- Crystal River Unit 3 Docket No. s0 302' January-29, 1992 3F0192.
f U.S. Nuclear Regulatory Commission Attention: Document Control Desk-Washington, D.C..
20555-
Subject:
c Reactor Containment Building Integrated Leak Rate Test Report
Dear Sir:
- Attached _please find the Reactor Containment Building-Integrated Leak Rata Test
~
Report; for Crystal ' River Unit 3.
This report is submitted = in accordance with 10 CFR-50,' Appendix J.
The Integrated Leak-Rate Test (ILRT) was. successfully completed,on-zNovember 7,1991. - Conferming to the Appendix J = requirements, this 7-
- report' contains--types A, B: and C. data summaries includirg results-from the type A test performed in-November 1991 and the results of type B and C tests which were performed since:the ILRT conducted in November 1987. Also. included is the analysis
- a'nd. interpretation of the November 1991 ILRT and the results and analysis -of the supplemental verification test which demonstrated the validity of the leakage rate-4 test measurements obtained ;0ther details:are provided for clarity and completeness.
Sincerely, P.1M. Beard, Jr.-
1 Senior'Vice President
- l Nuclear Operations JPMB:LVC-Attachment.
. xc:LRegional. Administrator, Region II
- NRR. Project Manager
-Senior Resident Inspector-I I