AEP-NRC-2019-47, Notification of GW1810102 Non-Compliance for Mercury

From kanterella
Jump to navigation Jump to search
Notification of GW1810102 Non-Compliance for Mercury
ML19281A862
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/03/2019
From: Scarpello M
American Electric Power, Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP-NRC-2019-47
Download: ML19281A862 (7)


Text

m INDIANA MICHIGAN POWER Indiana Michigan Power Cook Nuclear Plant One Cook Place A unit of American Electric Power Bridgman, Ml 49106 lndianaMichiganPower.com October 3, 2019 AEP-NRC-2019-47 10 CFR 50.4 Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

References:

Donald C. Cook Nuclear Plant Units 1 and 2 NOTIFICATION OF GW1810102 NON-COMPLIANCE FOR MERCURY

1. Letter from M. K. Scarpello, Indiana Michigan Power Company (l&M), to U. S. Nuclear Regulatory Commission (NRC) Document Control Desk, "Donald C. Cook Nuclear Plant Units 1 and 2, Notification of GW1810102 Non-Compliance for Mercury,"

AEP-NRC-2019-45, dated August 8, 2019.

2. Letter from M. K. Scarpello, l&M, to U.S. NRC Document Control Desk, "Donald C. Cook Nuclear Plant Units 1 and 2, Notification of GW1810102 Non-Compliance for Mercury,"

AEP-NRC-2019-46, dated August 19, 2019.

Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, is providing a second follow-up notification to the Nuclear Regulatory Commission (NRC) of a Groundwater Permit GW1810102 non-compliance for mercury, in accordance with CNP's Environmental Protection Plan, Section 5.4.2, "Non-routine Reports."

By Reference 1, the NRC was notified that on August 2, 2019, Monitoring Well 1Awas confirmed to be 4.1 ng/1 (0.0041 ug/1) for mercury, which exceeds the permit limit of 1.3 ng/1 (0.0013 ug/1).

By Reference 2, the NRC was notified that on August 5, 2019, Monitoring Well 1A was resampled and, although mercury was showing a decreasing trend, was still above the permit limit of 0.0013ug/l.

The purpose of this letter is to provide a 60-day update, as required by CNP's Groundwater Permit GW1810102, of CNP's evaluation results of this exceedance. Evaluation results determined that based on the understanding of groundwater flow patterns at CNP and the upgradient surface water mercury concentrations, the exceedance is likely due to sources outside of CNPs control. Samples were collected from the Thornton Valley drain, absorption pond, turbine room sump, the sewage plant, Monitoring Well 1A, Monitoring Well 16, and rainwater collected directly into a sample bottle during precipitation events. None of these locations, when sampled, contained mercury concentrations greater than the permit limit. There is no evidence to suggest any impacts to groundwater. Monitoring wells on the property boundary are not exhibiting high mercury levels and the mercury concentration levels never

-EZ3 -

(!!R.

U. S. Nuclear Regulatory Commission AEP-NRC-2019-47 Page 2 exceeded the state's drinking water limits. Corrective actions will include CNP expanding the sampling program to include upgradient and downgradient monitoring wells, surface water in Thornton Valley drain, overflow pond, turbine room sump and the sewage plant. CNP will submit a follow up report to Michigan Department of Environmental, Great Lakes, and Energy by September 29, 2020, with a review of this data.

The notification to the Michigan Department of Environment, Great Lakes, and Energy is provided as an enclosure to this letter.

  • This letter contains no new or revised commitments. Should you have any questions please contact Michael K. McCarthy, Chemistry Manager, at (269) 465-5901, extension 2810.

Sincerely, Michael K. Scarpello Regulatory Affairs Director

Enclosure:

KMH/rdw Letter from M. K. McCarthy, Indiana Michigan Power Company, to J. Klang, Michigan Department of Environment, Great Lakes, and Energy, "American Electric Power Company, Donald C. Cook Nuclear Plant, Groundwater Permit GW1810102," dated September 30, 2019.

c:

R. J. Ancona - MPSC D. A. Kopec - AEP Columbus R. F. Kuntz - NRC Washington D.C.

NRC Resident Inspector, w/o enclosure D. J. Roberts - NRC Region Ill A. J. Williamson -AEP Ft. Wayne

ENCLOSURE TO AEP-NRC-2019-47 Letter from M. K. McCarthy, Indiana Michigan Power Company, to J. Klang, Michigan Department of Environment, Great Lakes, and Energy, "American Electric Power Company, Donald C.

Cook Nuclear

Plant, Groundwater Permit GW1810102,"

dated September 30, 2019.

,.,.,.. INDIANA

.... MICHIGAN POWER' A unit of American Electric Power Ms. Jen Klang Michigan Department of Environment, Great Lakes and Energy 7953 Adobe Road Kalamazoo, MI 49009-5026 September 30, 2019 Re:

American Electric Power Company Donald C. Cook Nuclear Plant Groundwater Permit No. GW1810102

Dear Ms. Klang:

Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 lndianaMichiganPower.com This notification is made pursuant to Cook Nuclear Plant's (CNP) Groundwater Permit GWl 810102, Part 1.11.d Compliance Requirements, and will serve as the 60 day written report to address 1) results of confirmation sampling, 2) an evaluation of the cause for the limit exceedance and the impact to the groundwater, and 3) a proposal detailing steps taken and to be taken to prevent recurrence.

Additionally, two previous letters dated August 8, 2019 and August 19, 2019 have been submitted to your attention to address Part 1.11.b and c of the aforementioned permit.

Background

Analytical results for annual groundwater monitoring were reported to CNP senior environmental specialist on July 30, 2019, and indicated the Total Mercury concentration at downgradient Monitoring Well EWlA (IA) of0.0041 ug/L. This exceeded the permit limit of0.0013 ug/L. The same groundwater sample underwent laboratory analysis a second time on August 2, 2019, to ensure there was not a lab error during the first analytical procedure. The second analytical results confirmed the original exceedance and the noncompliance event was reported, in writing, on August 8, 2019.

The required 14-day resampling event, per permit requirements, occurred at Monitoring Well IA on August 5, 2019, with analytical results reported on August 7, 2019. The result of the resampling for Total Mercury was 0.0030 ug/L which was still above the permit limit. At this point, the CNP environmental team made a plan to continue to sample various locations around the facility property to determine the source of the Monitoring Well IA Total Mercury exceedance. This included sampling of upgradient surface water from the Thornton Valley Drain, the absorption pond, the turbine room sump (outfall OOD), the sewage plant (outfall OOE), Monitoring Well IA, Monitoring Well EW16, and rainwater collected directly into a sample bottle during precipitation events. A summary of the sampling events, locations, and laboratory analytical results can be found in Table 1 on the next page.

Table 1 shows that the outfalls, when sampled in August, did not contain Total Mercury concentrations greater than the permit limit. For example, the Turbine Room Sump (Outfall OOD) was sampled on August 26, 2019 and the laboratory analytical result was 0.00087 ug/L. Outfall OOD outlets into the absorption pond. The absorption pond is designed to overflow into the overflow pond when there is increased flow and/or precipitation causing such an event. During the August 26, 2019 sampling, the absorption pond water was also sampled and the laboratory analytical result for Total Mercury was 0.0027 ug/L. This is more than double the source concentration, Outfall OOD. A precipitation sample was also collected at this time in a decontaminated sampling bottle during a storm event for research purposes. The laboratory

September 30, 2019 NPDES Permit GW1810102 Page2 analytical result for Total Mercury was 0.0038 ug/L, more than four times the Outfall OOD concentration. Based on these laboratory data, precipitation at and hear the site contains Total Mercury concentrations greater than the groundwater permit limit. The precipitation may seep directly into groundwater through percolation and also can collect in surface water bodies and drain to the groundwater (Thornton Valley Drain, Absorption Pond, Overflow Pond).

The absorption pond is designed to outlet into the overflow pond when there is increased flow from Outfall OOD and/or precipitation events. The overflow pond can be assumed to have similar chemistry of the absorption pond, since the absorption pond is a direct source to the overflow pond. The overflow pond is the closest adjacent surface water to Monitoring Well lA. The overflow pond is also unlined, has direct hydraulic connection to the groundwater, and likely has an outward, radial flow pattern to the groundwater. The radial flow pattern of the pond water to the groundwater can be visualized in Attachment 1 which contains the site-wide groundwater elevation contours as developed for the December 2018 Hydrogeologic Review of the Groundwater Protection Program by Environmental Resources Management (ERM).

Table 1 Total Mercury Permit Limit: 0.0013 ug/L 8/12/2019 8/26/2019 7/8/2019 8/5/2019 8/12/2019 Split (Brighton 9/9/2019 Sample ID Location Relative Parameter Results Results Results (Brighton Analytical)

Results to lA (ug/L)

(ug/L)

(ug/L)

Analytical)

Results (ug/L)

Results (ug/L)

(ug/L)

Total EW8 Sidegradient Mercury 0.0013 Total EWl2 S idegradient Mercury

<0.0002 Total EW19 Sidegradient Mercury

<0.0002 Total EWl6 Uogradient Mercury 0.0008 0.00087 Thornton Total Valley Drain Upgradient*

Mercury 0.0027 0.00201 0.00738 Turbine Room Total Sump/ OOD Upgradient**

Mercury 0.00087 0.00057 Absorption Total Pond Uo11radient**

Mercury 0.0020 0.00119 0.00273 Sewage Plant Total

/OOE Un=dient*.*

Mercury 0.0007

<0.0005 0.0007

<0.0005 Total Precipitation Mercurv 0.00386 Total lA Reference Point Mercurv 0.0041 0.0030 0.0037 0.0029 0.00242 0.00168 Total EW13 Down gradient Mercury

<0.0002 Notes:

  • Thornton Valley Drain is downgradient of the furthest upgradient Monitoring Well EWl6.
    • The outfalls and ponds appear downgradient of I A, however significant flow to the unlined ponds likely causes groundwater mounding in the vicinity of IA and creates a radial groundwater flow path from the ponds to the groundwater. The surface water from the absorption pond, overflow pond, and sewage pond likely mix and influence the groundwater at IA, thus they are labeled as upgradient relative to this monitoring well location.

Values in bold are higher than the down11radient groundwater monitoring well permit limit of 0.0013 ug/L.

Additionally, upgradient to the site is a surface water body called Thornton Valley Drain. Thornton Valley Drain was also sampled at the culvert where the stream crosses Livingston Road during the August 26, 2019 sampling event. The Total Mercury concentration was found to be 0.00738 ug/L. This is the highest concentration of Total Mercury recorded around CNP since 2003. The. Thornton Valley Drain surface water elevation is higher than that of the groundwater and therefore can be determined to be supplying the groundwater. It should be noted that the Thornton Valley Drain was sampled after a precipitation event. Monitoring Well EW16 is located further upgradient than the Thornton Valley Drain.

September 30, 2019 NPDES Permit GW1810102 Page 3 Concentrations of Total Mercury up to the permit limit have been recorded in recent history. The most recent sampling event at Monitoring Well EW16 was on September 9, 2019 and the results were received on September 18, 2019 indicating a Total Mercury concentration of 0.00087ug/L. This is consistent with historical values at this groundwater monitoring location.

It should be noted that the Total Mercury concentration at Monitoring Well IA has generally been declining since the July 2019 annual sampling event, there is no evidence at other monitoring points or the downgradient property boundary of any Total Mercury exceedances or trends, and the concentration never exceeded the state's drinking water limit of 2,000 ng/L.

Evaluation of Exceedance and Impact to Groundwater Based on the understanding of groundwater flow patterns at CNP and the upgradient surface water Total Mercury concentration, the e;!(ceedance at Monitoring Well IA is likely due to sources outside of CNP's control. The Total Mercury concentration of 0.00738 ug/L in the surface waters of Thornton Valley Drain, which is upgradient, is a contributing factor to groundwater Total Mercury concentration at CNP.

Property boundary groundwater monitoring wells are not exhibiting high Total Mercury concentrations and there is no evidence to suggest that the Total Mercury exceedance at Monitoring Well IA has caused impacts to neighboring properties.

Proposed Actions In order to continue to investigate and better understand the cause of the Total Mercury exceedance at EWlA, an increased frequency of sampling groundwater monitoring wells and CNP outfalls is being proposed.

CNP proposes an expanded sampling program be instituted that includes Total Mercury analysis during quarterly sampling of upgradient and downgradient Monitoring Wells IA, EW8, EW13, and EW16; surface water in Thornton Valley Drain and overflow pond; and Outfalls OOD and OOE. The existing permit quarterly sampling schedule will be retained and these additional analyses will be added, as well as the additional locations will be sampled only for Total Mercury.

CNP will submit a follow up report by September 29th, 2020 with a review of the collected data. The report will address the conditions as observed today and changes observed throughout the next 12 months. The additional sampling locations data will be provided by laboratory report and summarized in: table form.

If you have any questions, please contact me at (269) 465-5901, ext. 2810.

I certify that, based on information and belief formed after reasonable inquiry, the statements and information contained in this document are true, accurate, and complete.

Sincerely, Michael K McCarthy Chemistry Manager Enc.

c:

MIWATERS

z POPI.ARtN

' I ",,

5t2 i

J.

i

/-*

i '

EW* 16/RP-10

!~ "f 114 i

n

! l I-Q'J -

ZJ legend:

ROS HARrDR

-- Groundwater Bevatlon Contours

  • Interred Groundwall! Conlo\\rs

-+ Groundwater Flow Direction C:.".:J Approximate Property Boundary

  • --- Deep Foomatlon SOURCE:

Monitoring Wei Location:

Plan DWG No. 12-30002-D 9-14-2012 provided by AER Seivice Corp.,

Columbus. OH.

Topographic Map:

U.S. Geological Survey, The Nnonal Map, Topographic Base Map NOTES:

- Groundwater elevations are based on meas11rements colected on April 3, 4, 5, and 17, 2017. and therefore do not fully represent a comprehensive snapshot of Qroundwalef contoUB at DC Cook. However, based on previous understandings of groundwater flow and tidal ftuctuations, the contours and now ines depicted are beleved to adequalely rep<esent shallow groundwater flow across 1he site.

1:7.500 200 *oo

&oo aoo Feet Figure 3 - Site-wide Ground-water Elevation Contours April 2017

~, -

DC Cook Nuclear Plant

~

o Bridgman. Ml ERM !