Regarding Gaps in the Control Room Emergency Zone Boundary
ML042720229
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/20/2004
From: Korsnick M
Constellation Energy Group
To: Clark R
Document Control Desk, Office of Nuclear Reactor Regulation
References
LER 04-001-00
Download: ML042720229 (6)


LER-2004-001, Regarding Gaps in the Control Room Emergency Zone Boundary
Event date:
Report date:
2442004001R00 - NRC Website

text

Maria Korsnick 1503 Lake Road Vice President Ontario, New York 14519-9364 585.771.3494 585.771.3943 Fax maria.korsnick@constellation.com Constellation Energy R.E. Ginna Nuclear Power Plant September 20, 2004 Mr. Robert L. Clark Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

LER 2004-001, Gaps in the Control Room Emergency Zone Boundary R.E. Ginna Nuclear Power Plant Docket No. 5 0-244

Dear Mr. Clark:

The attached Licensee Event Report (LER) 2004-001 is submitted in accordance with 10 CFR 50.73, Licensee Event Report System, items (a)(2)(ii)(B) and (a)(2)(v)(D).

This event has in no way affected the public's health and safety.

Very truly yours, ar.orsnick xc:

Mr. Robert L. Clark (Mail Stop 0-8-C2)

Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector (001155

<162

Abstract

During a control room emergency zone boundary inspection several gaps (totaling approximately 117.7 square inches) were discovered between the armor plate east wall and the control room floor. This exceeded the 5.25 square inch limit specified in Technical Specification (TS) 3.7.9 Bases, requiring Potassium Iodide (KI) to be credited as a compensatory measure until the gaps were sealed.

Corrective action to prevent recurrence is outlined in Section V.B.

NRC FORM 366(7-2001)

(If more space is required, use additional copies of (If more space is required, use additional copies of (if more space is required, use additional copies of NRC Form 366A)

Other events/Action Reports (AR) related to the CREZ but not reported as LERs AR 2004-1634 - Gaps in the Boundary of the Control Room Emergency Zone AR 2004-1405 - Control Room Roof Leak in Northeast Corner AR 2003-3112 - Control Room Envelope (roof leak)

AR 2003-1720 - Control Room Roof Leak AR 2003-1710 - Leakage Noticed From Control Room Ceiling AR 2003-0113 - Water Spots on Control Room Ceiling Tiles AR 2003-0073 - Water Damage to Control Room Ceiling Tiles AR 2001-1154 - 4 Leaks Found in the Control Room Air Handling Room AR 2001-2051 - Small Hole in Control Room Vent Ductwork C.

THE ENERGY INDUSTRY IDENTIFICATION SYSTEM (EHS) COMPONENT FUNCTION IDENTIFIER AND SYSTEM NAME OF EACH COMPONENT OR SYSTEM REFERRED TO IN THIS LER:

COMPONENT IEEE 803 IEEE 805 FUNCTION IDENTIFIER SYSTEM IDENTIFICATION CREZ SEAL NA D.

SPECIAL COMMENTS:

None