05000272/LER-1981-080, Forwards LER 81-080/03L-0.Detailed Event Analysis Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 81-080/03L-0.Detailed Event Analysis Encl
ML20049A731
Person / Time
Site: Salem PSEG icon.png
Issue date: 09/21/1981
From: Midura H
Public Service Enterprise Group
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20049A732 List:
References
NUDOCS 8110020186
Download: ML20049A731 (3)


LER-1981-080, Forwards LER 81-080/03L-0.Detailed Event Analysis Encl
Event date:
Report date:
2721981080R00 - NRC Website

text

lrl(

- O PSEG.

Public Service Electric and Gas Company P.O. Box 166 Hancocks Bridge, New Jersey 08038 Salem Generating Station Sectember 21, 1981 A

REl[l s

Mr.

R. C. Haynes

~

e-0072 Director of USNRC Office of Inspection and Enforcement

.~

y,4 IO8lA -S Region 1 k%g 4 631 Park Avenue King of Prussia, Pennsylvania 19406 h

N

Dear Mr. Haynes:

LICENSE NO. DPR-70 DOCKET NO. 50-272 REPORTABLE OCCURRENCE 81-80/03L Pursuant to the requirements of Salem Generating Station Unit No. 1, Technical Specifications, Section 6.9.1.9.b, we are submitting Licensee Event Report for Reportable Occurrence 81-80/03L.

This report is required within thirty (30) days of the occurrence.

Sincerely yours, j

L4ht

( ---

H.

J. Midura Manager - Salem Generating Station CC:

R.

A Uderitz General Manager - Nuclear Production Director, Office of Inspection l

and Enforcement (30 copies)

Director, Office of Management i

Information and Program Control l

(3 copies) 6I g i

^'8110020186 810921 PDR ADOCK 05000272 S

PDR The Energy People 9521891125M) 1180 v-

Report Number:

81-80/03L Report Date:

9-21-81 Occurrence Date:

8-24-81 Facility:

Salem Generating Station, Unit 1 Public Service Electric & Gas Company Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

No. 13 Containment Fan Coil Unit - Inoperable.

This report was initiated by Incident Report 81-341.

CONDITIONS PRIOR TO OCCURRENCE:

Mode 1 - Rx Power 96% - Unit Load 1040 MWe PP3CRIPTION OF OCCURRENCE:

g On August 24, 1981, the control operator noticed that No. 13 containment fan coil unit (CFCU) indicated no service water flow in high speed.

Investigation revealed a substantial leak on 13SW72, a valve upstream of the flow transmitter.

The leak was in the penetration area, and was isolated.

At 2215 hours0.0256 days <br />0.615 hours <br />0.00366 weeks <br />8.428075e-4 months <br />, August 24, 1981, No. 13 CFCU was declared inoperable and action statement 3.6.2.3.a was entered.

This occurrence constituted operation in a degraded mode in accordance with technical specification 6.9.1.9.b.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

The leak was emanating from a hole in the weld on the pipe flange on 13SW72.

ANALYSIS OF OCCURRENCE:

Action statement 3.6.2.3.a requires:

With one group of containment cooling fans inoperable and both Containment Spray Systems operable, restore the inop-erable group of cooling fans to operable status within 7 days or be in at least hot standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

LER 81-80/03L t

}

CORRECTIVE ACTION

The pipe flange was rewelded and tested satisfactorily.

No. 13 CFCU was returned to service, and at 1230 hours0.0142 days <br />0.342 hours <br />0.00203 weeks <br />4.68015e-4 months <br />, August 30,.1981, action statement 3.6.2.3.a was terminated.

FAILURE DATA:

i Weld on 13SW72 pipe flange.

l. 'l' /. (/.aYL Prepared By F.

Dickey Manager - Salem Ghnerating Station,_