AEP-NRC-2017-37, Transmittal of Emergency Plan Revision 38

From kanterella
Jump to navigation Jump to search
Transmittal of Emergency Plan Revision 38
ML17144A342
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/19/2017
From: Scarpello M
AEP Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP-NRC-2017-37
Download: ML17144A342 (1)


Text

m IN DIANA MICHIGAN POWER A unit of American Electric Power May 19, 2017 Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Donald C. Cook Nuclear Plant Units 1 and 2 Transmittal of Emergency Plan Revision 38

Dear Sir or Madam:

Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 Indiana Michigan Power.com AEP-NRC-2017-37 10 CFR 50.4 Pursuant to 1 O CFR 50.4, Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, is transmitting Revision 38 of the CNP Emergency Plan, which became effective on March 31, 2017. CNP has missed the 30 day requirement for submittal to the Nuclear Regulatory Commission and has entered this condition into the CNP Corrective Action

_Program.

There are no new or revised commitments in this letter. Should you have any questions, please contact me at (269) 466-2649.

~:~~

Michael K. Scarpello Regulatory Affairs Manager DMB/kmh

Enclosure:

Emergency Plan c:

R. J. Ancona - MPSC, w/o enclosure MDEQ - RMD/RPS, w/o enclosure NRC Resident Inspector, w/o enclosure C. D. Pederson - NRC Region Ill (CD)

J. K. Rankin....: NRC Washington, DC, w/o enclosure A. J. Williamson -AEP Ft. Wayne, w/o enclosure I