GO2-13-098, Voluntary Response to Regulatory Issue Summary 2013-06
| ML13213A158 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/16/2013 |
| From: | Hettel W Energy Northwest |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GO2-13-098 | |
| Download: ML13213A158 (2) | |
Text
-.
tK ENERGY
_NORHWEST W. Grover Hott.W Columbia Generating Station P.O. Box 968, PE23 Richiand, WA 99352.0968 Ph. 509.377.8311 I F. 509.377.4150 wghettel@energy-northwestcom July 16, 2013 G02-13-0 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 VOLUNTARY RESPONSE TO REGULATORY ISSUE
SUMMARY
2013-06 NRC Regulatory Issue Summary 2013-06, dated June 7, 2013, "Preparation and Scheduling of Operator Licensing Examinations"
Reference:
Dear Sir or Madam:
Please find enclosed the information requested by Regulatory Issue Summary (RIS) 2013-06 referenced above. The information is provided on NRC Form 536. Specifically, the following information is provided:
" The number of examinations that Energy Northwest intends to prepare for calendar years 2015 through 2018.
" The number of initial license applicants to be tested, and proposed and alternate dates of examination for calendar years 2015 through 2018.
" The estimated number of applicants who plan to take the Generic Fundamentals Examination (GFE) in calendar years 2015 and 2016.
No new regulatory commitments are made in this letter. If you require additional information, please contact KP Smart, Manager, Operations Training, at (509) 377-8327.
WG Hettel Vice President, Operations
Enclosure:
NRC Form 356, Operator Licensing Examination Data cc:
w/o enclosure NRC Region IV Administrator NRC NRR Project Manager WA Horin - Winston & Strawn NRC Sr. Resident Inspector - 988C pAW5
I FOpoRMS U.
mvLA LRYofCMI ZpO#4 WPR@YU V =UB: 0o..$1=1 Ewm:
3*WW4 2011)
ENSu bo*. per rmpam to wy wo ft way WwAobn oon toquet i hetr ThWt hkfmm mI'll r I Is~
t~
b 0 bsiijms SW remzixas for OpWSr O RTRUCENS O
w.=m,*oinw s.wmmON*
1,r" bue "*nob a. WorMu Se.im &Nth 0 (T-6 FP3), U $ N.im RPAViy Comwou, WsW, i.
DC 2o56,00o or by ovm a.
EXAINATION DATA w (b n
fl A d,
, a 10 o o.,
sof oim X 2003 ameemm NECO-402O3 1
onfoimronf1dnt wA oIesmyau ly 7
DC 2OI nwl amm*. uW ID may ant Nonwktaorapmr, who a proon is n0 ra anwid FACIUITY RI*O Columbia Generating Station IV Docket# 05000397 A. PROPOSD EXAMINATMON PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
EXAMANATIONS ESTIMATED NUMBER Of NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LCENSE EXAMINATIONS PROPOSED wNMmER CY 2015 CY2016 Cy 2017 CY 2018 NUMBER OF REACTOR OPERATORS 4
6 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 15 to NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE2 2
NUMBER Of SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRWARY DATE 04/27/2015 04/24/2017 ALTERNATE DATE 04/20/2015 04/17/2017 C. PROPOSD GENEJC FUNDAENWAS EXAMINATONFE) SE CY 2015 Cy 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 18 CANDIDATES NRC FORM 536 (00.2011)