C Portland General Electric Company November 5, 1982 Trojan Nuclear Plant CPY-844-82 P.O. Box 439 Rainier, Oregon 97048 (503)556-3713 i
Mr. R. H. Engelken Regional Administrator - Region V US Nuclear Regulatory Commission 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368
Dear Sir:
In accordance with the Trojan Plant Operating License, Appendix A, USNRC Technical Specifications 6.9.1.9.c, Licensee Event Report No. 82-19 concerning the lack of valve position control of service water valves supplying the lubrication oil coolers of ESF equipment is attached.
Sincerely, C. P f undt, General Manager R. L.'Steele, Manager Nuclear Projects Engineering CPY/GGB/FJU:ga Attachments c:
LER Distribution File 93.24a (Q)
Q
~
E!
5
!E G
11 8 e
o<
G 2
@~
,=
c.a to
[ 8211180189 821105
- PDR ADOCK 05000344 S
PDR g g -J 3. -
p..
REPORTABLE OCCURRENCE 1.
Report No:
82-19 2.
Report Date:
November 5,.1982 3.
Occurrence Date:
October.7, 1982 4.
Facility: Trojan Nuclear Plant, PO Box 439, Rainier,. Oregon 97048 5.
Identification of Occurrence:
Technical. Specification 4.7.4.1. requires each service water valve servicing safety-related systems to be either locked open or have its
. position verified every 31. days.- During a Quality Assurance audit which was performed on October 7,1982 the. service water supply valves to the safety injection (SI) and centrifugal charging pump (CCP) lube oil coolers were found not to be on the locked valve list. Further investigation identified these same valves as not having locking de-vices nor having their position verified every 31 days.
6.
Conditions Prior to Occurrence:
The Plant was operating in Mode 1 at 100% power when the deficiency-was discovered.
7.
Description of Occurrence:
The eight service water valves (pump skid mounted) to the SI pump and CCP lube oil coolers are required to be controlled as locked open or the valve position verified every 31 days in accordance with Trojan Technical Specification 4.7.4.1.
During a routine audit it was found that in addition to isolation valves for each service line to'the.
safety injection and centrifugal charging pumps, there are also indivi-dual isolation valves on each pump skid which are not shown on Trojan piping and instrument diagrams. As such, the valves were not on the locked valve list (AO-3-13) nor were they provided with locking devices, and the valve positions were not verified every-31 days.
8.
Designation of Apparent Cause of Occurrence:
The service water valves supplying the safety injection and charging pump lube oil coolers were not shown on the piping'and instrument diagrams (P& ids) which were used to determine valves to be included in the locked valve' list. As the valves were not shown in the'P&ID, they were not included in the periodic verification of valve position re-quired by the Technical Specifications.
9.
Significance of occurrence:
This occurrence had no effect on plant or public safety. The valves were already open and they were immediately tagged to remain in the open position. They have now been added to the locked valve list to ensure adequate control'in accordance with the~ Trojan Technical Specs.
r s.
Reportable Occurrence-Page Two'
- - 10.
Corrective Ar ilon:
Immediate corrective action was taken to perform the required surveil-lance testing. The service water valves.were tagged in the open position and added to 'the -locked valve ' list. ' Subsequent corrective action taken was to. install locking devices on the valves. A survey-of-other skid mounted safety-related pumps will be completed by December 31, 1992 to ' determine ~if other similar discrepancies exist.
g
. t
%,a*1%
1 l'
e
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000344/LER-1982-001-01, /01L-0:on 820118,discovered That Emergency Diesel Generator 2 Effectively Inoperable When 120-volt Ac Perferred Instrument Buses Y22 or Y24 Are Powered from Nonpreferred Instrument Bus Y02 | /01L-0:on 820118,discovered That Emergency Diesel Generator 2 Effectively Inoperable When 120-volt Ac Perferred Instrument Buses Y22 or Y24 Are Powered from Nonpreferred Instrument Bus Y02 | | | 05000344/LER-1982-001, Updated LER 82-001/01T-1:on 820118,engineering Investigation Discovered That Emergency Diesel Generator 2 Become Inoperable from 811201-820104 Due to Powering of Instrument Buses Y24 from Nonpreferred Bus Y02 | Updated LER 82-001/01T-1:on 820118,engineering Investigation Discovered That Emergency Diesel Generator 2 Become Inoperable from 811201-820104 Due to Powering of Instrument Buses Y24 from Nonpreferred Bus Y02 | | | 05000344/LER-1982-002-03, /03L-0:on 820109,following Reactor Trip,Both Source Instrumentation Channels Failed to Energize.Caused by Improper Actuation of Instrument Crowbar Circuit.Channels Energized When Power Fuses Were Removed & Reinserted | /03L-0:on 820109,following Reactor Trip,Both Source Instrumentation Channels Failed to Energize.Caused by Improper Actuation of Instrument Crowbar Circuit.Channels Energized When Power Fuses Were Removed & Reinserted | | | 05000344/LER-1982-002, Forwards LER 82-002/03L-0.Detailed Event Analysis Encl | Forwards LER 82-002/03L-0.Detailed Event Analysis Encl | | | 05000344/LER-1982-003-03, /03L-0:on 820106,personnel Noted Noisy Pump & Low Flow Through Process Radiation monitor-1 Pump (PRM-1). Caused by Thrown Vane within Sealed Pump Unit.Pump Replaced & Sys Returned to Normal Operation | /03L-0:on 820106,personnel Noted Noisy Pump & Low Flow Through Process Radiation monitor-1 Pump (PRM-1). Caused by Thrown Vane within Sealed Pump Unit.Pump Replaced & Sys Returned to Normal Operation | | | 05000344/LER-1982-003, Forwards LER 82-003/03L-0.Detailed Event Analysis Encl | Forwards LER 82-003/03L-0.Detailed Event Analysis Encl | | | 05000344/LER-1982-004-03, /03L-0:on 820302,B Train Containment Spray & Centrifugal Charging Pump Control Switches Were Left in Pull Lock After Surveillance Testing of DBA Sequencer.Caused by Personnel Error | /03L-0:on 820302,B Train Containment Spray & Centrifugal Charging Pump Control Switches Were Left in Pull Lock After Surveillance Testing of DBA Sequencer.Caused by Personnel Error | | | 05000344/LER-1982-004, Forwards LER 82-004/03L-0.Detailed Event Analysis Encl | Forwards LER 82-004/03L-0.Detailed Event Analysis Encl | | | 05000344/LER-1982-005, Forwards LER 82-005/03L-0.Detailed Event Analysis Encl | Forwards LER 82-005/03L-0.Detailed Event Analysis Encl | | | 05000344/LER-1982-005-03, /03L-0:on 820331,failure to Perform Component Cooling Water Valve Cycling at Required Frequency Discovered.Caused by Personnel Error.Schedule Corrected | /03L-0:on 820331,failure to Perform Component Cooling Water Valve Cycling at Required Frequency Discovered.Caused by Personnel Error.Schedule Corrected | | | 05000344/LER-1982-006, Forwards LER 82-006/01T-0.Detailed Event Analysis Encl | Forwards LER 82-006/01T-0.Detailed Event Analysis Encl | | | 05000344/LER-1982-006-01, /01T-0:on 820426,17 Fuel Assemblies Found to Have Abnormal Clad Degradation.Caused by Water Jet Impingement & Induced Vibration on Fuel Rods.Fuel Assemblies Modified Using Stainless Steel Pins | /01T-0:on 820426,17 Fuel Assemblies Found to Have Abnormal Clad Degradation.Caused by Water Jet Impingement & Induced Vibration on Fuel Rods.Fuel Assemblies Modified Using Stainless Steel Pins | | | 05000344/LER-1982-007, Updated LER 82-007/01T-0:on 820514,during Review of Revised Containment DBA Analysis,Nonconservative Spray Modeling Error Identified in Model Used to Justify Tech Spec 3.6.1.4 Re Max Positive Containment Operating Pressure | Updated LER 82-007/01T-0:on 820514,during Review of Revised Containment DBA Analysis,Nonconservative Spray Modeling Error Identified in Model Used to Justify Tech Spec 3.6.1.4 Re Max Positive Containment Operating Pressure | | | 05000344/LER-1982-008-03, /03L-0:on 820424,battery Charger D23 in 125-volt Dc Sys Failed to Pass Annual Performance Test.Caused by Random Failure of Diode in Circuitry.Diode Replaced & Test Completed Successfully | /03L-0:on 820424,battery Charger D23 in 125-volt Dc Sys Failed to Pass Annual Performance Test.Caused by Random Failure of Diode in Circuitry.Diode Replaced & Test Completed Successfully | | | 05000344/LER-1982-008, Forwards LER 82-008/03L-0.Detailed Event Analysis Encl | Forwards LER 82-008/03L-0.Detailed Event Analysis Encl | | | 05000344/LER-1982-009-03, /03L-0:on 820528,chemical & Vol Control Sys B Hut Partially Collapsed When Pumped to Spent Fuel Pit.Caused by Water Buildup in Sys,Allowing Partial Vacuum to Be Drawn on Tank.Hut Repaired | /03L-0:on 820528,chemical & Vol Control Sys B Hut Partially Collapsed When Pumped to Spent Fuel Pit.Caused by Water Buildup in Sys,Allowing Partial Vacuum to Be Drawn on Tank.Hut Repaired | | | 05000344/LER-1982-009, Forwards LER 82-009/03L-0.Detailed Event Analysis Encl | Forwards LER 82-009/03L-0.Detailed Event Analysis Encl | | | 05000344/LER-1982-010-03, /03L-0:on 820610,following Fuel Removal from Core, Spent Fuel Pool Level Was Inadvertently Pumped Below Min Limit.Caused by Personnel Error.Level Raised by Opening Transfer Canal Door.Level Switch Arm Straightened | /03L-0:on 820610,following Fuel Removal from Core, Spent Fuel Pool Level Was Inadvertently Pumped Below Min Limit.Caused by Personnel Error.Level Raised by Opening Transfer Canal Door.Level Switch Arm Straightened | | | 05000344/LER-1982-010, Forwards LER 82-010/03L-0.Detailed Event Analysis Encl. Corrected Copy | Forwards LER 82-010/03L-0.Detailed Event Analysis Encl. Corrected Copy | | | 05000344/LER-1982-011-03, /03T-0:on 820608,during Refueling,Safety Injection/Rcs Thermal Sleeve Matl Discovered Below Lower Core Plate.Caused by Vibration.Affected Sleeves Removed. Similar Thermal Sleeve Nozzles Radiographed | /03T-0:on 820608,during Refueling,Safety Injection/Rcs Thermal Sleeve Matl Discovered Below Lower Core Plate.Caused by Vibration.Affected Sleeves Removed. Similar Thermal Sleeve Nozzles Radiographed | | | 05000344/LER-1982-011, Forwards LER 82-011/03T-0.Detailed Event Analysis Encl | Forwards LER 82-011/03T-0.Detailed Event Analysis Encl | | | 05000344/LER-1982-019, Forwards LER 82-019/03L-0.Detailed Event Analysis Encl | Forwards LER 82-019/03L-0.Detailed Event Analysis Encl | | | 05000344/LER-1982-019-03, /03L-0:on 821007,safety Injection & Centrifugal Charging Pump Lube Oil Cooler Svc Water Valves Found W/O Locking Devices Nor Subjected to Surveillance Check.Caused by Valves Not Shown on Piping Instrument Diagram | /03L-0:on 821007,safety Injection & Centrifugal Charging Pump Lube Oil Cooler Svc Water Valves Found W/O Locking Devices Nor Subjected to Surveillance Check.Caused by Valves Not Shown on Piping Instrument Diagram | | | 05000344/LER-1982-020-03, /03L-0:on 821013,manual Filter Inlet Damper on Train a Control Room Emergency Ventilation Sys Found Closed, Isolating Fan VC-142A Suction Path from Control Room.Caused by Loose Setscrew.Improved Attachment Method Implemented | /03L-0:on 821013,manual Filter Inlet Damper on Train a Control Room Emergency Ventilation Sys Found Closed, Isolating Fan VC-142A Suction Path from Control Room.Caused by Loose Setscrew.Improved Attachment Method Implemented | | | 05000344/LER-1982-020, Forwards LER 82-020/03L-0.Detailed Event Analysis Encl | Forwards LER 82-020/03L-0.Detailed Event Analysis Encl | |
|