.. . - _ _ _ - _ _ _ - _ _ _ - _ _ - _ .

4 Florida Power CORPORATION crysw Fevw una a Dudet Na 50 302 November 16, 1995 3F1195-07 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

Cycle 10 Core Operating Limits Report, Revision 1

Dear Sir:

Florida Power Corporation (FPC) hereby submits the Crystal River Unit 3 (CR-3)

Cycle 10 Core Operating Limits Report (COLR), Revision 1. The revision changes the 2 ft. elevation kw/ft limits. These were changed as part of the resolution of the modelling errors addressed in LER 95-003-00. These changes did not require any changes to existing operational limits due to conservatism in the limits. The COLR and supplements thereto are required to be submitted to the NRC upon issuance in accordance with CR-3 ITS Sections 5.6.2.18.

Sincerely, P. M. Beard, Jr.

Senior Vice President Nuclear Operations PMB/KRW:ff Attachments xc: Regional Administrator, Region II NRR Project Manager Senior Resident Inspector p . <- 1 r, 6' .( b V ',

CHYSTAL RfVER ENERGY COMPtfX: 15760 W Power une St . Crystal River, Florida 3442&6708 . (904) 7956406

^ Florida Progress Company I 9511270201 951116 i PDR ADOCK 05000302 j p PDR