3F0192-16, Forwards Reactor Containment Bldg Integrated Leakage Rate Test Rept

From kanterella
Jump to navigation Jump to search
Forwards Reactor Containment Bldg Integrated Leakage Rate Test Rept
ML20092C169
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/29/1992
From: Beard P
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092C174 List:
References
3F0192-16, 3F192-16, NUDOCS 9202110318
Download: ML20092C169 (1)


Text

_

._.m_

ny

%f Oe

!?...

COR PO R AT TON

- Crystal River Unit 3 Docket No. s0 302' January-29, 1992 3F0192.

f U.S. Nuclear Regulatory Commission Attention: Document Control Desk-Washington, D.C..

20555-

Subject:

c Reactor Containment Building Integrated Leak Rate Test Report

Dear Sir:

- Attached _please find the Reactor Containment Building-Integrated Leak Rata Test

~

Report; for Crystal ' River Unit 3.

This report is submitted = in accordance with 10 CFR-50,' Appendix J.

The Integrated Leak-Rate Test (ILRT) was. successfully completed,on-zNovember 7,1991. - Conferming to the Appendix J = requirements, this 7-

report' contains--types A, B: and C. data summaries includirg results-from the type A test performed in-November 1991 and the results of type B and C tests which were performed since:the ILRT conducted in November 1987. Also. included is the analysis
a'nd. interpretation of the November 1991 ILRT and the results and analysis -of the supplemental verification test which demonstrated the validity of the leakage rate-4 test measurements obtained ;0ther details:are provided for clarity and completeness.

Sincerely, P.1M. Beard, Jr.-

1 Senior'Vice President

- l Nuclear Operations JPMB:LVC-Attachment.

. xc:LRegional. Administrator, Region II

NRR. Project Manager

-Senior Resident Inspector-I I

l

]$l*1$$$$$o$00b302 A Florida Progress Company p

PDR.

,., _.. - _. _ -. ~. _., _ -.,. _

-