POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FsT2 PATRICK NUCLEAR POWER PLANT S
CORBIN A. McNEILL. JH.
P.O. BOX 41 Heudent Manager Lycoming, New York 13093 31s-342 3840 April 8, 1983 SERIAL: JAFP 83-0377 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention: Document Control Desk
Reference:
Docket No. 50-333
Dear Sir:
The Operating Status Report for the month of March, 1983 is enclosed.
The refueling information remains the same as prc'viously submi tted.
Attached also are revised pages for the January, 1983 report submitted on 830203 If there are any questions concerning this report or these revisions, contact John Cook at (315) 342-3840, Ext. 439 Very truly yours, CORBIN A. McNEILL, Jr.
RJC:JPC : l lld Enclosures L
cc:
Internal Distelbution i
s r304140197 830400 PDR ADDCK 05000333 R
PDR j
4 OPERATING DATA REPORT DOCKET NO. 50-333 DATE APRIL 1983 COMPLETED BY J. COOK TELEPilONE (315) 342-3840 OPERATING STATUS
- 1. Unit Name:
F1TZPATRIC K N"I'5
- 2. Reporting Period:
830301 - 830331
- 3. Licenwd Thermal Power (MWt):
2436
- 4. Nameplate Rating (Gross MWe):
003 02I
- 5. Design Electrical Rating (Net MWe):
830
- 6. Maximum Dependable Capacity (Cross MWe):
810
- 7. Masimum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (! ems Number 3 Through 7)Since Last Report,Gise Reasons:
NONE
- 9. Power Lesel To Which Restricted,if Any(Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr.-to Date Cumulatise 744 2160 67297
- 11. Ilours in Reporting Period
- 12. Number Of Ilours Reactor Was Critical 744 1854.5 48110.2
- 13. Reactor Reserve Shutdown llours 0
0 0
- 14. Ilours Generator On Line 744 1824.6 46819.8
- 15. Unit Rewrve Shutdown flours 0
0 0
- 16. Gross Thermal Energy Generated (MWil) 1773912 4176528 97700386
- 17. Gross Electrical Energy Generated (MWill 604130 1413830 33848610
- 18. Net Electrical Energy Generated (MWH) 585485 1369195 32233580
- 19. Unit Service Factor 100.0%
84.5%
69.6%
- 20. Unit Availability Factor 100.0%
84.5%
69.6%
- 21. Unit Capacity Factor (Using MDC Net) 97.2%
78.3%
63.1%
- 22. Unit Capacity Factor (Using DLR Net) 95.9%
77.2%
58.3%
0 15.5%
15.7%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Moxths (Type. Date,and Duration of Each):
Refuel outage scheduled to conynence June.3,1983 lasting approximately 75 days.
t.
- 25. If Shut Down At End Of Repoit, Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior io Commercial Operation):
Forecast Achieved
/
L INisid dCl[ITICALITY INIT1.t k. ELECTklCITY dOMMiRCML dPERATION i
s f
N n
ly.
y 8304140205 530400
- Ds ADocn osooo g
^Q
< 1 gj5
,i,
_-~._.
.~...-..
~.- -
AVER AGE DAILY UNIT POWER LEVEL 4
50-333 DOCKET NO.
UNIT ELIZEAIA1EK__
l DATE APRIL 1983 J. COOK CO\\fPLETED BY T'ELErliONE (315) 342-3840 MARCH 1983 AIONm i
DAY AVER AGE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (htWe Net)
(htWe Net) 768 801 37 i
801 795 2
is 3
801 3,
795 800 800 20 4
f 801 798 5
21 803 797 22 6
802 796 7
23 802 794 24 8
802 25 794 9
802 601 go 26 666 800 27 33 798 28 772 12 803 799 13 29 j
802 801 g4 30 801 801 15 3,
801 16 i
SUMMARY
- The FitzPatrick plant operated at near full thermal power for this operating period with one power reduction for rod sequence exchange.
9 s
9 J
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-333 UNIT N AME F ITZPATR IC K DATE APRIL 1983 REPORT MONTil MARCH 1983 COMPLETED BY J. COOK TELEPilONE (315) 342-3840 f
"i s
tu s S*
e c.
.E _r Licensee cw Cause & Correctne 4
=
,c c
No.
Date g
3g
(
,g g 5 Event 55 E3 Action to f
$3 j5j Report a sN C U
Prevent Recurrence i
6 5
830326 S
0 H
4 N/A N/A N/A Reduced power for rod sequence exchange and scram time testing.
\\
j l
i I
2 3
4 F: Forced Reason:
Method:
Exlubit G Instructions 4
S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee
- c. Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination i
F-Administ rative 5
G Operational Error (Explain)
Exlubii I Same Source 11 Other (Explain) 4 4
l POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT j
i
, NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE MARCH, 1983 4
i j
The unit operated at near full thermal power for this reporting period. On 830326 power was. reduced for rod sequence exchange and l
scram time testing.
1
}
At the end of the reporting period the unit is operating at approximately 801 MWe.
i i
4 i
i 1
1 e
_~ -
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL & MECHANICAL MAINTENANCE
SUMMARY
MARCH 1983 K
OE DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T
'3/29 12 24414 OPS Packing Leak Electrically backseated 1
MOV-15 3/24 71 20092 N/A N/A Opened penetration Junction box for 2
X101E-Technical Services 3/23 76 24355 Speed Diluted Lube Oil Changes Lube Oil - Replaced Fuel Oil 9
P-1 Filter 3/8 88 16260 N/A N/A Inspected crane per MP 17.1 in 20 CR-2 preparation for fuel handling 3/30 23 24421 OPS Packing Leak Electrically backseated 2
MOV-15 m
I
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
l&C MARCH 1983 WORK REOUEST #
DATE SYS TEM HOW DETECTED CAUSE OF RESULTS OF ACTION TAKEN REPAIR COMPONENT #
MALFUNCTION MALFUNCTION TO PRECLUDE TIME RECURRENCE HOURS 3/08 07 21528 OPS Normal wear Broken drive string Replaced drive 4
PR-46B spring, calibrated 3/23 07 21550 OPS Normal wear Broken drive string Replaced drive 4
PR-46D spring, calibrated 3/01 17 21660 OPS Pot R95 worn out Downscale trip Replaced R95, 23 RM-251B came in catibrated 3/01 17 21676 OPS Cold solder joint Source drive won't Resoldered 9
RIS-458B on source drive insert connection 3/11 27 21708 OPS Zero drift Analy'zer reads high Calibrate per 6
02AZ-101A ISP-31 3/14 68 21541 OPS Loose screw on Recorder not Tightened screw, 12 TR-102 print head printing clearly adjusted head 3/08 76 21520 OPS Failed power supply 5upervisory alarm Replaced power 16 Zone 54 is spurious supply 3/17 76 24311 OPS Blown fuse f rom Supervisory alarm Replaced fuse 2
Zone 55 welding nearby won't clear I
OPERATING DATA REPORT 50-333 DOCKET NO.
DATE FEBRUARY 1983 COMPLETED BY J. COOK TELEPilONE h1Gi % 2-3840 OPFRATING STAT'JS
- 1. Unit Name:
F1TZPATRICK Notes
- 2. Reporting Period:
830101 - 830131
- 3. Licenwd Thermal Power (MWI):
2436
- 4. Nameplate Rating (Gross MWe):
003 02I
- 5. Design Electrical Rating (Net MWe):
830
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Masimum Dependable Capacity (Net MWe):
810
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasor s:
NONE
- 9. Power Lesel To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr.-to Date Cumulatise
- 11. Ilours in Reporting Period 744 744 65881
- 12. Number Of Ilours Reactor Was Critical 459.4 459.4 46715.1
- 13. Reactor Reserve Shutdown flours 0
0 0
- 14. Ilours Generator On-Line 434.0 434.0 45449.2
- 15. Unit Reserve Shutdown llours 0
0 0
- 16. Grou Thermal Energy Generated (MWil) 888960 888960 94412818
- 17. Gross Electrical Energy Generated (MWil) 296880 296880 32731660
- 18. Net Electrical Eneigy Generated (MWil) 287015 287015 31151400
- 19. Unit Senice Factor 58.3%
58.3%
69.0%
- 20. Unit Availability Factor 58.3%
58.3%
69.0%
- 21. Unit Capacity Factor (Using MDC Net) 47.6%
47.6%
62.4%
- 22. Unit Capacity Factor (Using DER Net) 47.0%
47.0%
57.6%
- 23. Unit Forced Outige Rate 41.7%
41.7%
16.1%
- 24. Shutdowns Scheauled Over Next 6 Months (Type. Date,and Duration of Each):
Refuel outage scheduled to conunence May 21, 1983 lastina approxirnately 75 days.
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY l
INITIA L ELECTRICITY COMMERCIAL OPER ATION i
AVER AGE DAILY UNIT POWER LEVEL 50-333 DocKu No.
UNIT F i TZ_P_ATEJ CX.
FEBRUARY 1983 DATE CO. f PLETED By J._C00K
\\
(315) 342-3_840 TELEPHONE JANUARY 1983 Af 0NHI DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (stwe. Net}
(bf Wc Net}
794 366 I
37 0
793 18 2
0 790 19 3
4 794 20 n
0 791 21 5
792 0
6 22 556 o
7
,3 131 308 24 a
000 0
25 9
0 655 10 26 0
672 11 27 0
570 12 2s 0
691 13 29 636 0
14 39 107 630 15 3,
563 16 4
SUMMARY
- The FitzPatrick plant operated at near full thermal power during this reporting period with one power reduction for rod sequence exchange, one outage due to opening of the 345 Kv breaker and one outage due to technician error, j
i
a
+d4 A-__-.
e La
- o-W, m
m a
h4 A.
--.-.-w--
-2.-_%--
++A-L.-A-.
A-=
J---L.
4 50-333 UNIT situTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT N AAlE FITZPATRICK DATE FEBRUARY 1983 j
REPORT StONTil JANUARY 1983 C05tPLETED BY J. COOK j
TELEPil0NE (310 142-3840 i
t 1
"s
_c
's ca.::
e e.c
,.c 4 Licensee c *r c4 Cause & Corrective l
.E _=
N".
Dat e 2;
5?
4
.5 s 5 Event 55 El Action to
$. E E
j5j Report a rN G V
Prevent Recurrence C
1 830107 S
0 H
4 N/A N/A N/A Reduced power for rod sequence exchange and scram tirre testing.
4 2
830109 F
144.4 A
3 N/A N/A CKTBRK Unit trip due to 345 KV breaker opening, repaired defective relay.
3 830117 F
165.6 G
3 N/A ID INSTRU Technician error duing calibration of level instrument.
1 t
i 2
3 4
F: Forced Reason:
Method:
Exlubit G Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data
[1 Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4 Other (Explain) 0161) 1 E-Operator Training & Ucense Examination F Administrative 5
G Operational Error (Explain)
Ex!nbis 1 Same Source ll Other (Explain)
O
=-
l 1
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE
' JANUARY, 1983 The unit operated at near full thermal power for the first six days of the reporting period. On 830107 power was reduced for rod sequence exchange and scram time testing.
On 830109 the unit tripped due to opening of the 345 Kv breaker. A defective relay was replaced and the unit returned to service on 830115 On 830117 the unit tripped because of a technician's error while performing reactor vessel level checks.
4 1
At the end of the reporting period the unit is operating at j
approximately 630 MWe.