LER-1981-005, Forwards Updated LER 81-005/01X-1 |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 2751981005R00 - NRC Website |
|
text
es PACIFIC GAS AND E LE C T RI C C O M PANY 71 HEALE S T h E E T, SAN F R A N CISC O, C ALIFORNI A 94106 T E LI PHON E (415) 781-4211 i.
P O OOx / 4 4.)
SAN f F A N CI'.C U, CAllf0PNIA 94120 TE L ECOrif R (415) 543 7813 ROBERT O H L FS A C H
.<t tw, a.
as s
.a at u%r r CHARLEST VAN DEUSEN [d
N.
% a
-.w a
s PHILIPA. CRANEJR t
em se t
4=
9 0 =*
I 8s HENHY J.LePLANTE s
Y e %e
.. +
~ *
- a%
ea JOHN
i ' ' '
[6 s
2 a
ARTHUN L. HILLMAN,JR.
u I. ',.
"(.',I$d '
. [ tessa%
E I
=t C, H A R L E 5 W.
YHiS5 ELL
.[~~~,_y
..'. ' E' s
.. al.Ya, [e.
.,1 me, c DANIFL E. 06BSON
[ *. ) v.' )
C*
JACH F. F A L L I N, JH, January 14, 1982 sosEPH.- *eL<
,,H,,
a
,m Mr. R. H. Engelken, Director e of Inspection and Enforcement U. S. Nuclear Regulatory Commission a
1450 Maria Lane, Suite 210 d.... _WED Walnut Creek, CA 94596 4.
I.W 'l O &*&*'
.v m
Q9gettwra Re:
Docket No. 50-275 License No. OPR-76 rd'D Licensee Event Report 81-005/01X-1 e
f
Dear Mr. Engelken:
Pursuant to Section 6.9.1.12.i of Appendix A of the Technical Specifications to the Diablo Canyon Unit 1 Operating Lictn u, the enclosed Revision I to Licensee Event Report 81-005/0lX-1 is submittd regarding the discovery of cracks in several cells of the station battery.
This revision explains the cause of failure and the corrective actions being taken.
This incident has in no way affected the safety and health of the public.
Very truly yours,
/
l lJ
/
Enclosure cc (w/ enc.):
Mr. Frank J. Miragli, Jr., Chief t
Licensing Branch No. 3 Division of Licensing Office of Nuclear Reactor Regulation s
U. S. Nuclear Regulatory Commission L
9 m
Washington, D. C.
20555 i.~d Director M
Office of Management Information and
('.
Program Control U. S. Nuclear Regulatory Commission
[,,
Washington, D. C.
20555
,. ~
- 8 2 0121 o soo f"'" Li
I D-07
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000275/LER-1981-001, Forwards LER 81-001/01T-0 | Forwards LER 81-001/01T-0 | | | 05000275/LER-1981-001-01, /01T-0:on 810922,prior to Fuel Load,Review of Reportability of Inoperable Plant Vent Rod Monitoring Channels RM-14A & B Revealed That Required STS 3.3.3.10 Action Statements 52 & 53 Had Not Been Entered | /01T-0:on 810922,prior to Fuel Load,Review of Reportability of Inoperable Plant Vent Rod Monitoring Channels RM-14A & B Revealed That Required STS 3.3.3.10 Action Statements 52 & 53 Had Not Been Entered | | | 05000275/LER-1981-002, Forwards Updated LER 81-002/01X-6 | Forwards Updated LER 81-002/01X-6 | | | 05000323/LER-1981-002, Interim Deficiency Rept Re Inadequate Design of Sys Contained in Annulus Area of Containment Bldg,Initially Reported 811105.Further Info of Progress Is Identified in Suppls to LER 81-002 | Interim Deficiency Rept Re Inadequate Design of Sys Contained in Annulus Area of Containment Bldg,Initially Reported 811105.Further Info of Progress Is Identified in Suppls to LER 81-002 | | | 05000275/LER-1981-002-01, Error Discovered in Diagram Used to Locate Vertical Seismic Floor Response Spectra for Equipment & Sys Seismic Design.Caused by Erroneous Use of Unit 2 Diagram for Unit 1 | Error Discovered in Diagram Used to Locate Vertical Seismic Floor Response Spectra for Equipment & Sys Seismic Design.Caused by Erroneous Use of Unit 2 Diagram for Unit 1 | | | 05000275/LER-1981-003-03, Liquid Radwaste Effluent Line Radiation Monitor RM-18 Found Inoperable.Caused by Separated Ctr Wire in Coax Connector Cable at Junction Between Connector Pin & Wire.Design Revised | Liquid Radwaste Effluent Line Radiation Monitor RM-18 Found Inoperable.Caused by Separated Ctr Wire in Coax Connector Cable at Junction Between Connector Pin & Wire.Design Revised | | | 05000275/LER-1981-003, Forwards LER 81-003/03L-0 | Forwards LER 81-003/03L-0 | | | 05000275/LER-1981-004-03, /03L-0:on 810922,during Core Load Status Review, Oily Water Separator Effluent Line Radiation Monitor Found Invalidated.Caused by Unauthorized Readjustment of Monitor Controls.Monitor to Be Recalibr & Personnel Trained | /03L-0:on 810922,during Core Load Status Review, Oily Water Separator Effluent Line Radiation Monitor Found Invalidated.Caused by Unauthorized Readjustment of Monitor Controls.Monitor to Be Recalibr & Personnel Trained | | | 05000275/LER-1981-004, Forwards LER 81-004/03L-0 | Forwards LER 81-004/03L-0 | | | 05000275/LER-1981-005-03, /03L-0:on 811015,prior to Fuel Load,During Insp in Conjunction W/Surveillance Testing,Battery Cell Case Found Weeping.Apparently Caused by Inadequate Support Leading to Cracking.Investigation Underway Re Mods | /03L-0:on 811015,prior to Fuel Load,During Insp in Conjunction W/Surveillance Testing,Battery Cell Case Found Weeping.Apparently Caused by Inadequate Support Leading to Cracking.Investigation Underway Re Mods | | | 05000275/LER-1981-005-01, During Insp,Battery Cell Case Found Weeping.Further Insp Revealed 17 Cells W/Cracks Near Molded Support Ribs on Bottom of Cases.Caused by Inadequate Support of Cells.Racks Modified & Cells Replaced | During Insp,Battery Cell Case Found Weeping.Further Insp Revealed 17 Cells W/Cracks Near Molded Support Ribs on Bottom of Cases.Caused by Inadequate Support of Cells.Racks Modified & Cells Replaced | | | 05000275/LER-1981-005, Forwards Updated LER 81-005/01X-1 | Forwards Updated LER 81-005/01X-1 | | | 05000275/LER-1981-006, Forwards LER 81-006/03L-0 | Forwards LER 81-006/03L-0 | | | 05000275/LER-1981-006-03, /03L-0:on 811103,daily Channel Check on Plant Vent Flow Recorder Not Performed.Caused by Operator & Reviewer Failure to Note Step on Checklist.Operators Instructed & Procedure Simplified | /03L-0:on 811103,daily Channel Check on Plant Vent Flow Recorder Not Performed.Caused by Operator & Reviewer Failure to Note Step on Checklist.Operators Instructed & Procedure Simplified | | | 05000275/LER-1981-007, Forwards LER 81-007/03L-0 | Forwards LER 81-007/03L-0 | | | 05000275/LER-1981-007-03, /03L-0:on 811125,discovered That Tech Specs Surveillance Requirement 4.11.2.4.1 Re Project Doses Due to Gaseous Releases from Plant Not Performed within Required Time Interval.Caused by Personnel Oversight | /03L-0:on 811125,discovered That Tech Specs Surveillance Requirement 4.11.2.4.1 Re Project Doses Due to Gaseous Releases from Plant Not Performed within Required Time Interval.Caused by Personnel Oversight | | | 05000275/LER-1981-008-03, /03L-0:on 811130,discovered That Gross Alpha Activity Analysis Had Not Been Performed within Required Time Interval.Caused by Personnel Oversight.Sample Counted on 811130 | /03L-0:on 811130,discovered That Gross Alpha Activity Analysis Had Not Been Performed within Required Time Interval.Caused by Personnel Oversight.Sample Counted on 811130 | | | 05000275/LER-1981-008, Forwards LER 81-008/03L-0 | Forwards LER 81-008/03L-0 | | | 05000275/LER-1981-009, Forwards LER 81-009/03L-0 | Forwards LER 81-009/03L-0 | | | 05000275/LER-1981-009-03, /03L-0:on 811211,operator Failed to Perform Daily Channel Check on Iodine Sampler Flow Rate Monitor.Caused by Inadequate Instructions for Verifying Annunciator Window Operability.Procedure Change Issued | /03L-0:on 811211,operator Failed to Perform Daily Channel Check on Iodine Sampler Flow Rate Monitor.Caused by Inadequate Instructions for Verifying Annunciator Window Operability.Procedure Change Issued | | | 05000275/LER-1981-010-03, /03L-0:on 811217,prior to Fuel Load,Documentation for Gross Gamma Analysis of Weekly Composite Sample for Oily Water Separator Discovered Missing for 811029-1119.Sheets Apparently Misplaced.Procedure Revised | /03L-0:on 811217,prior to Fuel Load,Documentation for Gross Gamma Analysis of Weekly Composite Sample for Oily Water Separator Discovered Missing for 811029-1119.Sheets Apparently Misplaced.Procedure Revised | | | 05000275/LER-1981-010, Forwards LER 81-010/03L-0 | Forwards LER 81-010/03L-0 | |
|