL Group company
. J DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 8/5/2002 COMPLETED BY: Olga Hanek TELEPHONE: (305) 246-6607 Reporting Period July, 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 __........ _ .......
Maximum Dependable Capacity (MWe-Net) 693 _ _ _
Month Year-to-date Cumulative No. of hours reactor was critical 744 5087 190866.8 No. of hours generator was on line (service hours) 744 5087 188535.5 Unit reserve shutdown hours 0 0 1 121.8 Net Electrical Energy (MWH) 524132 3616048 122759695 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)
E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% for the month of July 2002.
DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 8/5/2002 COMPLETED BY: Olga Hanek TELEPHONE: (305) 246-6607 Reporting Period July, 2002 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 744 4720.2 187689.7 No. of hours generator was on line (service hours) 744 4711.5 183286.6 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 519893 3286504 120391515 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)
N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% for the month of July 2002.