L-13-236, Cover Letter: Beaver Valley, Units 1 and 2 - Response to Order EA-13-112

From kanterella
(Redirected from L-13-236)
Jump to navigation Jump to search
Cover Letter: Beaver Valley, Units 1 and 2 - Response to Order EA-13-112
ML13199A282
Person / Time
Site: Beaver Valley, 07201043
Issue date: 07/15/2013
From: Emily Larson
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, NRC/NMSS/SFST
References
EA-13-112, L-13-236
Download: ML13199A282 (3)


Text

SECURITY RELATED INFORMATION -WITHOLD UNDER 10 CFR 2.390 FENOC Beaver Valley Power Station P.O. Box 4 FirstEnergyNuclear OperatingCompany Shippingport,PA 15077 Eric A. Larson 724-682-5234 Site Vice President Fax: 724-643-8069 July 15, 2013 L-13-236 10 CFR 72.212 10 CFR 50.54 10 CFR 73.55 ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Part 72 Docket No. 72-1043 Response to Order EA-1 3-112 In a letter dated June 26, 2013, the Nuclear Regulatory Commission (NRC) issued Order EA-13-112, which modifies the FirstEnergy Nuclear Operating Company (FENOC) general license for the proposed Independent Spent Fuel Storage Installation (ISFSI) for Beaver Valley Power Station (BVPS). The modification to the general license requires additional security measures for the physical protection of the proposed BVPS ISFSI. FENOC consents to the Order.

Attachment 1 provides the required 20-day response to Order EA-13-112. Since it contains security related information, FENOC requests the NRC to withhold Attachment 1 from disclosure, pursuant to 10 CFR 2.390(a)(1)(i).

Regulatory commitments associated with this submittal are included in Attachment 2.

If there are any questions or if additional information is required, please contact Mr. Brian F. Sepelak, Supervisor - BVPS Site Regulatory Compliance, at (724) 682-4282.

$214ý'

Ný 5 szY SECURITY RELATED INFORMATION When Separated from Attachment 1 Handle This Document as Decontrolled

SECURITY RELATED INFORMATION -WITHOLD UNDER 10 CFR 2.390 Beaver Valley Power Station, Unit Nos. 1 and 2 L-13-236 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on July I ,2013.

Sincerely, Eric A. Larson Attachments:

1. Response to Order EA-13-112 for Beaver Valley Power Station
2. Regulatory Commitment List cc: NRC Region I Administrator NRC Resident Inspector NRC Project Manager Director BRP/DEP Site BRP/DEP Representative Secretary, Office of Secretary of the Commission SECURITY RELATED INFORMATION When Separated from Attachment 1 Handle This Document as Decontrolled

Attachment 2 L-1 3-236 Regulatory Commitment List Page 1 of 1 The following list identifies those actions committed to by FirstEnergy Nuclear Operating Company (FENOC) for the Beaver Valley Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by FENOC.

They are described only as information and are not Regulatory Commitments. Please notify Mr. Brian F. Sepelak, Supervisor - Site Regulatory Compliance, at (724) 682-4282 of any questions regarding this document or associated Regulatory Commitments.

Regulatory Commitment Due Date

1. The Additional Security Measures By June 26, 2014 or 90 days prior to the of Order EA-13-112, Attachment initial BVPS spent fuel cask load, 1 will be implemented as whichever occurs first.

described in FENOC Letter L-1 3-236.

2. FENOC will notify the NRC when By June 26, 2014 or 90 days prior to the it has achieved full compliance initial BVPS spent fuel cask load, with the ASMs set forth in Order whichever occurs first.

EA-13-112, Attachment 1.