DCL-92-197, Forwards Rev 18 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)
| ML20104B778 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 09/09/1992 |
| From: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| DCL-92-197, NUDOCS 9209160162 | |
| Download: ML20104B778 (1) | |
Text
-,
"isuu 9"'
D-c," v Pacific Gas and Electric Company-se h
' t. : p g c.r t p
- r, 4:m a a 6
>o q;
r, G.
'e September 9, 1992 PG&E Letter No. DCL-92-197 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 5
Re:
Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Revision 18 to the Physical Security Plan Gentlemen:
Enclosures 1, 2, 3, and 4 contain safeguards information regarding changes to the Diablo Ca.nyon Power Plant Physical Security Plan. These changes do not decrease the safeguards effectiveness of the plan and are submitted pursaant to 10 CFR 50.54(p).
l identifies changes that are generic or editorial in nature.
These changes are nal-indicated with revision bars in the left margin. identifies and describes changes made pursuant to 10 CFR 50.54(p).
These changes Atg indicated with revition bars in the l
left margin. provides Revision 18 of the Plan. provides the revised drawings identified in Appendix C of the Plan.
The enclosures contain safeguards information and must be protected against unauthorized disclosure in accordance with 10 CFR 73 21.
I Sincerely, ettt "W Gregory M. Rueger cc:
John B. Martin (2)
Robert J. McDevitt pg Lyman H. Shaffer g
9.)
Ronald G. Todaro
/
k CCC/RMS 1
i SATGUARDS IFORMAI0i 5856S/llK/KAH/1650 When Separated from Enciosures 1Gu0uG sancie tnis occument as oe:ontrone-lb DO O
5 F-