BVY 12-054, Response to Regulatory Issue Summary 2012-07

From kanterella
Jump to navigation Jump to search
Response to Regulatory Issue Summary 2012-07
ML12205A006
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/16/2012
From: Wanczyk R
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY 12-054
Download: ML12205A006 (3)


Text

L Entergy Nuclear Operations, Inc.

Vermont Yankee 320 Governor Hunt Road Vernon, VT 05354 Tel 802 257 7711 Robert J. Wanczyk Manager, Licensing BVY 12-054 July 16, 2012 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Response to Regulatory Issue Summary 2012-07 Vermont Yankee Nuclear Power Station Docket No. 50-271 License No. DPR-28

REFERENCE:

(1) Letter, NRC to VY, "NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations,"

dated June 8, 2012

Dear Sir or Madam,

In response to your request for information (Reference 1), Vermont Yankee submits the attached NRC Form 536. Form 536 summarizes our projected site-specific operator licensing examination schedules, as well as the estimated number of applicants forecasted to take operator licensing and the NRC's generic fundamentals examinations.

There are no new regulatory commitments being made in this submittal.

Should you have any questions concerning this submittal, please contact me at (802) 451-3166.

Sincerely,

[RJW/JTM]

Enclosure:

NRC Form 536 (1 page) cc list: next page P03 wfzý-

BVY 12-054 / Page 2 of 2 cc:

William Dean, Region 1 Administrator U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Mr. Donald Jackson, Chief Operator Licensing and Human Resources U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Mr. Richard Guzman, Project Manager U.S. Nuclear Regulatory Commission Mail Stop 0 8 C2A Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee 320 Governor Hunt Road Vernon, Vermont 05354 Ms. Elizabeth Miller, Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09130/2014 (9.211)

Estimated burden per response to comply with this voluntary in aliora n collection request I hour.

This Information coltection Is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mall to Intocotiects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs. NEOB-10202Z (3150-0131), Office of Management and Budget. Washington, DC 20503.

It a means used to impose an information collection does not display a currently valid OMB control number, he NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Vermont Yankee Nuclear Power Station A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY 2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 3

3 0

3 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 NUMBER OF REACTOR 8

6 0

6 OPERATORS NUMBER OF SENIOR REACTOR 6

6 0

6 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 2

2 0

2 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 09/22/2014 12/14/2015 7/10/2017 ALTERNATE DATE 09/29/2014 01/04/2016 7/17/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (9-2011)