CP-201300227, Transmittal of Electronic Licensing Basis Document (Errata-Updated TRM Revision 84)

From kanterella
Jump to navigation Jump to search
Transmittal of Electronic Licensing Basis Document (Errata-Updated TRM Revision 84)
ML13071A372
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/21/2013
From: Madden F, Flores R
Luminant Power, Luminant Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CP-201300227, TXX-13038
Download: ML13071A372 (3)


Text

Rafael Flores Luminant Power Senior Vice President P 0 Box 1002

& Chief Nuclear Officer 6322 North FM 56 rafael.flores@Luminant.com Glen Rose, TX 76043 Luminant T 254 897 5550 C 817 559 0403 F 254 897 6652 CP-201300227 Log # TXX-13038 February 21, 2013 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT (CPNPP)

DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF ELECTRONIC LICENSING BASIS DOCUMENTS (ERRATA -

UPDATED TRM REVISION 84)

REFERENCE:

1)

Luminant Power Letter logged TXX-13021 from Rafael Flores to the NRC dated February 4, 2013, Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 105

Dear Sir or Madam:

Luminant Generation Company LLC (Luminant Power), the owner of Comanche Peak Nuclear Power Plant Units 1 and 2 (herein referred to as CPNPP), transmitted Amendment 105 to the updated Final Safety Analysis Report (FSAR) by Reference 1. The Technical Requirements Manual (TRM) (Revision 84) included on the CD-ROM (Enclosure 1 of Reference 1) was missing TRM Bases pages B 13.8-1 and B 13.8-

2. The purpose of this letter is to transmit an updated CD-ROM (Enclosure 1 of this letter) which includes the updated TRM Revision 84. All other Licensing Basis Documents (LBDs) included on Enclosure 1 of this letter are identical to those previously transmitted on Enclosure 1 of Reference 1.

The enclosed CD-ROM (Enclosure 1) includes the following Licensing Basis Documents (LBDs) updated through February 4, 2013:

FSAR (Amendment 105)

Technical Specifications Bases (Revision 67) a Technical Requirements Manual (TRM) and TRM Bases (Revision 84) (Errata - Updated to include TRM Bases pages B 13.8-1 and B 13.8-2) 0 Fire Protection Report (FPR) (Revision 29)

This communication contains no new licensing basis commitments regarding CPNPP Units 1 and 2.

A member of the STARS Alliance IZ-C Callaway

  • Comanche Peak - Diablo Canyon
  • Palo Verde
  • San Onofre - South Texas Project
  • Wolf Creek

TXX-13038 Page 2 of 2 02/21/2013 Should you have questions concerning this submittal, please contact R. A. Slough at 254-897-5727, or e-mail at robert.slough@luminant.com.

Sincerely, Luminant Generation Company LLC Rafael Flores By: /Fred W. Madden Director, Oversight & Regulatory Affairs

- CPNPP Units 1 and 2, FSAR Amendment 105 dated February 4, 2013, and other electronic Licensing Basis Documents (Errata - Updated TRM Revision 84) c -

E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak to TXX-13038 Page 1 of 1 02/21/2013 Enclosure I to TXX-13038 One (1) CD Rom is included in this enclosure and is consistent with the NRC Guidance for Electronic Submissions to the Commission. The CD ROM labeled "Enclosure I to TXX-13038, CPNPP Units 1 and 2, FSAR Amendment 105 dated February 4, 2013, and other electronic Licensing Basis Documents (Errata - Updated TRM Revision 84)," contains the following twelve (12) files:

001 FSAR A105 - Text and Tables.pdf, 11,691 Kbytes, publicly available 002 FSAR A105 - Figures - Chapter 01 - 1 of 2.pdf, 24,298 Kbytes publicly available 003 FSAR A105 - Figures - Chapter 01 - 2 of 2.pdf, 24,739 Kbytes, publicly available 004 FSAR A105 - Figures - Chapter 02 - 1 of 2.pdf, 43,547 Kbytes, publicly available 005 FSAR A 105 - Figures - Chapter 02 - 2 of 2.pdf, 39,191 Kbytes, publicly available 006 FSAR A 105 - Figures - Chapter 03 thru 05.pdf, 16,883 Kbytes, publicly available 007 FSAR A105 - Figures - Chapter 06 thru 08.pdf, 11,813 Kbytes, publicly available 008 FSAR A105 - Figures - Chapter 09 thru 10.pdf, 20,274 Kbytes, publicly available 009 FSAR A 105 - Figures - Chapter 11 thru TMI.pdf, 9,716 Kbytes, publicly available 010 TSB - R67.pdf, 1,673 Kbytes, publicly available 011 TRM and Bases - R84.pdf, 840 Kbytes, publicly available 012 FPR - R29.pdf, 2,785 Kbytes, publicly available