e Mr. _Norman C. Moseley, Office of Inspection and Enforcement--... __ _..,....
United States Nuclear Regulatory Commission Region II - Suite.818 230 Peachtree Street, Northwest Atlanta, Georgia 30303 Docket No. 50-281 License No. DPR-37
Dear Mr. Moseley:
Pursuant to Surry Power Station Technical Specification 6.6.B.l, the Virginia Electric and Power. Company hereby submits forty (40) copies of Abnormal Occurrence Report No. AO-S2-75~20.
The substance of this report has been reviewed by the Station Nuclear Safety and Operating Committee and will be placed on the agenda for the next meeting of the System Nuclear Safety and Operating Committee.
Enclosures 40 copies of AO-S2-75-20 cc:
Mr. Robert W. Reid Very truly yours,
~< 7$)_ vffcU&~
C. M. Stallings Vice President-Power Supply and Production Operations 1... -~
~I
\\j
AO-S2-7 5--2 U (PL-Z: PF'ilf'..'T /i.ll !-:ErnJ,Er.:D H'.;f':):~:,:.,Y'Z... *.. }
ucrnsEE NAh'~
~lvlA!siP!sl2I 7
8 9 14 CATEGORY REPORT TYPE UCEr-,S~ !'*JL1~,.'.~E=?
I o I o 1=--1 o I o I o I o I o 1-Jo I o I 15 25 REPORT SOURCE DOCKET NUM3ER i.;-- ~*., c..;:
[411!111! 11 26 30 EVENT DATE lVf:i\\.tT
- -YPE I o ! 1 J 31 32 REPORT DATE
@illcoN'T I PI o I l!J ~ I O I 5 I O_I -
IO I 2 I 8 I 1 I 11!2!11917151 o I l I o I z I 7 I ~J 7
8 57 58 59 60 61 68 69 74 75 80
EVENT DESCRIPTION
[Qlg] !During normal operation 7
8 9 of Unit No. 2 at 100 per cent power "C steam generator pres-J This is a violation of section 3.7 of
@EJ I sure indication-L196-Channel IV failed high.
7 8 9
@El I.Technical Specifications.
An immediate ra:npdmvn of 150 MWe per hour was initiated 7
89
~ Ian instrument technician*was dispatched to place the channel in the trip mode.
7 8 9 ffil§] I (AO-S2-7 5-20) 7 8 9 SYSTEM CODE
[£0 lclcl
CAUSE
CODE COMPONENT CODE Lci IP Ir !Pl E) xj xj 7
8 9 10 11 12 17 CAUSE DESCRIPTION PRIME COMPlJNE"JT SUP;:>UER
~
43 COMPONENT MANUFACTUREi1 121919191 44 47 VIOLATION
~
48
.@:.@] [_Examination of the failed transmitter revealed the sensing line to be frozen.
This 7
8 9 80 the I fJO and J 80 J
80 80
_J 80
@:§] I condition was caused by abnormally cold outside air being drawn through a set of in-
[
7 8 9 ITJ§] I take louver_s (located adjacent to the sensing line i.n the safeguards building (con' t) 8!
7 8 9 80 FACILITY METHOD 0~.
STATUS
% POWER OTHER STft.TUS DISCOVERY DISCOVERY DESCRIPTION EE]
~J I l I I I 01 Oj N/A w
N/A 7
8 9
10 12 13 44 45 46 80 FORM OF ACTIViTY CONTEIH rn RELEASED OF RELEft.SE AMOUi>JT OF ACTIVITY Lu wl N/A J
LN/A LOCATION OF RELEA.SE
_J 7
8 9
10 11 44 45 80 PERSmJNEL EXPOSURES NUMBER TYPE
DESCRIPTION
llEl !U2._L2..1 ~ L N/A 7
8 8 1*1 12 13 00 PERSONNEL INJURIES NUMBER
DESCRIPTION
EE] l__oj oj ~I L N/A 7
8 9 11 12;------------------*--------------------
_J 80 OFFSITE CONSEGlUENCES lilil L N/A
*_J 7
8 9 80 LOSS OR DAMAGE TO FACILITY TYPE
DESCRIPTION
~l~ I N/A
_______ _J 7
8 9 10 80 PUBLICITY (i0 l N/A 7
8 8 80 ADDITIONAL FACTORS li[~J jThe probability of a similar failure of another transmitter has been eliminated by J
7 8 9
!30
~ J sealing the_ intake lom~and,;,,~ill be furt~:r remov_ed by the installation_ (con' t) _ 8j N/.\\1\\/iE: __ ~_:___2;,* Baucom (80L1) 357--3 lc:-4
*----------------- PHONc. __________ _
r;ro 001, o6'l.
~
":! ~'
e CAUSE DESCRIPTION (can't) wall) and over the sensing line.
The louvers were closed and sealed allowing the line to thaw and the transmitter to be returned to normal service.
ADDITIONAL FACTORS (can't) of heat tracing on the sensing lines which are located adjacent to the ventilation louvers.
The ability of the safety injection system to perform its function was in no *way impaired by this failure.
Although the transmitter failed in the nonconservative direction (drifted high) it was only in this condition for a brief period of ti.T11e before it was placed in the trip mode.
In addition the other t,rn rewaining channels were in proper working order and could have provided a safety injection signal, if required, since only two out of three channels are required to initiate a safety injection.
The health and saf.ety of the general public was in no way endangered since the safety injection system was able to perform its intended function at all times during this occurrence~
This is a similar occurrence to that noted on Unit No. 1 on December 19, 1975.
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000280/LER-2075-001, For Surry Power Station, Unit 1, Debris in Reactor Vessel | For Surry Power Station, Unit 1, Debris in Reactor Vessel | | | 05000280/LER-2075-002, Ventilation Vent Gaseous Release and Liquid Release | Ventilation Vent Gaseous Release and Liquid Release | | | 05000280/LER-2075-003, (Special Report SR-Sl-75-03) for Surry Unit 1 Ventilation Vent Gaseous Activity | (Special Report SR-Sl-75-03) for Surry Unit 1 Ventilation Vent Gaseous Activity | | | 05000280/LER-2075-004, Submit Special Report No. SR-S1-75-04 Re Ventilation Vent Gaseous Release | Submit Special Report No. SR-S1-75-04 Re Ventilation Vent Gaseous Release | | | 05000280/LER-2075-005, For Surry Power Station, Unit 1, Ventilation Vent Gaseous Release | For Surry Power Station, Unit 1, Ventilation Vent Gaseous Release | | | 05000280/LER-2075-006, Re Consequence Limiting Safeguard High-High Train B Would Not Initiate When 3/4 Matrix of Channels 1,2 & 3 Were Tripped | Re Consequence Limiting Safeguard High-High Train B Would Not Initiate When 3/4 Matrix of Channels 1,2 & 3 Were Tripped | | | 05000280/LER-2075-007, Forwarding Abnormal Occurrence Report No. AO-S1-75-07 | Forwarding Abnormal Occurrence Report No. AO-S1-75-07 | | | 05000280/LER-2075-008, Supplementary Information to LER 1975-008-00 for Surry 2 Re Inadequate Implementation of Administrative Controls During Construction & Preoperation of Facility | Supplementary Information to LER 1975-008-00 for Surry 2 Re Inadequate Implementation of Administrative Controls During Construction & Preoperation of Facility | | | 05000280/LER-2075-009, Re Less than Required 60,000 Gallons of Water in Above Ground Emergency Condensate Storage Tank | Re Less than Required 60,000 Gallons of Water in Above Ground Emergency Condensate Storage Tank | | | 05000280/LER-2075-010, Re Seal Leakage of Service Water Pump 2-SW-P-4B | Re Seal Leakage of Service Water Pump 2-SW-P-4B | | | 05000280/LER-2075-011, Re Inoperable 4 Kv Undervoltage Protection | Re Inoperable 4 Kv Undervoltage Protection | | | 05000280/LER-2075-012, Re Sudden Closure of Main Steam Trip Valve in B Steam Line, Causing Closure of a & C Trip Valves & Reactor Trip | Re Sudden Closure of Main Steam Trip Valve in B Steam Line, Causing Closure of a & C Trip Valves & Reactor Trip | | | 05000280/LER-2075-013, Re One Channel T Protection Was Not Conservative | Re One Channel T Protection Was Not Conservative | | | 05000280/LER-2075-014, Re 11.4% of Boron Concentration by Weight in Boron Injection Tank Sample | Re 11.4% of Boron Concentration by Weight in Boron Injection Tank Sample | | | 05000280/LER-2075-015, Re Closure of Boron Injection Tank Recirculation Valves TV-2884A, B, C | Re Closure of Boron Injection Tank Recirculation Valves TV-2884A, B, C | | | 05000280/LER-2075-016, Re 60% Power Low Level Alarm on C Boric Acid Tank | Re 60% Power Low Level Alarm on C Boric Acid Tank | | | 05000280/LER-2075-016-01, Submit Updated Abnormal Occurrence Report No. AO-S1-75-16 Re Channel II T/Tavg Protection Drift in Nonconservative Direction | Submit Updated Abnormal Occurrence Report No. AO-S1-75-16 Re Channel II T/Tavg Protection Drift in Nonconservative Direction | | | 05000280/LER-2075-017, Re Failure Low of Loop C Hot Leg RTD, Causing Protection Signals to Fail Low | Re Failure Low of Loop C Hot Leg RTD, Causing Protection Signals to Fail Low | | | 05000280/LER-2075-018, Re Steam Generator Level Transmitter Isolation Valve Body to Bonnet Leak | Re Steam Generator Level Transmitter Isolation Valve Body to Bonnet Leak | | | 05000280/LER-2075-019, Reporting Abnormal Occurrence of 10/15/1975: 15 Minutes Interruption of Recirculation of 2 Boron Injection Tank Due to Failure of D Boric Acid Transfer Pump Motor | Reporting Abnormal Occurrence of 10/15/1975: 15 Minutes Interruption of Recirculation of 2 Boron Injection Tank Due to Failure of D Boric Acid Transfer Pump Motor | | | 05000280/LER-2075-020, Re Power C Generator Pressure Indication-496-Channel IV Failed High | Re Power C Generator Pressure Indication-496-Channel IV Failed High | | | 05000280/LER-2075-021, Re 6% Low Reading of T Protection Channel 1 | Re 6% Low Reading of T Protection Channel 1 | | | 05000280/LER-2075-021-01, Submit Reportable Occurrence No. AO-S1-75-21 Update Re Safety Injection Master Relay Failed to Latch When Performance Test 18.2 Was Being Performed on One Train | Submit Reportable Occurrence No. AO-S1-75-21 Update Re Safety Injection Master Relay Failed to Latch When Performance Test 18.2 Was Being Performed on One Train | | | 05000280/LER-2075-022, Re Setpoint Drift in Nonconservative Direction, Contrary to Tech Spec 2.3.A.2 | Re Setpoint Drift in Nonconservative Direction, Contrary to Tech Spec 2.3.A.2 | | | 05000280/LER-2075-023, For Surry Power Station, Unit 1, at Refueling Shutdown, During Performance of Periodic Calibration of Pressurizer Instrumentation, Channels P-1-455, P-1-P456, & P-1-457 Were Found to Be Indicating High by 26.4 Psi, 42.0 Psi & 2 | For Surry Power Station, Unit 1, at Refueling Shutdown, During Performance of Periodic Calibration of Pressurizer Instrumentation, Channels P-1-455, P-1-P456, & P-1-457 Were Found to Be Indicating High by 26.4 Psi, 42.0 Psi & 29.4 Psi | | | 05000280/LER-2075-024, For Surry Power Station, Unit 1, Performance of Type a Containment Leak Rate Test as Required by Appendix J of 10 CFR Revealed That Overall Integrated Containment Leakage Rate Was Greater than Acceptance Criterion | For Surry Power Station, Unit 1, Performance of Type a Containment Leak Rate Test as Required by Appendix J of 10 CFR Revealed That Overall Integrated Containment Leakage Rate Was Greater than Acceptance Criterion | | | 05000280/LER-2075-025, For Surry Power Station, Unit 1, an Uncontrolled & Unplanned Release of Low Level Radioactive Material Occurred in Violation of Tech Spec 3.11 | For Surry Power Station, Unit 1, an Uncontrolled & Unplanned Release of Low Level Radioactive Material Occurred in Violation of Tech Spec 3.11 | | | 05000280/LER-2075-026, For Surry Power Station, Unit 1, with Unit Shutdown, Auxiliary Feedwater Pump Discharge Valve MOV-FW-151A Failed to Automatically Open When Both Main Feed Pumps Were Locked Out | For Surry Power Station, Unit 1, with Unit Shutdown, Auxiliary Feedwater Pump Discharge Valve MOV-FW-151A Failed to Automatically Open When Both Main Feed Pumps Were Locked Out | | | 05000280/LER-2075-027, For Surry Power Station, Unit 1, an Uncontrolled & Unplanned Release of Low Level Radioactive Material Occurred in Violation of Tech Spec 3.11 | For Surry Power Station, Unit 1, an Uncontrolled & Unplanned Release of Low Level Radioactive Material Occurred in Violation of Tech Spec 3.11 | | | 05000280/LER-2075-028, For Surry Power Station, Unit 1, with Unit Shutdown, Auxiliary Feedwater Pump Discharge Valve NOV-FW-151A Failed to Automatically Open When Low-Low Level Was Experienced During Draining of B Steam Generator | For Surry Power Station, Unit 1, with Unit Shutdown, Auxiliary Feedwater Pump Discharge Valve NOV-FW-151A Failed to Automatically Open When Low-Low Level Was Experienced During Draining of B Steam Generator | | | 05000280/LER-2075-029, For Surry Power Station, Unit 1, While in Cold Shutdown for Maintenance It Was Desired to Shut Valves MOV-1289A & B (Normal Charging Line Stop Valves) from Control Room | For Surry Power Station, Unit 1, While in Cold Shutdown for Maintenance It Was Desired to Shut Valves MOV-1289A & B (Normal Charging Line Stop Valves) from Control Room | | | 05000280/LER-2075-030, For Surry Power Station, Unit 1, While Operating at 100 Percent Power a Component Cooling Water/Service Water Heater Exchanger Was Opened for Cleaning | For Surry Power Station, Unit 1, While Operating at 100 Percent Power a Component Cooling Water/Service Water Heater Exchanger Was Opened for Cleaning | | | 05000280/LER-2075-031, For Surry Power Station, Unit 1, During Normal Operation of Unit No. 1, at 100 Percent Power C Steam Generator Pressure Indication-494-Channel II Failed High | For Surry Power Station, Unit 1, During Normal Operation of Unit No. 1, at 100 Percent Power C Steam Generator Pressure Indication-494-Channel II Failed High | |
|