L-14-227, CFR 72.212(b)(1) 90-Day Notification of Plant First Storage of Spent Fuel

From kanterella
Jump to navigation Jump to search
CFR 72.212(b)(1) 90-Day Notification of Plant First Storage of Spent Fuel
ML14182A542
Person / Time
Site: Beaver Valley, 07201043
Issue date: 07/01/2014
From: Emily Larson
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, NRC/NMSS/SFST
References
L-14-227
Download: ML14182A542 (2)


Text

FENOCTM FirstEnergy Nuclear Operating Company Eric A. Larson Site Vice President July 1, 2014 L-14-227 ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Docket No. 72-1043 1 0 CFR 72.212(b )( 1) 90-Day Notification of Beaver Valley Power Station First Storage of Spent Fuel Beaver Valley Power Station P.O. Box4 Shippingport, PA 15077 724-682-5234 Fax: 724-643-8069 10 CFR 72.212 Pursuant to 10 CFR 72.212(b)(1), FirstEnergy Nuclear Operating Company (FENOC) is required to inform the NRC at least 90 days prior to loading the first spent fuel storage cask at the Beaver Valley Power Station (BVPS). FENOC intends to load the first spent fuel storage cask and begin operations at the BVPS independent spent fuel storage installation (ISFSI) on or about October 6, 2014.

The following information is provided In accordance with 10 CFR 72.212(b)(1):

Licensee Name:

Licensee Address:

FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, Pennsylvania 15077 Reactor License Numbers: DPR-66 (Unit 1), NPF-73 (Unit 2)

Docket Numbers:

50-334 (Unit 1 ), 50-412 (Unit 2),

72-1043 (ISFSI)

Beaver Valley Power Station, Unit Nos. 1 and 2 L-14-227 Page2 There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required concerning the BVPS ISFSI, please contact Kathleen Mcintyre, ISFSI Project Manager, at (440) 251-6158.

Sincerely, Z:ti:t-Eric A. Larson cc:

NRC Region I Administrator NRC Resident Inspector NRC Project Manager Director BRP/DEP Site BRP/DEP Representative