August 29, 2008

Florida Power and Light Company ATTN: Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT: TURKEY POINT NUCLEAR PLANT - UNITS 3 and 4 TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000250, 05000251/2008009

Dear Mr. Stall:

On August 1, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection at your Turkey Point Nuclear Plant. The enclosed report documents the results of the inspection, which were discussed on July 31, 2008, with Mr. Robert Wright and other members of your staff.

The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commissions rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.

Based on the results of the inspection, no findings of significance were identified.

Enclosure (s) transmitted herewith contains SUNSI. When separated from enclosure(s), this transmittal document is decontrolled. FP&L 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

Sincerely,/RA/ Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Safety Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41

Enclosure:

Inspection Report 05000250, 05000251/2008009(DRS)

w/Attachment:

Supplemental Information FP&L 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

Sincerely,/RA/ Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41

Enclosure:

Inspection Report 05000250, 05000251/2008009

w/Attachment:

Supplemental Information X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER:_________________________ X SUNSI REVIEW COMPLETE /SON/ OFFICE RII:DRP RII:DRP NRR NRR SIGNATURE SON /RA/ JQN /RA/ via email via email NAME SNinh JQuinos DNelson DJohnson DATE 08/28/2008 08/27/2008 08/28/2008 08/28/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: I:\RPB3\TURKEY POINT\REPORTS\2008\TURKEY POINT B5B-08-09 WO ENCL.DOC FP&L 3 cc w/encl William Jefferson, Jr. Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street Florida City, FL 33035 Olga Hanek (Acting) Licensing Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street Florida City, FL 33035 Nick Eggemeyer Security Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street Florida City, FL 33035-1800 FP&L 3 Letter tofrom Marvin D. Sykes dated August 29, 2008

SUBJECT: TURKEY POINT NUCLEAR PLANT - UNITS 3 and 4 TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000250, 05000251/2008009 Distribution w/encl: L. Reyes, RA V. McCree, DRA L. Wert, DRP J. Moorman, DRP (Acting) K. Kennedy, DRS R. Croteau, DRS H. Christensen, DRS M. Sykes, DRP S. Stewart, DRP, Senior Resident Inspector B. Westreich, NSIR E. McNiel, NSIR B. Mozafari, NRR D. Nelson, NRR RIDSNRRDIRS Region II Docket Room (with concurrences ROPreports@