ENS 58378
ENS Event | |
|---|---|
13:34 May 30, 2026 | |
| Title | |
| Event Description | The following information was provided by the licensee via phone and email:
This 60-day optional telephone notification is being made in lieu of a licensee event report (LER) as allowed by 10 CFR 50.73(a)(1). This notification is made pursuant to the reporting requirements specified in 10 CFR 50.73(a)(2)(iv)(A) for an invalid actuation of one of the systems listed in 10 CFR 50.73(a)(2)(iv)(B). At approximately 0634 MST on 5/30/2026, Palo Verde Nuclear Generating Station Unit 2 had an invalid actuation of the train 'B' balance of plant engineered safety feature actuation system (BOP ESFAS). This resulted in an auto start of the train 'B' essential chiller, spray pond pump, essential cooling water pump, high pressure safety injection, low pressure safety injection, containment spray, and auxiliary feedwater pump. No valves actuated and the plant remained stable. This event was the result of an invalid BOP ESFAS actuation due to a load sequencer failure. Since the actuation was not initiated in response to actual plant conditions, it was not an intentional manual initiation, and there were no parameters satisfying the requirements for initiation of the systems, this event has been determined to be an invalid actuation. There was no impact on the health and safety of the public or plant personnel. The NRC Resident has been notified. |
| Where | |
|---|---|
| Palo Verde Arizona (NRC Region 4) | |
| Reporting | |
| 10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation | |
| Time - Person (Reporting Time:+1300.12 h54.172 days <br />7.739 weeks <br />1.781 months <br />) | |
| Opened: | Lorraine Weaver 17:41 Jul 23, 2026 |
| NRC Officer: | Brian P. Smith |
| Last Updated: | Jul 23, 2026 |
| 58378 - NRC Website
Loading map... | |
Unit 2 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (100 %) |
WEEKMONTHYEARENS 583782026-05-30T13:34:00030 May 2026 13:34:00
[Table view]10 CFR 50.73(a)(1), Submit an LER Invalid Actuation ENS 559262022-04-12T03:45:00012 April 2022 03:45:00 10 CFR 50.73(a)(1), Submit an LER Invalid System Actuation ENS 550322020-12-11T07:00:00011 December 2020 07:00:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Option Telephonic Notification of an Invalid Specified System Actuation ENS 547012020-03-14T19:44:00014 March 2020 19:44:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of Spray Pond Pump System - 60 Day Reports ENS 524132016-10-17T22:19:00017 October 2016 22:19:00 10 CFR 50.73(a)(1), Submit an LER Invalid Engineered Safety Features Actuation System (Esfas) Signal ENS 522282016-07-12T12:50:00012 July 2016 12:50:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of Both Trains Essential Spray Pond System ENS 498072013-12-12T03:11:00012 December 2013 03:11:00 10 CFR 50.73(a)(1), Submit an LER 60 Day Report for an Invalid Main Steam Line Actuation ENS 486152012-10-26T04:08:00026 October 2012 04:08:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Telephonic Notification for an Invalid Actuation of the Essential Spray Pond System ENS 468982011-04-03T21:44:0003 April 2011 21:44:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Notification of Invalid Start of the 'A' Emergency Diesel Generator ENS 427342006-06-06T01:44:0006 June 2006 01:44:00 10 CFR 50.73(a)(1), Submit an LER Invalid Emergency Diesel Generator Start ENS 418042005-04-29T07:43:00029 April 2005 07:43:00 10 CFR 50.73(a)(1), Submit an LER Invalid System Actuation 2026-05-30T13:34:00 | |