Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 December 9, 2004 3F1204-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - November 2004 Monthly Operating Report
Dear Sir:
Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby submits the Crystal River Unit 3 (CR-3) November 2004 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.
If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.
£ A. Franke Plant General Manager JAF/ff Attachment xc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida. Inc.
Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River. FL 34428 ZA-
APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE December 1, 20 COMPLETED BY J. E. Lane
_,W fAt TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD (Month/Year):
November 2004 MONTH YEAR TO DATE CUMULATIVE 1
DESIGN ELECTRICAL RATING (MWe-Net) 2 MAXIMUM DEPENDABLE CAPACITY (MWe-Net) 860 838 3
NUMBER OF HOURS REACTOR WAS CRITICAL 4
NUMBER OF HOURS THE GENERATOR WAS ON LINE 5
UNIT RESERVE SHUTDOWN HOURS 6
NET ELECTRICAL ENERGY GENERATED (MWH) 720.0 720.0 0.0 620363 7869.0 7841.0 0.0 6665864 173940.3 171568.6 0.0 134514865
APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE December 1, 2004 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 X3698 REPORTING PERIOD:
November 2004 No.
Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)
(1)
Shutting S: Scheduled Down (2)
Comments
SUMMARY
Crystal River Unit 3 operated the entire month without an outage.
(I) Reason:
A-EQUIPMENT FAILURE (Explain) 5-MAINTENANCE OR TEST C-REFUELING D-REGULATORY RESTRICTION E4PERATOR TRAINING IUCENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)
H-OTHER (Explain)
(2) Method 1-MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP / SCRAM 4-CONTINUATION S-OTHER (Explain)