D ux e.POWE R CO>f PAh"I C p.,
/,7 NC k c c./3c'// '.
Powen Ut:st.Diwo 422 SocTn Curucu Sinzer, CIIAntn
. N. C. 20a42 i<
AN 5 4 * / k,,,,,,,,,,,,,,,,e.
" "((, $,,,[,* ',"' " "'
' December 30, 1981 Straw Pacouctione 373-4083 Mr. J. P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: McGuire Nuclear Station Unit 1 Docket No. 50-369
Dear Mr. O'Reilly:
Please find attached Reportable Occurrence Report R0-369/81-188. This report concerns T.S.6.9.1.12(e), " Failure or malfunction of one or more components which prevents or could prevent, by itself, the fulfillment of the functional requirements of system (s) used to cope with accidents analyzed in the SAR".
This incident was considered to be of no significance with respect to the hea th and safety of the public.
V ry truly yours
/
d.
to o William O. Parker, Jr PBN/jfw Attachment cc: Director Records Center Office of Management and Program Analysis Institute of Nuclear Power Operations U. S. Nuclear Regulatory Commission 1820 Water Place Washington, D. C.
20555 Atlanta, Georgia 30339 Mr. P. R. Bemis
/
c3 Senior-Resident Inspector-NRC g
k McGuire Nuclear Station RECEtVGC 9
S-JAN 111982> }
A Q};a w.a m,.w.u samac e.w:iner a N
h6)
,s
- 4. 6 Y
vgacov.
.eovan og ADOC PDR
[
J
r DUKE POWER COPJANY McGUIRE NUCLEAR STATION REPORTABLE OCCURRENCE REPORT NO.81-188 REPORT DATE: Dece2ber 30, 1981 FACILITY: McGuire Unit 1, Cornelius, NC IDENTIFICATION: Manual Initiate Pushbutton Engineered Safety Features (ESF)
Switches Failed during Periodic Test
INTRODUCTION
On December 12, 1981 "A" train ESF manual initiate switches failed to actuate all of their designed devices during the Engineered Safety Features Actuation Periodic Test.
Initial indications were that when the switches were depressed, some of the contacts changed state while others did not.
Following this failure, the switches were tested at least 30 times with no more failures.
Controlled devices and cables on "A" train were checked and no problems were found. The switches had not been cycled since the ESF functional test was performed almost two years ago.
A recorder was connected to the outputs from the "B" train manual switches in order to check the first cycle responses after the same two years of inactivity.
Failures similar to those found on "A" train were also found on "B" train during the early cycles.
This test (performed December 16) eliminated the possibility of other components in the manual initiate ESF circuitry from causing the problem and centered attention on the switches. After the early cycle failures'the switches worked consistently. During one of the ESF periodic tests some problems were experienced with one of the reset switches, and appeared to be similar-to the initiate switch problems.
There were four initiate switches and three reset switches per ESF train that were involved in the problem. The switch assemblies consisted of E-30 operators and combinations of E30KAL4 and/or E30KAL3 switch blocks made by Cutler Hammer. The E30KAL3 switch blocks consisted of one normally open set of contacts and one nor-mally closed set of contacts. E30KAL4 switch blocks consisted of. two normally open sets of contacts.
There appears to be no correlation between the failures and the switch service.
The train "A" safety injection initiate switch failed but the crain "B" safety injection initiate switch did not.. Voltage and current values for the switches are mostly 48VDC and 38mA or less in this service.
Lumediate corrective action was to declare the switches inoperable on December 16.
This incident is the result of a Component Malfunction / Failure. Unit I was in Mode 5, Cold Shutdown, throughout the incident.
EVALUATION: The contacts on these switches are enclosed but not sealed. They are not normally used; and, when the failures occurred, had not been cycled in almost two years.
Periodic testing, using the defective switches, on December 14 and 18 was conservative in that any switch failures would have shown up in the test results.
l a
r Report No.81-188 Page 2 The ESF switches which fit the low voltage, low current criteria include the four manual initiate switches on both trains (SM isolation, safety. injection, Phase A isolation and Phase B isolation / containment spray) and three of the reset switches on each train (containment spray, Phase A isolation, and Phase B isolation).
CORRECTIVE ACTION
All of the ESF manual initiate and reset switches which have contacts used in low voltage, low current applications are being replaced with new l
switches of the same type. The new switches will be tested before and after in-
)
stallation to insure their operability. The defective switches will be sent to Culter Hammer for examination and analysis.
Further action will depend on the results of the Cutler Hammer testing.
McGuire operators will be informed of the problem and cautioned that multiple cycles of these switches may be required to actuate all of the controlled devices.
Operators will also be advised that in all cases of switch failure, cycling the switch cleared up the problems. Preliminary information from Cutler Hammer indi-cates that a chemical coating may be building up on the contacts, and that the low voltages involved may not be sufficient to ensure current will be established during the early cycles. New switches should correct this problem until a permanent solu-l tion is determined.
SAFETY ANALYSIS
Switch failures occurred only during the early cycles after a long period of inactivity.
If the switches had been needed, the operators could have actuated all of the required devices by repeatedly cycling the defective switches.
No incidents have occurred since fuel loading which required manual actuation of the ESF loads. Health and safety of the public were, therefore, not affected by this incident.
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000369/LER-1981-001, Forwards LER 81-001/03L-0 | Forwards LER 81-001/03L-0 | | | 05000369/LER-1981-001-03, /03L-0:on 810129-0212,several Fire Detection Instruments Were Inoperable for Periods Exceeding 1-h. Caused by Const in Area.Fire Watches & Patrols Established | /03L-0:on 810129-0212,several Fire Detection Instruments Were Inoperable for Periods Exceeding 1-h. Caused by Const in Area.Fire Watches & Patrols Established | | | 05000369/LER-1981-002-01, /01T-0:on 810130,during Test,Vent Valve VX-41 & Containment Isolation Valve XV-40 Found Open to Atmosphere, in Violation of Tech Spec 4.9.4.1.Caused by Lack of Valve Checklist & Lack of Periodic Test.Valves Closed | /01T-0:on 810130,during Test,Vent Valve VX-41 & Containment Isolation Valve XV-40 Found Open to Atmosphere, in Violation of Tech Spec 4.9.4.1.Caused by Lack of Valve Checklist & Lack of Periodic Test.Valves Closed | | | 05000369/LER-1981-002, Forwards LER 81-002/01T-0 | Forwards LER 81-002/01T-0 | | | 05000369/LER-1981-003-03, /03L-0:on 810129,conventional Waste Plant Discharge Flow Monitor Found Inoperable.Caused by Inaccurate Flow Readings Due to Inability of Instrument to Measure Continuous Discharge Flow.New Equipment Ordered | /03L-0:on 810129,conventional Waste Plant Discharge Flow Monitor Found Inoperable.Caused by Inaccurate Flow Readings Due to Inability of Instrument to Measure Continuous Discharge Flow.New Equipment Ordered | | | 05000369/LER-1981-003, Forwards LER 81-003/03L-0 | Forwards LER 81-003/03L-0 | | | 05000369/LER-1981-004-03, /03L-0:on 810129-0212,various Firestops & Fire Doors Found Inoperable for Periods Exceeding 1-h.Caused by Const in & Through Areas Normally Closed Off.Fire Watches & Patrols Established | /03L-0:on 810129-0212,various Firestops & Fire Doors Found Inoperable for Periods Exceeding 1-h.Caused by Const in & Through Areas Normally Closed Off.Fire Watches & Patrols Established | | | 05000369/LER-1981-004, Forwards LER 81-004/03L-0 | Forwards LER 81-004/03L-0 | | | 05000369/LER-1981-005, Forwards LER 81-005/03L-0 | Forwards LER 81-005/03L-0 | | | 05000369/LER-1981-005-03, /03L-0:on 810202,power Supply to Both Excore Range Monitors Was Interrupted.Caused by Maint Personnel Cutting Off Power to Investigate Steam Generator Status Lights & lo-lo Level Alarms.Personnel Instructed | /03L-0:on 810202,power Supply to Both Excore Range Monitors Was Interrupted.Caused by Maint Personnel Cutting Off Power to Investigate Steam Generator Status Lights & lo-lo Level Alarms.Personnel Instructed | | | 05000369/LER-1981-006-03, /03L-0:on 810202,leaking Seal Discovered on RHR Pump.Caused by Improperly Loaded Spring Which Holds Seal Faces Together.Seal Replaced | /03L-0:on 810202,leaking Seal Discovered on RHR Pump.Caused by Improperly Loaded Spring Which Holds Seal Faces Together.Seal Replaced | | | 05000369/LER-1981-006, Forwards LER 81-006/03L-0 | Forwards LER 81-006/03L-0 | | | 05000369/LER-1981-007-03, /03L-0:on 810203,RHR Sys Train a Was Declared Inoperable.Caused by Draining Essential Header to Repair Leaking Valves in Nuclear Svc Water Sys.Valves Repaired & Train a Returned to Svc | /03L-0:on 810203,RHR Sys Train a Was Declared Inoperable.Caused by Draining Essential Header to Repair Leaking Valves in Nuclear Svc Water Sys.Valves Repaired & Train a Returned to Svc | | | 05000369/LER-1981-007, Forwards LER 81-007/03L-0 | Forwards LER 81-007/03L-0 | | | 05000369/LER-1981-008, Forwards LER 81-008/03L-0 | Forwards LER 81-008/03L-0 | | | 05000369/LER-1981-008-03, /03L-0:on 810203,control Area Ventilation Sys Train a Declared Inoperable.Caused by Draining Essential Header to Repair Leaking Valves in Nuclear Svc Water Sys. Valves Repaired & Train a Returned to Svc | /03L-0:on 810203,control Area Ventilation Sys Train a Declared Inoperable.Caused by Draining Essential Header to Repair Leaking Valves in Nuclear Svc Water Sys. Valves Repaired & Train a Returned to Svc | | | 05000369/LER-1981-009-03, /03L-0:on 810205,flow to Reactor Coolant Loops Was Momentarily Lost.Caused by Failure of Throttle Valve to Close Due to Loosening of Nut Holding Linkage to Valve Stem. Linkage Repositioned & Nut Tightened | /03L-0:on 810205,flow to Reactor Coolant Loops Was Momentarily Lost.Caused by Failure of Throttle Valve to Close Due to Loosening of Nut Holding Linkage to Valve Stem. Linkage Repositioned & Nut Tightened | | | 05000369/LER-1981-009, Forwards LER 81-009/03L-0.Detailed Event Analysis Encl | Forwards LER 81-009/03L-0.Detailed Event Analysis Encl | | | 05000369/LER-1981-010, Forwards LER 81-010/03L-0 | Forwards LER 81-010/03L-0 | | | 05000369/LER-1981-010-03, /03L-0:on 810207,total RHR Flow Exceeded Tech Specs.Caused by Air Line Supplying Actuator on RHR Valve Breaking,Allowing Valve to Fail Open.Rhr Flow Reset.Rigid Air Supply Lines to Be Replaced W/Flexible Lines | /03L-0:on 810207,total RHR Flow Exceeded Tech Specs.Caused by Air Line Supplying Actuator on RHR Valve Breaking,Allowing Valve to Fail Open.Rhr Flow Reset.Rigid Air Supply Lines to Be Replaced W/Flexible Lines | | | 05000369/LER-1981-011-03, /03T-0:on 810210,both Pressure Seals on Inner Door of Lower Personnel Air Lock Failed.Caused by Hole in One Seal & Bubble in Other Seal.Seals Replaced & Returned to Manufacturer | /03T-0:on 810210,both Pressure Seals on Inner Door of Lower Personnel Air Lock Failed.Caused by Hole in One Seal & Bubble in Other Seal.Seals Replaced & Returned to Manufacturer | | | 05000369/LER-1981-011, Forwards LER 81-011/03T-0 | Forwards LER 81-011/03T-0 | | | 05000369/LER-1981-012-03, /03T-0:on 801211,isolation Valve NV-250 Found Not Verified Closed Under Administrative Control Per Tech Spec. Caused by Lack of Signoff Step in Daily Surveillance Items. Procedure Change Incorporated | /03T-0:on 801211,isolation Valve NV-250 Found Not Verified Closed Under Administrative Control Per Tech Spec. Caused by Lack of Signoff Step in Daily Surveillance Items. Procedure Change Incorporated | | | 05000369/LER-1981-012, Forwards LER 81-012/03T-0 | Forwards LER 81-012/03T-0 | | | 05000369/LER-1981-013-03, /03L-0:on 810212,radiation Detectors EMF 33,35,36, 37,38,39 & 40 Were Declared Inoperable Due to Loss of Sample Flows.Caused by Individual Nonrelated Failures of Each Emf. Repairs Performed & EMFs Declared Operable | /03L-0:on 810212,radiation Detectors EMF 33,35,36, 37,38,39 & 40 Were Declared Inoperable Due to Loss of Sample Flows.Caused by Individual Nonrelated Failures of Each Emf. Repairs Performed & EMFs Declared Operable | | | 05000369/LER-1981-013, Forwards LER 81-013/03L-0.Detailed Event Analysis Encl | Forwards LER 81-013/03L-0.Detailed Event Analysis Encl | | | 05000369/LER-1981-014, Forwards LER 81-014/03L-0 | Forwards LER 81-014/03L-0 | | | 05000369/LER-1981-014-03, /03L-0:on 810212,while in Mode 6,control Room Received High Groundwater Alarm.Caused by Localized Temporary High Groundwater Level.Proper Surveillance Conducted & Alarm Was Cleared within 2 Days | /03L-0:on 810212,while in Mode 6,control Room Received High Groundwater Alarm.Caused by Localized Temporary High Groundwater Level.Proper Surveillance Conducted & Alarm Was Cleared within 2 Days | | | 05000369/LER-1981-015-03, /03L-0:on 810213,various Firestops & Fire Doors Rendered Inoperable for Periods Exceeding 1-h from 810213-27.Caused by Const in & Through Areas Normally Closed Off.Fire Watches & Patrols Established as Required | /03L-0:on 810213,various Firestops & Fire Doors Rendered Inoperable for Periods Exceeding 1-h from 810213-27.Caused by Const in & Through Areas Normally Closed Off.Fire Watches & Patrols Established as Required | | | 05000369/LER-1981-015, Forwards LER 81-015/03L-0 | Forwards LER 81-015/03L-0 | | | 05000369/LER-1981-016, Forwards LER 81-016/03L-0 | Forwards LER 81-016/03L-0 | | | 05000369/LER-1981-016-03, /03L-0:on 810216,several Firestops Inadvertently Left Open W/O Fire Watches Being Posted.Caused by Omission of Stops from Maint List of Those Requiring Seals.Stops Sealed.Seals Will Be Verified Every 18 Months | /03L-0:on 810216,several Firestops Inadvertently Left Open W/O Fire Watches Being Posted.Caused by Omission of Stops from Maint List of Those Requiring Seals.Stops Sealed.Seals Will Be Verified Every 18 Months | | | 05000369/LER-1981-018, Forwards LER 81-018/03L-0.Detailed Event Analysis Encl | Forwards LER 81-018/03L-0.Detailed Event Analysis Encl | | | 05000369/LER-1981-018-03, /03L-0:on 810219,annunciator Alarm Indicated Loss of Sample Flow on Radiation Monitor 1-EMF-33.Monitor Vacuum Pump Internally Damaged Due to Water Inside Pump.Pump Vanes & Bearings Replaced & Water Removed | /03L-0:on 810219,annunciator Alarm Indicated Loss of Sample Flow on Radiation Monitor 1-EMF-33.Monitor Vacuum Pump Internally Damaged Due to Water Inside Pump.Pump Vanes & Bearings Replaced & Water Removed | | | 05000369/LER-1981-019-01, /01T-0:on 810306,during ESF Testing,Loss of Ac Power Was Experienced on Half of Station Security Sys.Caused by Blown Security Sys Power Inverter Fuse.Security Procedures Changed to Indicate Info Concerning Power Sys | /01T-0:on 810306,during ESF Testing,Loss of Ac Power Was Experienced on Half of Station Security Sys.Caused by Blown Security Sys Power Inverter Fuse.Security Procedures Changed to Indicate Info Concerning Power Sys | | | 05000369/LER-1981-019, Forwards LER 81-019/01T-0 | Forwards LER 81-019/01T-0 | | | 05000369/LER-1981-020, Forwards LER 81-020/03L-0.Detailed Event Analysis Encl | Forwards LER 81-020/03L-0.Detailed Event Analysis Encl | | | 05000369/LER-1981-020-03, /03L-0:on 810219,spurious High Radiation Alarm & Loss of Flow Alarm Sounded in Control Room on EMF-49. Personnel Cleared Radiation Alarm But Overlooked Closed Valve,Causing Loss of Flow Alarm.Monitor Repaired | /03L-0:on 810219,spurious High Radiation Alarm & Loss of Flow Alarm Sounded in Control Room on EMF-49. Personnel Cleared Radiation Alarm But Overlooked Closed Valve,Causing Loss of Flow Alarm.Monitor Repaired | | | 05000369/LER-1981-021, Forwards LER 81-021/03L-0.Detailed Event Analysis Encl | Forwards LER 81-021/03L-0.Detailed Event Analysis Encl | | | 05000369/LER-1981-021-03, /03L-0:on 810226,noble Gas Activity Monitor for Condenser Evacuation Sys EMF-33 Not Functioning.Caused by Excessive Amounts of Condensation in Sample Lines.Moisture Removed.Different Type of Moisture Separator to Be Used | /03L-0:on 810226,noble Gas Activity Monitor for Condenser Evacuation Sys EMF-33 Not Functioning.Caused by Excessive Amounts of Condensation in Sample Lines.Moisture Removed.Different Type of Moisture Separator to Be Used | | | 05000369/LER-1981-022, Forwards LER 81-022/03L-0 | Forwards LER 81-022/03L-0 | | | 05000369/LER-1981-022-03, /03L-0:on 810301-16,various Portions of Fire Detection Sys Inoperable for Periods Exceeding 1-h.Caused by Const in Area.Fire Watches & Patrols Established as Required | /03L-0:on 810301-16,various Portions of Fire Detection Sys Inoperable for Periods Exceeding 1-h.Caused by Const in Area.Fire Watches & Patrols Established as Required | | | 05000369/LER-1981-023-03, /03L-0:on 810227-0313,various Firestops & Fire Doors Inoperable for Periods Exceeding 1-h.Caused by Const in & Through Areas Normally Closed Off.Fire Watches & Patrol Established as Required | /03L-0:on 810227-0313,various Firestops & Fire Doors Inoperable for Periods Exceeding 1-h.Caused by Const in & Through Areas Normally Closed Off.Fire Watches & Patrol Established as Required | | | 05000369/LER-1981-023, Forwards LER 81-023/03L-0 | Forwards LER 81-023/03L-0 | | | 05000369/LER-1981-024, Forwards LER 81-024/01T-0 | Forwards LER 81-024/01T-0 | | | 05000369/LER-1981-024-01, /01T-0:on 810316,Unit 1 Wedge Plates Discovered to Be Smaller than Required Size.Cause Not Stated.Calculations Reviewed to Determine Acceptance.Corrective Action Deemed Necessary.Bar Along Length of Washer Plate Added | /01T-0:on 810316,Unit 1 Wedge Plates Discovered to Be Smaller than Required Size.Cause Not Stated.Calculations Reviewed to Determine Acceptance.Corrective Action Deemed Necessary.Bar Along Length of Washer Plate Added | | | 05000369/LER-1981-025-01, /01T-0:on 810319,no Seismic Bracing or Calculations Found for 12 Reactor Bldg safety-related Electrical Cable Tray Hanger Stds.Cause Not Stated.Seismic Calculations Performed on Affected Hangers | /01T-0:on 810319,no Seismic Bracing or Calculations Found for 12 Reactor Bldg safety-related Electrical Cable Tray Hanger Stds.Cause Not Stated.Seismic Calculations Performed on Affected Hangers | | | 05000369/LER-1981-025, Forwards LER 81-025/01T-0 | Forwards LER 81-025/01T-0 | | | 05000369/LER-1981-026-03, /03L-0:on 810305,EMF Sys Panel Alarm in Control Room Indicated Malfunction of EMF-43A.Alarm Could Not Be Cleared & Control Room Outside Air Intake Gaseous Activity Monitor Inoperable.Caused by Broken Bnc Jack | /03L-0:on 810305,EMF Sys Panel Alarm in Control Room Indicated Malfunction of EMF-43A.Alarm Could Not Be Cleared & Control Room Outside Air Intake Gaseous Activity Monitor Inoperable.Caused by Broken Bnc Jack | | | 05000369/LER-1981-026, Forwards LER 81-026/03L-0.Detailed Event Analysis Encl | Forwards LER 81-026/03L-0.Detailed Event Analysis Encl | |
|