November 2004 Monthly Operating Report for Crystal River Unit 3
ML043520250
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/09/2004
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F1204-01, ITS 5.7.1.2
Download: ML043520250 (3)


Text

Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 December 9, 2004 3F1204-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - November 2004 Monthly Operating Report

Dear Sir:

Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby submits the Crystal River Unit 3 (CR-3) November 2004 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

£ A. Franke Plant General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida. Inc.

Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River. FL 34428 ZA-

APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE December 1, 20 COMPLETED BY J. E. Lane

_,W fAt TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD (Month/Year):

November 2004 MONTH YEAR TO DATE CUMULATIVE 1

DESIGN ELECTRICAL RATING (MWe-Net) 2 MAXIMUM DEPENDABLE CAPACITY (MWe-Net) 860 838 3

NUMBER OF HOURS REACTOR WAS CRITICAL 4

NUMBER OF HOURS THE GENERATOR WAS ON LINE 5

UNIT RESERVE SHUTDOWN HOURS 6

NET ELECTRICAL ENERGY GENERATED (MWH) 720.0 720.0 0.0 620363 7869.0 7841.0 0.0 6665864 173940.3 171568.6 0.0 134514865

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE December 1, 2004 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 X3698 REPORTING PERIOD:

November 2004 No.

Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)

(1)

Shutting S: Scheduled Down (2)

Comments

SUMMARY

Crystal River Unit 3 operated the entire month without an outage.

(I) Reason:

A-EQUIPMENT FAILURE (Explain) 5-MAINTENANCE OR TEST C-REFUELING D-REGULATORY RESTRICTION E4PERATOR TRAINING IUCENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)

H-OTHER (Explain)

(2) Method 1-MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP / SCRAM 4-CONTINUATION S-OTHER (Explain)