B10479, Forwards Revision 2 to Safeguards Contingency Plan.Revision Withheld (Ref 10CFR2.790)

From kanterella
Jump to navigation Jump to search
Forwards Revision 2 to Safeguards Contingency Plan.Revision Withheld (Ref 10CFR2.790)
ML20050C057
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 03/31/1982
From: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
B10479, NUDOCS 8204080075
Download: ML20050C057 (2)


Text

-

.f",

.CONNECTICUT YANKEE ATOMIC POWER COMPANY BERLIN, C O N N ECTIC U T P. o. sox 27o H ARTFORD. CONNECTICUT 08101 March 31, 1982 v.u....

DOCKET NO. 50-213 EM S

q' *3 CT'W iD g

Director of Nuclear Reactor Regulation p.

Atta:

Mr. Dennis M. Crutchfield, Chief gpq ()71982 W K gyygr-na p Operating Reactors Branch #5 U. S. Nuclear Regulatory Commission b

i;.ux t gS E I"*

Washington, DC 20555

References:

(1)

W. G. Counsil letter to D. L ed March 23, 1979.

(2)

D. L. Ziemann letter to W. G. Counsil, dated November 20, 1979.

(3)

W. G. Counsil letter to D. L. Ziemann, dated December 26, 1979.

(4)

D. L. Ziemann letter to W. G. Counsil, dated March 11, 1980.

(5)

W. G. Counsil letter to D. L. Ziemann and R. W. Reid, dated April 28, 1980.

(6)

W. G. Counsil letter to D. M. Crutchfield and R. A. Clark, dated July 1, 1980.

(7)

D. M. Crutchfield letter to W. G. Counsil, dated May 26, 1981.

(8)

W. G. Counsil letter to D. M. Crutchfield and R. A. Clark, dated June 25, 1981.

(9)

W. G. Counsil letter to "

L. Ziemann and R. W. Reid, dated August 15, 1979, ol so5 Gentlemen:

I IIADDAM NECK PLANT SAFEGUARDS CONTINGENCY PLAN Pursuant to 10CFR73.40(b), Connecticut Yankee Atomic Power Company (CYAPCO) submitted Revision 0 to the Safeguards Contingency Plan for the lladdam Neck Plant in Reference (1).

In response to Reference (2),

ATTACHMENT CONTAINS SAFEGUARDS INFORMATION.

UPON SEPARATION TilIS LETTER IS DECONTROLLED SAEGL A1]S E01V' A~~ 0V 8204080075 820331

]

PDR ADOCK 05000213 F

PDR

SAFEGLARDS N 0RMATON

~

~.

~

CYAPCO submitted Revision 1 to the Safeguards Contingency Plan in Re-

.ference (3). Subsequently, additional information primarily regarding the ' contents of Chapter 4~, Responsibility Matrix, of the Safeguards Contingency ~Pla: was-transmitted between the NRC Staff and CYAPCO in References (4) through (8).

CYAPCO hereby submits five (5) copies of Revision 2 to the Safeguards.

Contingency Plan for the Haddam. Neck Plant for review and approval.

This revision incorporates the mutually agreed upon resolution of the concerns identified in References (4) through (8).

Pursuant to 10CFR73.21(b), the Safeguards Contingency Plan is considered I

Safeguards Information, and as such CYAPCO requests the Safeguards. Con-tingency Plan be withheld from public disclosure pursuant to 10CFR2.790(d).

The appropriate. amendment fee required by 10CFR170.22 for NRC Staff re-view and approval of the Sateguards Contingency Plan was submitted in Reference-(9).

. We trust that the attached Safeguards Contingency Plan adequately re-solves all NRC Staff concerns.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY W. G. Counsil Senior Vice President pgggs%FORW0%

4

/ ATTACHMENT CONTAINS SAFEGUARDS INFORMATION.

UPON' SEPARATION THIS LETTER IS DECONTROLLED v

e