INDIANA MICHIGAN l'OfNER A unit of American Electric Power August 8, 2019 Docket Nos.: 50-315 50-316 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 lndianaMichiganPower.com AEP-NRC-2019-45 10 CFR 50.4 Donald C. Cook Nuclear Plant Units 1 and 2 NOTIFICATION OF GW1810102 NON-COMPLIANCE FOR MERCURY Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, is providing notification to the Nuclear Regulatory Commission of a Groundwater Permit GW1810102 non-compliance for mercury, in accordance with CNP's Environmental Protection Plan, Section 5.4.2, "Non-routine Reports."
On August 2, 2019, CNP was notified that Monitoring Well 1A was confirmed to be 4.1 ng/1 for mercury, which exceeds the permit limit of 1.3 ng/1 (0.0013 ug/1). A 60 day follow-up letter, as required by Groundwater Permit GW1810102, will provide re-sampling results, an evaluation of the cause of event, and CNP's corrective actions.
The notification to the Michigan Department of Environmental, Great Lakes, and Energy is provided, as an enclosure to this letter.
This letter contains no new or revised commitments. Should you have any questions please contact Michael K. McCarthy, Chemistry Manager, at (269) 465-5901, extension 2810.
l~fktt Michael K. Scarpello Regulatory Affairs Director
Enclosure:
KMH/mll Letter from M. K. McCarthy, Indiana Michigan Power Company, to J. Klang, Michigan Department of Environmental, Great Lakes, and Energy, "American Electric Power, Donald C. Cook Nuclear Plant, Groundwater Permit GW1810102," dated August 8, 2019.
U. S. Nuclear Regulatory Commission Page2 c:
R. J. Ancona - MPSC D.Kopec NRC Resident Inspector, w/o enclosure D. J. Roberts - NRC Region Ill A.J. Williamson - AEP Ft. Wayne AEP-NRC-2019-45
ENCLOSURE TO AEP-NRC-2019-45 Letter from M. K. McCarthy, Indiana Michigan Power Company, to J. Klang, Michigan Department of Environmental, Great Lakes, and Energy, "American Electric Power, Donald C. Cook Nuclear Plant, Groundwater Permit GW1810102," dated August 8, 2019.
~INDIANA
,iiMMICHIGAN POWER" A unit of American Electric Power Ms Jen Klang Michigan Department of Environment, Great Lakes and Energy 7953 Adobe Road Kalamazoo, MI 49009-5026 August 8, 2019 Re:
American Electric Power Company Donald C. Cook Nuclear Plant Groundwater Pennit No. GWI810102
Dear Ms. Klang:
Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, MI 49106 IndianaMichiganPower.com This notification is made pursuant to Cook Nuclear Plant's Groundwater Permit GW1810102, Part I.11.b, Compliance Requirements.
On August 2, 2019, we became aware of a noncompliance for mercury concentration at monitoring well I A. The mercury concentration was confinned to be 4.1 ng/1, which exceeds the permit limit of 1.3 ng/1 (0.0013 ug/1). Well IA is located southeast of the plant's rapid infiltration basin, and is the closest monitoring well to this discharge point.
Upgradient well mercury concentrations ranged from 0.8 to 1.3 ng/1, which likely contributes to the noncompliance issue.- Other downgradient wells in our program are within permit limits for mercury.
As required by Part 1.11.c, we have scheduled a resample of this monitoring well within the next 14 days (due date August 16, 2019).
As required by Part I.11.d, we will submit a written report to the Kalamazoo Office within 60 days ( due date October 1, 2019).
If you have any questions, please contact me at (269) 465-5901, ext. 2810.