| | | Reporting criterion |
|---|
| 05000374/LER-1997-001-10, :on 970717,potential for Missing Fuel Was Noted Due to Discovery of Broken Fuel Rod in Plant Sfp.Cause Unknown.Will Assess SNM Procedures,Perform Further Insps & Place Rods in Covered Container |
- on 970717,potential for Missing Fuel Was Noted Due to Discovery of Broken Fuel Rod in Plant Sfp.Cause Unknown.Will Assess SNM Procedures,Perform Further Insps & Place Rods in Covered Container
| |
| 05000373/LER-1997-001-02, :on 970108,special Rept Was Not Written as Required by TS When Loose Parts Monitoring Sys Was Inoperable During Power Operations.Automatic Recording Capability Will Be Installed on Unit Lpms |
- on 970108,special Rept Was Not Written as Required by TS When Loose Parts Monitoring Sys Was Inoperable During Power Operations.Automatic Recording Capability Will Be Installed on Unit Lpms
| 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(1) |
| 05000373/LER-1997-002-01, Submits Solution to Accumulation of Snow on Control Room & Auxiliary Electric Equipment Room Ventilation Sys Filters During Heavy Snow Falls,In Lieu of Suppl LER as Stated in LER 97-002-01 | Submits Solution to Accumulation of Snow on Control Room & Auxiliary Electric Equipment Room Ventilation Sys Filters During Heavy Snow Falls,In Lieu of Suppl LER as Stated in LER 97-002-01 | |
| 05000373/LER-1997-002, :on 970203,main Control Room & Auxiliary Equipment Room Ventilation Sys Was Found Outside of Design Basis.Caused by Inadequate Initial Design.Operating Procedures Will Be Revised |
- on 970203,main Control Room & Auxiliary Equipment Room Ventilation Sys Was Found Outside of Design Basis.Caused by Inadequate Initial Design.Operating Procedures Will Be Revised
| 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000373/LER-1997-002-03, :on 970203,main Control Room & Auxiliary Equipment Room Ventilation Sys Found Outside Design Basis Due to Inadequate Initial Design.Will Perform Analysis to Determine Whether Sys Was Capable of Function |
- on 970203,main Control Room & Auxiliary Equipment Room Ventilation Sys Found Outside Design Basis Due to Inadequate Initial Design.Will Perform Analysis to Determine Whether Sys Was Capable of Function
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000373/LER-1997-003-03, :on 970213,inadequate Procedure for Racking 4.16 Kv Switchgear Breakers Results in Seismically Unqualified Condition Outside Design Basis.Caused by Incomplete Procedures.Procedures Revised |
- on 970213,inadequate Procedure for Racking 4.16 Kv Switchgear Breakers Results in Seismically Unqualified Condition Outside Design Basis.Caused by Incomplete Procedures.Procedures Revised
| 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000373/LER-1997-003, :on 970213,4.16 Kv Switchgear Breakers Were Found to Be Racked in Seismically Unqualified Positions Resulting in Condition Outside Design Basis.Caused by Inadequate Procedure.Walkdown Performed |
- on 970213,4.16 Kv Switchgear Breakers Were Found to Be Racked in Seismically Unqualified Positions Resulting in Condition Outside Design Basis.Caused by Inadequate Procedure.Walkdown Performed
| 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000373/LER-1997-004-02, :on 970214,discovered That Incomplete Understanding of Engineered Safety Features Occurred.Caused by Incomplete Understanding of Verbatim Requirements of Ts. TS Change Submitted |
- on 970214,discovered That Incomplete Understanding of Engineered Safety Features Occurred.Caused by Incomplete Understanding of Verbatim Requirements of Ts. TS Change Submitted
| 10 CFR 50.73(a)(2)(i) |
| 05000373/LER-1997-005, :on 970220,potential Loss of Both Trains of SGTS & Containment Pressure Suppression During First 10 of LOCA Was Noted.Caused by Deficiencies in Original Design Analysis & Procedures.Revised TS 3.6.1.8 |
- on 970220,potential Loss of Both Trains of SGTS & Containment Pressure Suppression During First 10 of LOCA Was Noted.Caused by Deficiencies in Original Design Analysis & Procedures.Revised TS 3.6.1.8
| 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000373/LER-1997-005-04, Forwards LER 97-005-04,IAW 10CFR50.73(a)(2)(ii).Commitments Made by Util,Encl | Forwards LER 97-005-04,IAW 10CFR50.73(a)(2)(ii).Commitments Made by Util,Encl | 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000373/LER-1997-005-02, :on 970220,potential Loss of Both Trains of SGTS & Containment Pressure Suppression During First 10 Seconds of LOCA Noted Due to Deficiencies in Original Design Analysis & Procedures.Design Review Performed |
- on 970220,potential Loss of Both Trains of SGTS & Containment Pressure Suppression During First 10 Seconds of LOCA Noted Due to Deficiencies in Original Design Analysis & Procedures.Design Review Performed
| 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) |
| 05000373/LER-1997-006-01, :on 970221,DG Testing Did Not Meet Surveillance Requirements,Due to Misinterpretation of Tech Specs. Surveillance Procedures for DG LOCA Load Sequence Testing Being Reviewed |
- on 970221,DG Testing Did Not Meet Surveillance Requirements,Due to Misinterpretation of Tech Specs. Surveillance Procedures for DG LOCA Load Sequence Testing Being Reviewed
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) |
| 05000373/LER-1997-007, :on 970225,functional Test of Pressure Switches on Unit 1A RHR Pump Discharge Line Identified as Past Due. Caused by Inadequate Validation & Verification of Instrument Surveillance Program.Program Data Corrected |
- on 970225,functional Test of Pressure Switches on Unit 1A RHR Pump Discharge Line Identified as Past Due. Caused by Inadequate Validation & Verification of Instrument Surveillance Program.Program Data Corrected
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) |
| 05000373/LER-1997-009, :on 970311,determined Lake Level Higher than Max Level Described in Ufsar.Caused by Inadequate Knowledge & Consideration of Design Basis of Max Lake Level.Revised Operating Procedures & Will Review UFSAR |
- on 970311,determined Lake Level Higher than Max Level Described in Ufsar.Caused by Inadequate Knowledge & Consideration of Design Basis of Max Lake Level.Revised Operating Procedures & Will Review UFSAR
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition |
| 05000373/LER-1997-011, :on 970318,source Range Monitor Detector Retract Permit Enabled Lower than Allowed by TS Due to Nonconservative Setpoint in Inadequate Procedure.Setpoint Determination Was Performed |
- on 970318,source Range Monitor Detector Retract Permit Enabled Lower than Allowed by TS Due to Nonconservative Setpoint in Inadequate Procedure.Setpoint Determination Was Performed
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) |
| 05000373/LER-1997-012, :on 970410,low-low Setpoint Function of Ms S/R SRVs Have Not Been Tested IAW TS Sr.Caused by Inadequate Procedure.Procedures Revised to Functionally Test LLS Logic & ADS Logic |
- on 970410,low-low Setpoint Function of Ms S/R SRVs Have Not Been Tested IAW TS Sr.Caused by Inadequate Procedure.Procedures Revised to Functionally Test LLS Logic & ADS Logic
| |
| 05000373/LER-1997-012-01, Forwards LER 97-012-01,being Submitted to NRC IAW 10CFR50.73(a)(2)(i).Commitments,encl | Forwards LER 97-012-01,being Submitted to NRC IAW 10CFR50.73(a)(2)(i).Commitments,encl | 10 CFR 50.73(a)(2) |
| 05000373/LER-1997-013, :on 970320,identified Concern Regarding LaSalle Electrical Surveillance Isolation Logic Sys Functional Test. Caused by Misinterpretation of TS Surveillance Requirement 4.3.2.2.Procedures Revised |
- on 970320,identified Concern Regarding LaSalle Electrical Surveillance Isolation Logic Sys Functional Test. Caused by Misinterpretation of TS Surveillance Requirement 4.3.2.2.Procedures Revised
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) |
| 05000373/LER-1997-014, :on 970415,drywell/SP Vacuum Breaker Isolation Valve Packing Was Not Locally Leak Tested Due to Personnel Error.Evaluation of Primary Containment Penetrations/ Isolation Valves Has Been Completed |
- on 970415,drywell/SP Vacuum Breaker Isolation Valve Packing Was Not Locally Leak Tested Due to Personnel Error.Evaluation of Primary Containment Penetrations/ Isolation Valves Has Been Completed
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2) |
| 05000373/LER-1997-015-01, :on 970430,identified Potential for Diversion of Low Pressure Coolant Injection Flow to Suppression Pool Due to Manual Override Logic.Caused by Inadequate Design. Alerted Personnel of This Condition |
- on 970430,identified Potential for Diversion of Low Pressure Coolant Injection Flow to Suppression Pool Due to Manual Override Logic.Caused by Inadequate Design. Alerted Personnel of This Condition
| |
| 05000373/LER-1997-016, :on 970414,rod Block Monitor Were Not Adequately Functionally Tested as Required by Ts.Caused by Inadequate Procedures.Affected Procedures Will Be Revised & Performed Prior to Plant Restart |
- on 970414,rod Block Monitor Were Not Adequately Functionally Tested as Required by Ts.Caused by Inadequate Procedures.Affected Procedures Will Be Revised & Performed Prior to Plant Restart
| 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(1) |
| 05000373/LER-1997-017, :on 970416,deficiencies Identified in ASME Testing of RHR Pump Sp Spray Flow Using Instruments Were Not Included in Calibration Program Due to Mgt Deficiency.Caused by Change to Sp.Procedure Change Issued |
- on 970416,deficiencies Identified in ASME Testing of RHR Pump Sp Spray Flow Using Instruments Were Not Included in Calibration Program Due to Mgt Deficiency.Caused by Change to Sp.Procedure Change Issued
| |
| 05000373/LER-1997-018, :on 970421,fire Protection Carbon Dioxide Suppression Sys Declared Inoperable.Caused by Human Performance Problems During Initial Const.Fire Watches Immediately Established |
- on 970421,fire Protection Carbon Dioxide Suppression Sys Declared Inoperable.Caused by Human Performance Problems During Initial Const.Fire Watches Immediately Established
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000373/LER-1997-019, :on 970422,post LOCA Hydrogen Analyzers Did Not Monitor to 10% as Stated in Ufsar.Caused by Ineffective Design Control.Declared Containment Hydrogen Analyzers Inoperable & Placed on Degraded Equipment Log |
- on 970422,post LOCA Hydrogen Analyzers Did Not Monitor to 10% as Stated in Ufsar.Caused by Ineffective Design Control.Declared Containment Hydrogen Analyzers Inoperable & Placed on Degraded Equipment Log
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000373/LER-1997-020-01, Forwards LER 97-020-01 IAW 10CFR50.73(a)(2)(i).Attachment a Provides Commitments for Submittal | Forwards LER 97-020-01 IAW 10CFR50.73(a)(2)(i).Attachment a Provides Commitments for Submittal | 10 CFR 50.73(a)(2)(i) |
| 05000373/LER-1997-020, :on 970422,recirculation Flow Converter Calibration & Functional Testing Defciencies Were Determined.Caused by Inadequate Reviews of Test Procedures. Engineering Evaluated Procedure Deficiencies |
- on 970422,recirculation Flow Converter Calibration & Functional Testing Defciencies Were Determined.Caused by Inadequate Reviews of Test Procedures. Engineering Evaluated Procedure Deficiencies
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 05000373/LER-1997-021, :on 970512,undrainable Low Areas in Drywell Floor Resulting in Degradation of Leak Detection Sys Due to Increased Delays in Detection of Unidentified Leakage. Declared Leak Detection Sys Inoperable |
- on 970512,undrainable Low Areas in Drywell Floor Resulting in Degradation of Leak Detection Sys Due to Increased Delays in Detection of Unidentified Leakage. Declared Leak Detection Sys Inoperable
| 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000373/LER-1997-021-02, :on 970512,undrainable Low Areas in Drywell Floor Resulting in Degradation of Lds Due to Increased Delays in Detection of Unidentified Leakage.Caused by Design Specification.Declared Lds Inoperable |
- on 970512,undrainable Low Areas in Drywell Floor Resulting in Degradation of Lds Due to Increased Delays in Detection of Unidentified Leakage.Caused by Design Specification.Declared Lds Inoperable
| 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000373/LER-1997-022, :on 970529,minimum Shift Manning Was Not Met. Caused by Ineffective Tracking of Active License Maintenance Requirements.Proper Criteria Applied to Proficiency Records from First Quarter 1997 |
- on 970529,minimum Shift Manning Was Not Met. Caused by Ineffective Tracking of Active License Maintenance Requirements.Proper Criteria Applied to Proficiency Records from First Quarter 1997
| 10 CFR 50.73(a)(2)(i) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000373/LER-1997-023, :on 970626,inadequate Channel Functional Testing of RPS Was Noted.Caused by Procedure Deficiencies. Revised Procedures & Appropriate Testing Has Been Completed. with |
- on 970626,inadequate Channel Functional Testing of RPS Was Noted.Caused by Procedure Deficiencies. Revised Procedures & Appropriate Testing Has Been Completed. with
| 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(1) |
| 05000373/LER-1997-023-01, :on 970626,identified Inadequate Channel Functional Testing of Rps.Caused by Procedure Deficiencies. Will Revise Surveillance Procedures to Encompass Requirements of Channel Functional Testing & Calibr |
- on 970626,identified Inadequate Channel Functional Testing of Rps.Caused by Procedure Deficiencies. Will Revise Surveillance Procedures to Encompass Requirements of Channel Functional Testing & Calibr
| 10 CFR 50.73(a)(2)(1) |
| 05000373/LER-1997-025, :on 970613,erroneous Determination of RHR Sys Pump Operability Resulted in Operation Outside of TS Requirements Due to Personnel Error.Shift Manager Was Counseled |
- on 970613,erroneous Determination of RHR Sys Pump Operability Resulted in Operation Outside of TS Requirements Due to Personnel Error.Shift Manager Was Counseled
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) |
| 05000373/LER-1997-026, :on 970715,inadequate Channel Functional Testing of RMCS Refueling Interlocks Were Identified.Caused by Procedure Deficiencies.Appropriate Rod Block & Refueling Interlocks Procedures Revised to Satisfy TS |
- on 970715,inadequate Channel Functional Testing of RMCS Refueling Interlocks Were Identified.Caused by Procedure Deficiencies.Appropriate Rod Block & Refueling Interlocks Procedures Revised to Satisfy TS
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(1) |
| 05000373/LER-1997-026-01, :on 970715,inadequate Channel Functional Test of Refueling Interlocks Was Discovered.Caused by Procedural Deficiencies.Procedure to Perform Logic Sys Functional Test on Rod Block Logic Will Be Developed |
- on 970715,inadequate Channel Functional Test of Refueling Interlocks Was Discovered.Caused by Procedural Deficiencies.Procedure to Perform Logic Sys Functional Test on Rod Block Logic Will Be Developed
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2) |
| 05000373/LER-1997-028, :on 970618,missed RHR Sys Increased Frequency Surveillance Resulted in Operation to Be Outside of TS Requirements Due to Personnel Error.Improved Procedures Governing Station Surveillances |
- on 970618,missed RHR Sys Increased Frequency Surveillance Resulted in Operation to Be Outside of TS Requirements Due to Personnel Error.Improved Procedures Governing Station Surveillances
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) |
| 05000373/LER-1997-029, :on 970723,full Scram Signal Generated During Performance of LES-PC-108, Main Steam Isolation Actuation Logic Sys Functional Test. Caused by Poor Mgt Decision to Defer Scheduled Maint.Sspvs Replaced |
- on 970723,full Scram Signal Generated During Performance of LES-PC-108, Main Steam Isolation Actuation Logic Sys Functional Test. Caused by Poor Mgt Decision to Defer Scheduled Maint.Sspvs Replaced
| 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2) |
| 05000373/LER-1997-030-01, :on 970818,containment Integrated Leak Rate Test Error Identified.Caused by Failure to Track Issue to Resolution.Evaluated & Provided NRC W/Justification to Demonstrate Performance of Cilrts W/Channel Vent Plugs |
- on 970818,containment Integrated Leak Rate Test Error Identified.Caused by Failure to Track Issue to Resolution.Evaluated & Provided NRC W/Justification to Demonstrate Performance of Cilrts W/Channel Vent Plugs
| 10 CFR 50.73(a)(2)(1) |
| 05000373/LER-1997-030, :on 970818,containment Integrated Leak Rate Test Error Was Identified.Caused by Failure to Track Issue to Resolution.Prior to Unit 1 Startup,Evaluation of Channel Welds & Plugs Will Be Performed |
- on 970818,containment Integrated Leak Rate Test Error Was Identified.Caused by Failure to Track Issue to Resolution.Prior to Unit 1 Startup,Evaluation of Channel Welds & Plugs Will Be Performed
| 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(1) |
| 05000373/LER-1997-032, :on 970904,failure to Comply W/Ts Action Statement Was Determined.Caused by non-conservative Maintenance Planning.Dg 1A Control Room Frequency Meter Was Replaced |
- on 970904,failure to Comply W/Ts Action Statement Was Determined.Caused by non-conservative Maintenance Planning.Dg 1A Control Room Frequency Meter Was Replaced
| 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(1) |
| 05000373/LER-1997-033-01, Forwards LER 97-033-01,updating Safety Analysis.Commitments Made by Util,Listed | Forwards LER 97-033-01,updating Safety Analysis.Commitments Made by Util,Listed | |
| 05000373/LER-1997-034, :on 971008,determined That Method Used to Satisfy TS 4.8.1.1.2.d.9 for Verifying auto-connected Loads non-conservative.Caused by Misinterpretation of TS Requirement.Loading Calculations Reviewed |
- on 971008,determined That Method Used to Satisfy TS 4.8.1.1.2.d.9 for Verifying auto-connected Loads non-conservative.Caused by Misinterpretation of TS Requirement.Loading Calculations Reviewed
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(1) |
| 05000373/LER-1997-035, :on 971007,channel Calibration of APRM Flow Biased Simulated Thermal power-upscale Did Not Conform with TS Requirements,Due to Misinterpretation of Table Notation. Surveillance Procedures Will Be Revised |
- on 971007,channel Calibration of APRM Flow Biased Simulated Thermal power-upscale Did Not Conform with TS Requirements,Due to Misinterpretation of Table Notation. Surveillance Procedures Will Be Revised
| 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(1) |
| 05000373/LER-1997-036, :on 971014,identified Error in Station Method of Accomplishing Channel Functional Test Requirements of TS 4.8.3.3.1.b.Caused by Personnel Error.Procedure Revised.W/ |
- on 971014,identified Error in Station Method of Accomplishing Channel Functional Test Requirements of TS 4.8.3.3.1.b.Caused by Personnel Error.Procedure Revised.W/
| 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(1) |
| 05000373/LER-1997-037, :on 971105,DG Response Time Was Not Consistent W/Ts.Caused by Inadequate Review of Procedures.All DGs That Are Required to Be Operable at Present Time Have Had Time Delay for RHR Pumps Recalibrated |
- on 971105,DG Response Time Was Not Consistent W/Ts.Caused by Inadequate Review of Procedures.All DGs That Are Required to Be Operable at Present Time Have Had Time Delay for RHR Pumps Recalibrated
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) |
| 05000373/LER-1997-038, :on 971020,inadequate Calibr of HR Instrumentation Was Noted.Caused by Misinterpretation of Ts. Channel Functional Testing Requirements for HR Sys Will Be Corrected Through Procedure Changes |
- on 971020,inadequate Calibr of HR Instrumentation Was Noted.Caused by Misinterpretation of Ts. Channel Functional Testing Requirements for HR Sys Will Be Corrected Through Procedure Changes
| 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(1) |
| 05000373/LER-1997-039-01, Forwards LER 97-039-01 to Update Safety Analyses.New Commitments Listed | Forwards LER 97-039-01 to Update Safety Analyses.New Commitments Listed | |
| 05000373/LER-1997-039, :on 971024,unanalyzed Condition While Removing Ms SRV Was Noted.Caused by Inadequate Procedural Guidance. Analyzed Tailpipe Restraints Including Seismic Loads |
- on 971024,unanalyzed Condition While Removing Ms SRV Was Noted.Caused by Inadequate Procedural Guidance. Analyzed Tailpipe Restraints Including Seismic Loads
| 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000374/LER-1997-039, :on 971024,unanalyzed Condition Resulted from Free End of SRV Discharge Pipes Not Being Analyzed for Seismic Loads.Caused by Inadequate Review Process.Tailpipe Restraints Analyzed.With |
- on 971024,unanalyzed Condition Resulted from Free End of SRV Discharge Pipes Not Being Analyzed for Seismic Loads.Caused by Inadequate Review Process.Tailpipe Restraints Analyzed.With
| 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000373/LER-1997-041, :on 971120,failure to Verify Thermal Limits Prior to Exceeding 25% Power During Unit Startups Prior to 1996 Due to Misinterpretation of TS Requirements.Procedure (LGP-1-1) Will Be Revised |
- on 971120,failure to Verify Thermal Limits Prior to Exceeding 25% Power During Unit Startups Prior to 1996 Due to Misinterpretation of TS Requirements.Procedure (LGP-1-1) Will Be Revised
| 10 CFR 50.73(a)(2)(1) |
| 05000373/LER-1997-042-01, Forwards LER 97-042-01,which Is Being Submitted to NRC Office to Update Safety Analysis.Commitments Made by Ltr, Listed | Forwards LER 97-042-01,which Is Being Submitted to NRC Office to Update Safety Analysis.Commitments Made by Ltr, Listed | |